Loading...
HomeMy WebLinkAboutCity Council Packet 06-12-2018(RECAP AGENDA) CITY OF PLYMOUTH AGENDA REGULAR COUNCIL MEETING JUNE 12, 2018, 7:00 p.m. 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ROLL CALL 3. PLYMOUTH FORUM Individuals may address the Council about any item not contained on the regular agenda. A maximum of 15 minutes is allotted for the Forum. If the full 15 minutes are not needed for the Forum, the City Council will continue with the agenda. The City Council will take no official action on items discussed at the Forum, with the exception of referral to staff or Commission for future report. 4. PRESENTATIONS AND PUBLIC INFORMATION ANNOUNCEMENTS 4.01 Announce Music in Plymouth and 5k Run (Plymouth Civic League) 4.02 Accept donation from the Plymouth Rotary Club for the Rotary Tree Walk that was held on June 2 at Lake Camelot Park (Plymouth Rotary Club) 5. APPROVE AGENDA—Councilmembers may add items to the agenda including items contained in the Council Information Memorandum for discussion purposes or staff direction only. The Council will not normally take official action on items added to the agenda. 6. CONSENT AGENDA—These items are considered to be routine and will be enacted by one motion. There will be no separate discussion of these items unless a Councilmember or citizen so requests, in which event the item will be removed from the Consent Agenda and placed elsewhere on the agenda. (Approved) 6.01 Approve proposed City Council Minutes 6.02 Approve disbursements (Res2018-207) 6.03 Accept Community Partnership Grant from CenterPoint Energy (Res2018-208) 6.04 Approve Wetland Replacement Plan for the Kilmer Lane Street Reconstruction Project (189001.001 – Res2018-209) Regular Council Meeting 1 of 3 June 12, 2018 7. 91 6.05 Award contract for 2019 Mill and Overlay Utility Maintenance project (ST 199004.001 — Res2018-210) 6.06 Approve acquisition of permanent easement for street, drainage, and utility purposes for State Highway 55 frontage road reconstruction project (13 002 — Res2018-211) 6.07 Deny access to Ferndale Road North for property located at 515 Alvarado Lane North (2018041 — Res2018-212) 6.08 Approve Encroachment Agreement for sign and light poles at Cherrywood Pointe located at 18405 Old Rockford Road (Res2018-213) 6.09 Approve Conditional Use Permit to allow a columbarium at the south side of the church building located at 5005 Northwest Boulevard (Beautiful Savior Lutheran Church — 2017100 — Res2018-214) 6.10 Approve water and sanitary sewer assessments for new Wayzata elementary school for property located at 18995 54th Avenue North (2018004 — Res2018- 215) 6.11 Approve Final Plat, Development Contract and Assessments for "Plymouth Reserve" on property located at 5330 Vicksburg Lane (Serenity on the Green, Inc. — 2017105 — Res2018-216, Res2018-217) 6.12 Approve one-year extension of the preliminary plat approved for "Avonlea Place" located at 4465 Vicksburg Lane (Gulova — 2015032 — Res2018-218) PUBLIC HEARINGS 7.01 Public improvement and special assessment hearing and award contract for the Troy Lane reconstruction project (ST 180002 — Res2018-219, Res2108-220, Res2018-221) (Approved) GENERAL BUSINESS 8.01 Consider Emerald Ash Borer Management Plan initiatives (Res2018-222) (Approved) 8.02 League of Minnesota Cities and Metro Cities policy committees Regular Council Meeting 2 of 3 June 12, 2018 9. REPORTS AND STAFF RECOMMENDATIONS 10. ADJOURNMENT Regular Council Meeting 3 of 3 June 12, 2018 3525 Vicksburg Ln. N. Ste 400 Plymouth, MN 55447 June 12, 2018 Dear Mayor and Council Members of the City of Plymouth, Thank you in advance for hearing our concerns about Ordinance 1135 for New Massage Therapist Licenses and I apologize for not attending the City Council Meeting as I have to coach my son's team tonight. Now that some time has passed since the ordinance was updated, I would like to give you some feedback on how it has impacted my business. Hopefully we can find a win-win solution which maintains the protection of the citizens of Plymouth, while supporting local businesses. We opened Hand & Stone Massage and Facial Spa in 2014, which is part of a national franchise chain with over 360 spas open in the U.S. and Canada. We serve clients looking for health and wellness solutions and have created over 30 jobs. We are audited quarterly by our Franchise Corporation for compliance on our mandatory annual Code of Ethics Certification, service provider insurance requirements, background checks and licenses. We take our client's safety very seriously and have these processes in place to ensure accountability. Our business is dependent upon attracting and retaining qualified massage therapists, who have an industry average career span of 5 years. Unfortunately, we continue to lose out on candidates who go to nearby cities who have none or easier licensing requirements. We are also losing massage therapists to peer-to-peer platforms like Sooth or Zeel (massage therapists that come to your home), who classify massage therapists as independent contractors and pay no payroll or real estate taxes like we do. All liability is placed on the massage therapist's shoulders for licensing and it is virtually impossible to ensure compliance for the cities with license requirements. We are trying to manage potential employment candidates' expectations as much as possible, but sometimes lose them because of the long turnaround times. Our spa recently missed out on two excellent candidates with licenses from other states that have higher massage therapy license requirements. One was even an Olympic Gold Medalist who now is working in Minneapolis as it took too long for his out of state schools to send a certified transcript. We appreciate the City's Licensing Department as we firmly believe they are doing everything they can to expedite the process, but the biggest delay seems to be the requirement to have the massage therapist's school mail in a certified copy of their transcript before issuing a license. Going through the right channels to secure transcripts can take time and our candidates need to earn a living. Some schools have closed which can lengthen the transcript process and or the massage therapist is dependent upon a school's administration department to expedite the process, who have no financial incentive to get it in the mail as soon as possible. A possible solution would be to issue 3 month temporary licenses after passing the Police Department's background check and accepting a copy of their transcript. The massage therapist now has time to get a certified transcript mailed, while earning living. Once the City receives a transcript, it can issue a normal 1 -year license. To add to the administrative cost, the City could charge an extra fee for the "expedited process." Thank you for your time and consideration. Sincerely, Elliott Randolph Spa Owner Hand & Stone Massage and Facial Spa — Plymouth Mobile: 952-913-7610 Email: erandolph(c7i,handandstone.com CURRENT MT APPLICATION PPROCESS: PROBLEMS AND SOLUTIONS -13 6/12/18 NEW requirements for applicants or changes to application process • BEFORE submitting application to city, a completed background check of the applicant by the employer has to be COMPLETED and submitted with application. o PROBLEM ■ Cannot bring applicant to city same day as hiring. All other paperwork has been completed. Delayed start to application process • Used to bring applicant to the city same day of interview/hire while background check was processing • Now have to wait until background check is completed, received and then plan time when it works for applicant to meet us at city to drop the application. o SOLUTION ■ Accept application with proof that the background check is currently processing. This will prove the employer is following city law and doesn't delay the process. • Must send verified transcript from school directly to City of Plymouth o PROBLEM ■ Delayed process verifying diploma. Depending if the school is near or far, open or closed etc, the turnaround time for this varies greatly. o SOLUTION ■ Accept application with copy of diploma or certified hours. This will prove the employer is following city law, the applicant has the proper education and doesn't delay the process. 60 -day grace period to receive certified copy from school. • 30 Day Turn -Around Time for License Process o PROBLEM ■ No one can or will afford to wait for up to 30 days for the application to process. They need to work ASAP. • Reasons: Already put in 2 -week notice, just moved into area, starting employment, student, hate current job, need money to pay for kids/bills/shelter/food. o SOLUTION ■ Max 2 -week or 10 business day processing period (previous process). This allows the employer to guarantee work in a timely manner, open up the prospect applicants schedule so they have clients when they start on the schedule, and that they won't be without pay to support life. • Person responsible to move applications through the process and accept/deny o PROBLEM 1 -person show: One person is in charge of this very important and timely process with no one to back them up. If they don't do it, no one does. This one person works part-time and isn't available (like other city employees) 5 days a week. o SOLUTION ■ Have one full-time employee dedicated to this process and a 2^d and/or 3,d person cross - trained in this process to be able to help move it along when the other people are out of the office. Past COMMUNICATION Massage Envy Plymouth had a great relationship with Natalie and the City as we worked together to accomplish the goal of moving the applicant through the licensing process properly and get them working serving the people of Plymouth. PAST processes when licensing was done through the city. o Natalie Dorcy would be in contact with both the applicant and the employer through the application process. If something was missing, wrong, or any issue, both parties would be notified. o Business could email or bring in any missing information from application for applicant if the applicant couldn't make it to the city in a timely manner. o Open communication: Checking in the status of the application — "Hi Natalie, how is the application process moving along? Is there anything I can do to help you?" —This was a welcomed conversation that was very productive for the city, applicant and business. o Emailed employer of applicant's denial or acceptance. ■ Denial: Applicant would be mailed a letter to stating denial and reason ■ Approved: Called applicant notifying approval and that license is ready to be picked up. Current COMMUNICATION • Licensing is now handled by the Plymouth Police department and the previous processes of communication with the employer have been abandoned. o The business is no longer able to have any of the above communication. We used to have some communication via e-mail but have been since been informed that communication will be between the Police and the applicant. ■ If the application has any issues, missing information etc, only the applicant will be notified (not sure by what means or when). We the employer trying to help the applicant are left in the dark o Business isn't able to provide any of the applicants' information (for any reason: even if missing or lost in the process and we have copies on file in our office) o Application Denied Not sure communication to applicant. No communication to employer. Just sent a refund check for $75 with no information denoting what it's for. o Application Accepted ■ Inconsistent communication to applicant, seen variable response times and approaches to connecting. ■ Inconsistent communication to employer SOLUTION Allow open communication from Police to both applicant and employer. o Let the employer do its job in helping the future employee all the while assisting the city in anything they need. ■ Legal: If this presents a legal problem, upon hiring we can have the applicant sign a document stating they approve our involvement in all matters concerning licensing/application in the city of Plymouth and submit this with the application packet. • Keep applicant and employer informed during process. • When a problem arises, road bump, or part of the application process is taking a while (transcript), notifying both applicant and employer. • Application Accepted or Denied: Consistent and immediate notification to both applicant and employer. 6.01 Proposed Minutes City Council Special Meeting May 22, 2018 Mayor Slavik called a Special Meeting of the Plymouth City Council to order at 5:00 p.m. in the Medicine Lake Room of City Hall, 3400 Plymouth Boulevard, on May 22, 2018. COUNCIL PRESENT: Mayor Slavik, Councilmembers Prom, Wosje, Willis, Davis, and Carroll. ABSENT: Councilmember Johnson. ENVIRONMENTAL QUALITY COMMITTEE PRESENT: Committee Members Senne, Prokop, Hoes, Osborne, Williamson, Polzin, and Gregor. ABSENT: None. STAFF PRESENT: City Manager Callister, Administrative Services Director Hokkanen, Public Works Director Thompson, Economic Development Manager Landhauser, Park and Recreation Director Evans, Water Resources Manager Asche, Community Development Director Juetten, and City Clerk Engdahl. Organics Recycling Ben Knudson from Hennepin County provided a presentation on organics recycling. He stated Hennepin County will be preparing a draft ordinance requiring organics recycling, soliciting feedback, and the County Board acting on the final ordinance. The Council requested the Environmental Quality Committee to provide comments to Hennepin County after they receive the draft ordinance. Concept Plans for Redevelopment of Ramada Site Mike Mergens and Casey Darkenwald of Asguard Development LLC, presented a very high level concept plan for potential redevelopment opportunities for the general area south of Highway 55 between I-494 and Xenium Lane (focus centered on the Ramada Hotel and Red Roof Inn sites). The Council stated they are interested but need further information and materials on the concept plan and the amount of tax increment financing that would be requested. Future Study Sessions No study sessions were scheduled. Proposed Minutes 1 of 2 Special Meeting of May 22, 2018 Page Adjournment Mayor Slavik adjourned the Special Meeting at 6:57 p.m. Sandra R. Engdahl, City Clerk Proposed Minutes 2 of 2 Special Meeting of May 22, 2018 Page 2 Proposed Minutes Regular City Council Meeting May 22, 2018 Mayor Slavik called a Regular Meeting of the Plymouth City Council to order at 7:00 p.m. in the Council Chambers of City Hall, 3400 Plymouth Boulevard, on May 22, 2018. COUNCIL PRESENT: Mayor Slavik, Councilmembers Willis, Carroll, Wosje, Davis, and Prom. COUNCIL ABSENT: Councilmember Johnson. STAFF PRESENT: City Manager Callister, Administrative Services Director Hokkanen, Community Development Director Juetten, Park and Recreation Director Evans, Public Works Director Thompson, Public Safety Director Goldstein, Senior Planner Sommers, City Forester Buck, Assistant City Engineer Payne, City Attorney Knutson, and City Clerk Engdahl. Plymouth Forum Judy Luedke, 17910 County Road 47, expressed frustrations with lack of protocol followed by past development and concerns for future development in her area of the City. She encouraged the Councilmembers to watch these things closely. Mayor Slavik thanked Ms. Luedke for her comments and clarified that Ms. Luedke had been compensated by the developer for the impact left on her land. She noted the City was not party to the agreement regarding the compensation. Mayor Slavik stated staff will make sure the City is following up if there are any regulations not being properly followed. Presentations and Public Information Announcements (4.01) Proclaim June 2 as "Arbor Day" City Forester Paul Buck presented information regarding Plymouth's Arbor Day tree planting on June 2 from 9:00 a.m. to 12:00 p.m. at Lake Camelot Park. Planting of 40 trees and placing an informational plaque will be done in partnership with the Rotary Club. Mayor Slavik proclaimed June 2 as "Arbor Day." (4.02) Proclaim May 20-26 as "Public Works Week" Public Works Director Michael Thompson highlighted the work of the Public Works Department. Proposed Minutes Page 1 of 7 Regular Meeting of May 22, 2018 Page 3 Mayor Slavik proclaimed May 20-26 as "Public Works Week." Mayor Slavik noted on May 24 at 11:00 a.m. there will be a Memorial Day event at the Veterans Memorial hosted by Plymouth's Beyond the Yellow Ribbon organization. Approval of Agenda Motion was made by Councilmember Wosje, and seconded by Councilmember Carroll, to approve the a-engda. With all members voting in favor, the motion carried. Consent Agenda Motion was made by Councilmember Wosje, and seconded by Councilmember Davis, to adopt the Consent Agenda that included the followingitems: tems: (6.01) Council meeting minutes from Special and Regular Meetings of May 8, 2018. (6.02) Resolution Approving Disbursements ending May 12, 2018 (Res2018-193). (6.03) Resolution Approving Collateral Assignment of Development Agreement and Tax Increment Financing Note, Subordination Agreement and First Amendment to Promissory Note Related to 169/55, LLC Housing Project (Axis Apartments) (Res2018-194). (6.04) Resolution Approving Wetland Replacement Plan for the Troy Lane Reconstruction Project (17014 — Res2018-195). (6.05) Resolution Approving Exception from Section 2005.13 of the City Code Allowing Liquor Consumption at the Hilde Performance Center on August 30, 2018 (Res2018-196). (6.06) Resolution Approving the Purchase of a New Wheel Loader with Plow (Res2018-197). (6.07) Resolution Approving Final Plat for the "Summers Edge South 2nd Addition (2017107F — Res2018-198) and Resolution Adopting Assessments for Water and Sanitary Sewer for Summers Edge South 2nd Addition (2017107F — Res2018-199). (6.08) Resolution Approving Site Plan Amendment Mister Car Wash located at 11318 Highway 55 (2018026 — Res2018-200). With all members voting in favor, the motion carried. Proposed Minutes Page 2 of 7 Regular Meeting of May 22, 2018 Page 4 Public Hearings (7.01) Public Improvement and Special Assessment Hearing, Award Contract, and Designate Engineer for the State Highway 55 Frontage Road Construction Project and Assessment Hearing for the State Highway 55 Frontage Road Construction Project (13002) Assistant City Engineer Payne presented this project and illustrated the existing conditions of this road, noting that it is currently rated three out of ten. He listed the proposed improvements for street reconstruction and utilities and reported that this project will realign the frontage road with West Medicine Lake Drive. He noted the proposed project schedule. In response to questions from the Council, Assistant City Engineer Payne and Public Works Director Thompson provided the following information: • The water main is located in the ditch of Highway 55 and is proposed to be moved into the roadway so it is better able to be serviced. • Staff will provide a report back to Council if abandoned utilities are marked. Mayor Slavik opened the public hearing. Steve Kleineman, owner of business located at 11140 Highway 55, expressed his support for this project but is concerned that the landscaping on his property would be removed and not replaced. He believes the landscaping is in the right-of-way. He inquired if he could receive bids for the portion of the work being done to his curb work to assure it is done to the quality he would prefer, and that the City would cover the remainder and replace what is removed during the project. Mayor Slavik closed the public hearing. Public Works Thompson stated that the City doesn't typically replace landscaping in the right- of-way. He stated that planting in the right-of-way is done at the owner's risk. Assistant City Engineer Payne concurred and stated that the staff is willing to work with property owners where needed. Regarding the replacement of curb at Mr. Kleineman's expense, Public Works Director Thompson stated that the City would not assume that cost, but there could be some flexibility and a reimbursement agreement that would be reviewed by the City Attorney in order that it follows policy. Motion was made by Councilmember Davis, and seconded by Councilmember Wosje, to adopt Resolution Ordering Improvement for the State Highway 55 Frontage Road Reconstruction Project(13002 — Res2018-201), Resolution Adopting Assessments for the State Highway 55 Frontage Road Reconstruction Project (13002 — Res2018-202), and Resolution Awarding the Contract and Designate Engineer for the State Highway 55 Frontage Road Reconstruction Project (13002 — Res2018-203). With all members voting in favor, the motion carried. Proposed Minutes Page 3 of 7 Regular Meeting of May 22, 2018 Page 5 General Business (8.01) Rezoning and Preliminary Plat for Property located at 18550 County Road 47 (McConn Parcel — 2018014) Senior Planner Sommers presented the details of the proposed project to the Council. She stated the rezoning request meets the requirements of the Zoning Ordinance. Motion was made by Councilmember Willis, and seconded by Councilmember Carroll, to adopt an Ordinance Amending Chapter 21 of the City Code to Classify Certain Land located at l 8550 County Road 47 (2018014 — Ord2018-13), Resolution Approving Findings of Fact for the Rezoning of Land located at 18550 County Road 47 (2018014 — Res2018-204), Resolution Approving a Preliminary Plat for "McConn Parcel" for Property located at 18550 County Road 47 (2018014 - Res2018-205), and Resolution Approving Summary Publication of Ordinance No. 2018-13 Ordinance Amending Chapter 21 of the City Code to Classify Certain Land Located at 18550 County Road 47 (2017110 - Res2018-206). With all members voting in favor, the motion carried. (8.02) Reguiding and Sketch Plan for "Greenway North" on Property located at 18405, 18515 and 18535 County Road 47, 6035 Troy Lane, and 5945 Troy Lane (Pulte Homes of Minnesota — 2018022) Senior Planner Sommers introduced the project which is reguiding the site from LA -R2, which allows 2-4 dwelling units/acre, to LA -2, which allows 3-6 dwelling units/acre. She stated that the reguiding request is consistent with the 2040 Comprehensive Plan and essentially moves up the timing for the reguiding as the City is scheduled to adopt the 2040 Comprehensive Plan later this summer. She stated that the applicant is also requesting a sketch plan review to gather general comments from the Council regarding the plan itself. She discussed access points from the east and north and that a full intersection from County Road 47 will be required. An access to the west is being discussed with the developer. She stated that the Planning Commission recommended approval at their May 2, 2018 meeting and a letter from residents to the north detailing their concern for the project was distributed to the Council. She stated staff recommends approval of the reguiding for the proposed project. In response to questions from the Council, Senior Planner Sommers and Community Development Director Juetten provided the following information: • The single-family lot in the north of the project is proposed to remain zoned as single- family but staff will let the developer comment on that. • The action item being discussed tonight is just the reguiding. This is being discussed tonight because the developer has requested reguiding to occur earlier due to a deadline with the Metropolitan Council regarding Comprehensive Plan amendment dates. The developer is following up with rezoning and preliminary plat for this project at a later date. Proposed Minutes Page 4 of 7 Regular Meeting of May 22, 2018 Page 6 • If the Council approves the request for reguiding tonight, the Council still has discretion on future zoning decisions for this site. The Council is just providing informal feedback regarding townhomes and the remainder of the proposed development. • If the Council were to approve the reguiding tonight and the applicant comes forward with a plan for townhomes that the Council did not support, the size of the lots for single- family homes would likely be 65-75 foot wide lots. • This will not be workforce type housing due to the land costs. Paul Heuer with Pulte Homes, representing the applicant, described the details of the proposed site plan. He discussed the current topography and vegetation of the site and commented that the proposed Greenway North site would have access to the features of Greenway West. He stated that the single-family homes in the southwest area are a continuation of the lots in Greenway West. The northern section of the site is proposed for townhomes due to the high-density guiding to the west and the busy roadway to the north. He described there would be two levels of homeowners association, one for the single family and one for the townhome portion. He summarized Pulte Group's perception of the benefits and amenities of the proposed land use. In response to questions from the Council, Mr. Heuer provided the following information: • There will be two HOAs under the umbrella of another association. The townhomes have the exterior of the buildings as part of their maintenance, which is part of the increased cost. • These townhomes are the same units as those by Camelot and could also be called rowhouses. • Pulte Group's perspective is when cities put together future land -use maps, typically they place the higher density residential housing in the areas of higher traffic streets, industrial uses, and commercial uses. The roads in front of the proposed development will be minor local collective streets, not County Road 47. Community Development Director Juetten added these townhomes would be similar to the Taryn Hills project and stated that Taryn Hills is guided LA -2. Some Councilmembers voiced their concerns with townhomes occupying a portion of this development. Larry Lawrence, realtor for the property owner of 6015 Troy Lane, stated that his client has been requested to sell his property to the developer to complete the project. Mr. Lawrence's client has not been able to come to an agreement with the developer on a price for his home and developable land. His client is now proposing to leave the single-family home on his property and eliminate the proposed Lots 6 and 7. The easement to Troy Lane on his client's property would need to be dealt with to construct the road to the far east of the property. His client would then like to see a drive constructed to the west of his property line, which will likely push the road to the west. Mr. Lawrence illustrated the lot in question which is approximately five acres with some wetland. Proposed Minutes Page 5 of 7 Regular Meeting of May 22, 2018 Page 7 Motion was made by Councilmember Wosje, and seconded by Councilmember Davis, to adopt Resolution Approving apprehensive Plan Amendment to Reguide Roughly 24 Acres from LA -R2 to LA -2 for "Greenway North" (2018022). Motion failed with Prom, Willis, and Slavik voting no, and Carroll, Wosje, and Davis voting yes. Motion was made by Councilmember Willis, and seconded by Councilmember Prom to direct City Attorney prepare findings of fact for denial. Motion carried. Troy Reding, 18535 County Road 47, stated changes and rezoning have occurred in this area, but now this rezoning has failed. He expressed frustration with Council's concern regarding townhomes. He stated the action item tonight was to rezone the site from LA-RA2 to LA -2 which will be done in September as part of the Comprehensive Plan. In response to Mr. Reding, a couple comments were made: • Concern of placing a higher density use closer to County Road 47 which is a very busy roadway. • Reguiding the property to LA -2 would give the developer too much leeway in what would be brought back before the Council. Community Development Director Juetten stated if seeing a more concrete plan would assist the Council prior to reguiding approval, he suggested the option of continuing this tonight and requiring the developer to come back with a plat which they are currently working on. This timeline would work for the developer to meet the deadline with the Metropolitan Council. Motion was made by Mayor Slavik, and seconded by Councilmember Carroll, to reconsider. With Carroll, Wosje, Davis, and Slavik voting yes, and Willis and Prom voting no, the motion carried. Motion was made by Mayor Slavik, and seconded by Councilmember Carroll, to table this item to the June 26, 2018 meeting. With all members voting in favor, the motion carried. Reports and Staff Recommendations City Manager Callister provided a brief legislative update. Adjournment Mayor Slavik adjourned the meeting at 8:28 p.m. Proposed Minutes Page 6 of 7 Regular Meeting of May 22, 2018 Page 8 The Council then conducted a quarterly City Manager's update that Mayor Slavik called to order at 8:35 p.m. in the Parkers Lake Conference Room. Mayor Slavik, Councilmembers Prom, Willis, Carroll, Wosje, and Davis, City Manager Callister, and Administrative Services Director Hokkanen were in attendance. This meeting adjourned at approximately 9:30 p.m. Sandra R. Engdahl, City Clerk Proposed Minutes Page 7 of 7 Regular Meeting of May 22, 2018 Page 9 rp)City of Agenda Plymouth Number: Adding Quality to Life To: Dave Callister, City Manager REGULAR COUNCIL MEETING Prepared by: Gina Nesenson, Finance Clerk June 12, 2018 Reviewed by: Jodi Bursheim, Finance Manager Item: Approve Disbursements Ending June 2, 2018 1. ACTION REQUESTED: Adopt attached resolution to approve the disbursements for the period ending June 2, 2018. 2. BACKGROUND: Attached is a list of City fund disbursements for the period ending June 2, 2018. 3. BUDGET IMPACT: N/A 4. ATTACHMENTS: Check Registers Resolution 6.02 Page 1 Invoice Expense Distribution for Period Ended 06/02/18 Council meeting 06/12/18 FUND 100 General Fund 151,157.39 200 Recreation Fund 14,396.99 210 Parker's Lake Cemetery Maint 0.00 220 Transit System Fund 345,628.06 234 Economic Development Fund 0.00 240 Lawful Gambling 0.00 250 Comm Dev Block Grant Fund 2,523.47 254 HRA Section 8 Fund 0.00 254 HAP Check Summary 225,451.71 258 HRA General Fund 765.21 300 1998C GO Activity Center 0.00 304 1998B Shenandoah Debt Sery 0.00 305 2004A GO Public Safety 0.00 307 1998A -TIF #7-5A Rottland 0.00 308 2005A TIF #1-1 0.00 309 2007A Open Space Series 0.00 310 2009A TIF #7-5A Refund 1998A 0.00 311 2009B AC and FH Refunding 0.00 312 2010A GO Open Space 0.00 314 2012A GO Refunding 2004A 0.00 315 2015A GO Open Space 0.00 400 General Capital Projects Fund 27,147.58 401 Minnesota State Aid Fund 0.00 404 Community Improvement 0.00 405 Park Replacement Fund 0.00 406 Street Reconstruction Fund 0.00 407 Project Administration Fund 4,486.40 408 Park Construction 3,604.50 409 Capital Improvement Fund 0.00 412 Water Sewer Replace 0.00 413 Improvement Project Construction 73,634.13 414 Shenandoah Administration 0.00 415 Shenandoah Surplus 0.00 417 Project Warranty Repairs 0.00 418 Utility Trunk System Expansion 0.00 420 Water Sewer Construction 0.00 421 ENT -Water Resources Constrctn 69,426.64 422 TIF 7-4 PTP Construction 62.50 423 TIF 7-5 Rottlund (Const) 62.50 424 TIF 7-6 Berkshire 62.50 425 TIF Housing Assistance Program 62.50 426 TIF 7-7 Stonecreek 62.50 427 TIF 1-1 Shops at Plymth Crk 62.50 428 TIF 1-2 Vicksburg Commons 62.50 429 TIF HRA 1-3 Crossroads Station 62.50 430 CON -Open Spaces Series 2007A 0.00 431 CON -2010A Open Space 0.00 432 TIF #7-8 Quest 62.50 500 Water Fund 99,308.00 510 Water Resources Fund 5,352.16 520 Sewer Fund 606,163.96 530 Solid Waste Management Fund 14,569.20 540 Ice Center Fund 35,044.61 550 Field House Fund 5,392.27 600 Central Equipment Fund 251,914.20 610 Public Facilities Fund 21,627.91 620 Information Technology Fund 35,118.01 630 Risk Management Fund 3,859.73 640 Employee Benefits Fund 224,522.45 650 Design Engineering 0.00 660 Resource Planning 6,536.86 800 Investment Trust Fund 0.00 850 Plymouth Town Square 0.00 851 Vicksburg Crossing 0.00 Total Invoice Expense Distribution: 2,231,252.64 Page 2 City of Check Payment Register 05/23/2018 to 06/02/2018 Plymouth Check EFT Date Paid: 05/01/2018 US Bank Visa Amount: $26,805.12 Inv. 180416 04/16/2018 3.15/4.15.18 US Bank Visa Charges Item Description Total Price 24 basketballs, 7 mini fist clamp, 200 case/10 roll bags ea $621.97 19 various color vinyl flagging, 2 tape, 1 refill $177.72 MNAWWA Operator School and rubber hip boots $491.50 1 hose set, 1 filter, 1 coupler, 1 vacuum pump, 1 software update $639.81 Tax transfer - vehicle #5054 & #388 $20.49 5.17/5.18.18 MN PFS $249.00 100 cable tie tags, 2-pk 15' HDMI cord, 10 -panel desktop ref sys $56.93 Cookies, popcorn salt, soda -Coffee Get -Together & Senior Movies $71.29 eFax Services $169.50 Professional Standards Software Update $100.00 Training Division Software Update $100.00 NSEMPG Training Refreshments multiple city, fruit/bakery $36.58 Section 404 Permits OnDemand Webinar $175.20 Best Buy -Investigations -Notebook $301.06 Amazon Marketplace -Investigations -tail cams/batts/ memory cards $255.56 Best Buy -refund for tax exemption ($21.07) Holiday station -gas for 1720 to BIR $25.56 DVS -Tabs for SIU vehicles $156.81 2 Rolling Tool Boxes $141.77 Dry Cleaning of Green Tablecloths $124.55 MN Municipal Clerks Institute -A Gottschalk $245.00 Jimmy John's, Water, Legislative Breakfast + Davanni's $494.30 Returned Rolling Tool Box ($82.14) Mail Sorter for Admin Services Dept. Managers $458.79 2018 FRI Conference registration- Coppa $660.00 Costco - chewy/nutri bars, coffee, cups - Food for City Sampler $192.68 Atria Cafe Catering - Food for State of the City $215.48 Costco 3 Panel Canvas Art Work for Admin Office Area Remodel $354.81 Costco 3 Panel Canvas Art Work for Admin Office Area Remodel $215.04 Costco 3 Panel Canvas Art Work for Admin Office Area Remodel $430.08 Costco 16x48 Canvas Art Work for Admin Office Area Remodel $129.01 Michael's 1-12 3/8x19" Custom Framing Art Work for Admin Remodel $69.00 USA Inflatables- Bark in the Park Inflatable $114.95 The Star Tribune- Kids Garage Sale Ad $42.00 6-3/8" Alloy Clevis Slip, 6-3/8" clevis hook $179.48 Past Champions Plaque $68.75 3 Market Pantry, 4 Dasani Water - Concessions Items $18.63 8"x6" changeable wall plate w/logo $55.08 5.2.18 MIAMA Spring Conference Reg. $75.00 BP 4.987 gal fuel -Snow blower $12.46 BP 9.771 fuel -Snow blower $24.61 Papa John's dinner/plow staff, 1 hydraulic ball valve $265.72 Weissman Designs - 3.16.18 $76.44 Forever 21 Inc. - Dance Costume Supplies, 5 leggings, 4 tops $171.09 Altar'd State - Dance Costume Supplies, 1 top, 1 jumpsuit $127.78 Spoonflower - Dance Costume Supplies, 2 yd basic cotton $38.00 Amazon - Dance Costume Supplies, 2-9pk boys crew socks $31.98 Revolution Dance- Dance Costume Supplies, 64 tights $234.80 Amazon -Dance Costume Supplies, 14 headwear, 1-12pk bandana $67.85 Carter's Inc.- Dance Costume Supplies, 14 tier separates $111.58 Discount dance- Dance Costume Supplies, 13 mesh skirts, 1 tights $311.87 Amazon- Dance Costume Supplies, 14 yellow caps $53.76 Full Source LLC- Dance Costume Supplies, 14 yellow polo shirts $128.27 Page 1 of 30 Pag#/A018 Old Navy- Dance Costume Supplies $89.91 Weissman Designs- Dance Supplies, lea shorts, skirt, leotard $75.73 Bruegger's Bagels - Coffee & Bagels for CS Testing/Interviews $31.68 Aug'18 Safety University DOT EMS Instructor class -Olson $325.00 Playground surfacing/fast patch -1 mocha brown -black, 1 green -black $279.90 Ballfield tools -1 puddle sponge, 3 tamp heads, lea rake/hoe $615.64 3.1/3.4.18 Facebook Advertising -softball $50.00 Discount Dance Supply -1 pants, 1 leggings, 14 mesh skirts $316.05 Central Restaurant Supply -3 Bleach Test Strips for Events $41.29 Paypal-Winderidea-yearly subscription for online brochure service $299.00 SG DTF Visa - CUB Foods Paper products $32.17 SG DTF Visa - Amazon - External hard drive & scanner $496.04 SG DTF Visa - Fleet Farm - trash bags $8.48 Latuff's Pizza -Lunch for Training Day $264.50 Freedom -1-20#, 1-10# Ice for Training Day $6.68 Freedom 2-20# Northstar, 1-24pk Aquafina for Training Day $14.37 NAPA -Hitch for training trailer $28.93 Latuff's-Lunch for 2nd training day $229.02 4.8/4.10.18 ACT -Special Ops SOTA Registration $195.00 NASRO-Registration for Training-Groth & Peterson $450.00 Lunds Byerly's-Retirement Cake -Paul Johnson $45.99 Union Station -Lodging while at training-Coopet & Kvenild $1,646.20 PayPal 4.12.18 Admin Interviews Law Webinar- $99.00 Homefront-8.27.18 Registration for Training -Patrol Supervision $95.00 BCA Training Registration for CanAm-Grande $175.00 TLO TransUnion-Investigative Tool Monthly Fee $25.00 22 MN POST Board Licenses $1,980.00 MN Vehicle Registration -Jeep $73.42 Best Western -Lodging while at Training -Palm & Duncan $209.48 MN CIT -Registration for Training-Passig-Whiteford $200.00 Panera-Food for In Service Training, 2.5 dz bagels, cream cheese $71.99 Cub Foods -Supplies for In Service Training $26.16 Calibre Press-BulletProof Registration for Training -Sutherland $229.00 SG DTF Visa - Grandview Lodge - Training JN, SG, KDMT&NC $1,410.74 SG DTF Visa - USPS - Package Tracking $10.33 SG DTF Visa - Kuipers - Mount Squares & Doorknob $9.12 Shipping on broken radar unit $20.56 Light stick tarp cable ties - command post $91.11 128pc socket wrench tool set - command post $49.99 Lights for - command post $27.48 ID wristbands - command post $31.92 35' HDMI cable for new TV REED's office $24.99 Flat TV/Theater cord, Whizz touchup/Trim K - HDMI Reed's office $23.35 5 LWD tactical armorers tool $374.75 4x6 whiteboard - command post $159.98 36x24 magnetic dry erase board - command post $54.99 1 Keurig K55 coffee maker - command post $84.12 3.11.18 T -Mobile covert cell phone $124.56 1 cs medical gloves, 4 Adult/Child Defibrillator, 1 medical bag $414.76 1 cs XL/l cs L medical gloves $143.80 Flashlight parts patrol $9.48 1 TS Wi-Fi HD 720p Video Inspect Camera w/LED flashlight - patrol $65.95 Vet -Stryker $294.09 Supplies/batteries $27.90 Pool Web- Little swimmer training platform $805.42 Safe Sitter Babysitting supplies participants and instruction $916.25 2 cable, 4 adapter, 1 mouse, 1 screen protector, $169.94 1 VIZ D48 -DO TV - Ice Center $349.99 Misc Cables, wall plates, adapters, 1 Apple TV $238.89 3.22/4.22.18 Push Woosh Monthly Maintenance $49.95 Best Buy 2 - HD 60HZ LED TV - Communications $129.01 TV Maintenance contract 5 year - 3/24/18 - 3/23/23 $49.98 2 Edraw Licenses HR $384.04 Ops Genie maintenance renewal $60.00 GeoTrust SSL VPN.plymouthmn.gov 4/11/18 - 4/10/20 $348.00 Page 2 of 30 Pag#/A018 L Hokkanen Visa Amazon Lit organizer return/credit ($85.80) L Hokkanen Visa Amazon Membership fee to be cancelled $12.99 5.9/5.11.18 APWA Spring Conf Regist - Payne, Thompson, Paumen $705.00 3.20.18 parking for County Board meeting $7.00 6 Yonex Mavis 350 Shuttles for Badminton $74.00 MN Pollution Control Permit, Proj No STR13002 $400.00 Canvas maintenance parks $410.00 4 - Clip-on Rear View Mirror for PC Monitors $49.48 GTS Educational - Planning Comm - Kira Vanderlan $65.00 Check EFT Date Paid: 05/23/2018 Selectaccount Amount: $1,066.75 Inv. 1230560 05/08/2018 May'18 VEBA & FSA admin fees Item Description Total Price May'18 VEBA & FSA admin fees $1,066.75 Check EFT Date Paid: 05/25/2018 MN AFSCME Council #5 Amount: $3,358.23 Inv. 2018-00000134 05/25/2018 DUES MTCE - Maintenance Union Dues* Item Description Total Price 05/25/2018 Deduction Maintenance Union Dues $1,713.40 05/25/2018 Deduction Maintenance Union Fair Share $340.34 05/25/2018 Deduction CTP Union Dues $862.56 05/25/2018 Deduction CTP Union Fair Share $393.33 05/25/2018 Deduction CTP Part-Time Union Fair Share $42.15 05/25/2018 Deduction AFSCME DUES W/ PEOPLE DED $6.45 Check EFT Date Paid: 05/25/2018 MN Child Support Payment Ctr Amount: $1,315.16 Inv. 2018-00000135 05/25/2018 CHID SUP% - Child Support Percentage* Item Description Total Price 05/25/2018 Deduction Child Support Percentage $245.03 05/25/2018 Deduction Child Support $118.13 05/25/2018 Deduction Child Support $161.05 05/25/2018 Deduction Child Support $790.95 Check 116559 Date Paid: 05/24/2018 Allison Johnson Amount: $300.00 Inv. Import - 3947 05/21/2018 Park and Rec Refund Item Description Total Price $300.00 Check 116560 Date Paid: 05/24/2018 Hareesh Kalikiri Amount: $734.00 Inv. Import - 3940 05/21/2018 Park and Rec Refund Item Description Total Price $734.00 Check 116561 Date Paid: 05/24/2018 Ace Lock & Safe Co Inc. Amount: $2,888.00 Inv. 098685 05/07/2018 1 locker room lever & replacement labor - IC Item Description Total Price New lockset for team room door $630.00 Inv. 098694 04/26/2018 4 men's room door closer arms & replacement labor - IC Item Description Total Price Door closer parts $445.00 Inv. 098713 05/04/2018 Repair/install 2 exit devices - Parkers Lake Doors Item Description Total Price Parkers Lake Doors $1,813.00 Check 116562 Date Paid: 05/24/2018 Action Fleet Inc. Amount: $4,853.60 Inv. 11460 05/15/2018 Upgrade Printers/Cradle points in Squads Item Description Total Price Upgrade Printers/Cradle points in Squads $4,853.60 Check 116563 Date Paid: 05/24/2018 Adam's Pest Control, Inc. Amount: $84.27 Inv. 2663850 05/07/2018 Apr-Jun'18 Qtrly FS1 Pest Control Item Description Total Price Page 3 of 30 Pagp/Ao18 Apr-Jun'18 Qtrly FS1 Pest Control $84.27 Check 116564 Date Paid: 05/24/2018 AIM Electronics Inc. Amount: $1,161.90 Inv. 10950 04/30/2018 Scoreboard clock for Zamboni Room Item Description Total Price Scoreboard clock for Zamboni Room $945.00 Inv. 40990 04/30/2018 PCC Sign - No Signal Repair call/service Item Description Total Price PCC Sign - No Signal Repair call/service $216.90 Check 116565 Date Paid: 05/24/2018 All Seasons Canine Country Club Amount: $25.00 Inv. 174604 05/06/2018 1 day boarding-Knight Item Description Total Price Kennel-Knight $25.00 Check 116566 Date Paid: 05/24/2018 Apex Print Technologies LLC Amount: $7,150.37 Inv. 239762 04/30/2018 April 2018 UB statement processing, printing & mailing Item Description Total Price April 2018 UB statement processing, printing & mailing $7,150.37 Check 116567 Date Paid: 05/24/2018 Aspen Mills Amount: $55.35 Inv. 216545 05/16/2018 1 Navy Polo w/logo - T. Peterson Item Description Total Price Uniform Draw Account $55.35 Check 116568 Date Paid: 05/24/2018 Badger Meter Inc. Amount: $2,464.47 Inv. 1231120 05/02/2018 1- 3in compound meter Item Description Total Price 1- 3in compound meter Inv # 1231120 $2,464.47 Check 116569 Date Paid: 05/24/2018 Batteries Plus Amount: $63.92 Inv. 021P1178047 05/01/2018 8ea lithium batteries Item Description Total Price Batteries for the door counters $63.92 Check 116570 Date Paid: 05/24/2018 Bolton & Menk Consulting Engineers Amount: $23,526.50 Inv. 0216865 04/30/2018 Proj No C15.115271 Troy Lane Engineering Services Item Description Total Price Troy Lane Engineering Services $23,526.50 Check 116571 Date Paid: 05/24/2018 Boyer Trucks Amount: $469.98 Inv. 194494R 05/01/2018 1 duct kit Item Description Total Price 1 duct kit $46.97 Inv. 194746R 05/04/2018 1 Valve Expansion, vehicle #2009 Item Description Total Price 1 Valve Expansion, vehicle #2009 $84.87 Inv. 477780 04/30/2018 Cleared inactive codes/final report to finish, vehicle #292 Item Description Total Price Cleared inactive codes/final report to finish, vehicle #292 $385.11 Inv. CM194494R 05/01/2018 1 duct kit return/credit Item Description Total Price 1 duct kit return/credit ($46.97) Check 116572 Date Paid: 05/24/2018 CDW Government Inc. Amount: $5,650.21 Inv. MNT0337 04/30/2018 1 Startech network card Item Description Total Price 1 Startech network card $206.27 Inv. MNW8147 04/30/2018 Wireless headset - C Mehrkens Item Description Total Price Wireless headset - C Mehrkens $170.56 Inv. MPF3275 05/01/2018 Ear hook kit Page 4 of 30 Pag#/4(h018 Item Description Total Price Ear hook kit $13.46 Inv. MPF6117 05/01/2018 1 LG Monitor Item Description Total Price LG Monitors $173.26 Inv. MPK0182 05/02/2018 17ea LG Monitors Item Description Total Price LG Monitors $2,945.42 Inv. MPT9827 05/03/2018 4ea Griffin Survivor Cover Item Description Total Price Griffin Survivor Cover $282.68 Inv. MPX7598 05/04/2018 4-32GB Apple iPad Cell - Kevin Mastey -Water Item Description Total Price Apple 9.7" Cellular 32 GB w/Verizon $1,858.56 Check 116573 Date Paid: 05/24/2018 Ceco Ltd Amount: $2,100.00 Inv. 00013554 05/04/2018 Crane for Dome-Take Down Item Description Total Price Crane for Dome-Take Down $2,100.00 Check 116574 Date Paid: 05/24/2018 CenterPoint Energy Amount: $19,195.30 Inv. 800001473730418 05/10/2018 3.22/4.30.18 All Bldgs heat bill Item Description Total Price 3.22/4.23.18 Pike LS heat bill $50.37 3.21/4.20.18 Sunset LS heat bill $22.98 3.22/4.23.18 City Center heat bill $89.88 3.21/4.20.18 PW heat bill $3,330.01 3.21/4.20.18 LaCompte Pk heat bill $118.41 3.22/4.23.18 HS heat bill $191.50 3.22/4.23.18 FS2 heat bill $511.64 3.21/4.20.18 Well #4 heat bill $143.47 3.21/4.20.18 Ridgemount Pk heat bill $68.59 3.21/4.20.18 WTP #1 No heat bill $642.82 3.22/4.23.18 FS1 heat bill $512.77 3.31/4.30.18 IC heat bill $4,358.70 3.21/4.20.18 WTP #2 heat bill $96.16 3.21/4.20.18 Pavillion heat bill $198.16 3.22/4.23.18 Bass Lk Plyfld heat bill $175.14 3.22/4.23.18 Metrolink/Reserve heat bill $67.77 3.31/4.30.18 FH/PCC heat bill (3 days dome down) $4,397.52 3.23/4.24.18 FS3 heat bill $1,065.80 3.22/4.23.18 PS heat bill $2,844.37 3.21/4.20.18 WTP #1 So heat bill $265.62 3.22/4.23.18 Imperial Hills LS heat bill $21.36 3.21/4.20.18 Waterfront LS heat bill $22.26 Check 116575 Date Paid: 05/24/2018 Cintas Corporation Amount: $419.04 Inv. 4005838633 05/11/2018 5.11.18 PW/PM Uniform rental/laundry/rugs Item Description Total Price 5.11.18 PW/PM Uniform rental/laundry/rugs $249.44 Inv. 4006027585 05/18/2018 5.18.18 Station 73 rug services Item Description Total Price 5.18.18 Station 73 rug services $46.09 Inv. 4006060712 05/21/2018 5.21.18 CH mat service Item Description Total Price Rug laundering - CH $123.51 Check 116576 Date Paid: 05/24/2018 Cintas Corporation Amount: $106.90 Inv. 4005698826 05/07/2018 5/7/18 IC Janitorial Supplies Item Description Total Price 2018 PO for Concession/Janitorial Supplies $53.45 Inv. 4006068658 05/21/2018 5.21.18 IC Janitorial Supplies Item Description Total Price Page 5 of 30 Pag#/4977 2018 2018 PO for Concession/Janitorial Supplies $53.45 Check 116577 Date Paid: 05/24/2018 City of Burnsville Amount: $2,275.00 Inv. 180329 03/29/2018 5.5.18 Live fire training facility use/ABLE instructor fee Item Description Total Price Fire Training $2,275.00 Check 116578 Date Paid: 05/24/2018 Commercial Asphalt Co. Amount: $3,775.53 Inv. 180515 05/15/2018 5.1/5.15.18 73.41 TN 9.5MM Rec Wear/Dura Drive Item Description Hot mix Asphalt Check 116579 Date Paid: 05/24/2018 Core & Main LP Amount Inv. 1844267 05/09/2018 6" Romac alpha restraint Item Description Water main repair parts Inv# 1844267, 1875005 Inv. 1875005 05/17/2018 2-6" restraint, 6 PVC Restraint, 6 regular gasket, 3 Epoxy imp Item Description Water main repair parts Inv# 1844267, 1875005 Check 116580 Date Paid: 05/24/2018 Dalco Amount Inv. 3319936 05/22/2018 PW - 6 case toilet tissue, 6 case roll towel Item Description Janitorial supplies - PW Check 116581 Date Paid: 05/24/2018 Dexon Computer Inc. Amount Inv. 93846 04/30/2018 2 Cicso IP Phone 8800 Expansion Module - Teri W Item Description Side Card for IP Phone Shipping Check 116582 Date Paid: 05/24/2018 Inv. 18040 05/03/2018 Item Description Home Plates Check 116583 Date Paid: 05/24/2018 Inv. 2414 05/05/2018 Item Description Open PO -Concession Resale Check 116584 Date Paid: 05/24/2018 Inv.INV163964 05/17/2018 Item Description 2 waste toner Inv.INV163965 05/17/2018 Item Description 1 Lexmark Toner for E120 Check 116585 Date Paid: 05/24/2018 Inv. 10823522 05/02/2018 Item Description Flowers - Dance Recital Supplies Check 116586 Date Paid: 05/24/2018 Inv. 595851 05/03/2018 Item Description 5.16.18 PH File No 2017100 Check 116587 Date Paid: 05/24/2018 Page 6 of 30 DH Athletics LLC 6 wood core home plates Drew's Concessions LLC IC Concession popcorn supply DTS/Definitive Technology 2 waster toner 1 Lexmark Toner for E120 Amount Total Price $3,743.81 $31.72 $2,048.78 Total Price $864.54 Total Price $1,184.24 $563.48 Total Price $563.48 $468.00 Total Price $450.00 $18.00 $515.43 Total Price $515.43 Amount: $1,137.58 Total Price $1,137.58 Amount: $166.86 Total Price $100.00 Total Price $66.86 Dundee Nursery & Landscaping Co. Amount: $248.75 125 fresh cut flowers/notes - 5.4.18 Dance Event Total Price $248.75 ECM Publishers Inc. Amount: $119.00 5.16.18 PH File No 2017100 Total Price $119.00 Ehlers & Associates Inc. Amount: $562.50 Page/4$2018 Inv. 76891 05/10/2018 4.16/4.19.18 TIF Financial Management Plan Item Description Inv #76891 - TIF Financial Management Plan Check 116588 Date Paid: 05/24/2018 Emergency Response Solutions Inv. 11016 05/07/2018 20-0.239" polylactone urethane o -ring Item Description MSA repair parts Check 116589 Date Paid: 05/24/2018 eQuality Pathways to Potential Inv. 1804PCC 04/30/2018 Apr'18 PCC Janitorial Item Description eQuality Invoice - PCC April Check 116590 Date Paid: 05/24/2018 ESS Brothers & Sons Inc. Inv. YY1736 05/03/2018 2-27' Sediment Control Barrier Item Description Sediment Control Barrier Check 116591 Date Paid: 05/24/2018 Ferguson Waterworks Inv. 5660776 05/01/2018 Replacement floor drain covers - PD garage Item Description Replacement floor drain covers - PD garage Check 116592 Date Paid: 05/24/2018 Filtration Systems Inc. Inv. 84963 05/01/2018 Various size filters (39) Item Description Filters for plant Hvac system Inv. 85132 05/09/2018 60 various size canister water filters - CH Item Description Canister water filters - CH Check 116593 Date Paid: 05/24/2018 First Transit Inc. Inv. 558540418PLM 05/05/2018 Apr'18 DAR Transit Services Item Description Inv #558540418PLM -April Transit Services Inv #558540418PLM-Apr Transit Sery Fuel & Other 2018 Fuel Credit Inv #558540418PLM-April Transit Services -2016/2017 Fuel Credits Inv #558540418PLM -April Transit Services - Fares Inv #558540418PLM -April Transit Services - Metrolink Inv #558540418PLM -April Transit Services - Card Sales Check 116594 Date Paid: 05/24/2018 Fun Engineerz LLC Inv. 1425 05/14/2018 4.12/5.12.18 JR STEM Club/Robotics (31.5) Item Description JR STEM Club April 21 - May 12, 2018 Check 116595 Date Paid: 05/24/2018 Funtime Funktions Inv. 1595 05/03/2018 5.19.18 Caricature Artist- Bark in the Park Item Description Caricature Artist- Bark in the Park- May 19, 2018 Check 116596 Date Paid: 05/24/2018 Gertens / Spike's Feed Inv. 142312 05/18/2018 80=50# Red Infield Conditioner Item Description Red Infield Conditioner Check 116597 Date Paid: 05/24/2018 Gregory Gibson Inv. 10825684 05/06/2018 5 damaged shrubs replaced -access road Item Description Shrub Replacement for 5 damaged shrubs along access road Check 116598 Date Paid: 05/24/2018 Gopher State One -Call, Inc. Inv. 8040664 04/30/2018 Apr'18 964 Locate tickets Item Description Page 7 of 30 Total Price $562.50 Amount: $47.88 Total Price $47.88 Amount: $390.00 Total Price $390.00 Amount: $440.00 Total Price $440.00 Amount: Total Price $828.38 Amount: Total Price $333.32 $828.38 $830.51 Total Price $497.19 Amount: $344,185.42 Total Price $314,477.72 $48,134.54 ($9,244.46) ($1,566.57) ($5,395.81) ($2,220.00) Amount: $3,150.00 Total Price $3,150.00 Amount: $300.00 Y-V.VV Amount: $842.00 Total Price $842.00 Amount: $241.89 Total Price $241.89 Amount: $637.35 Total Price Pag#/4q 018 Locates for ticket service. Inv # 8040664 Check 116599 Date Paid: 05/24/2018 Inv. 9772582020 04/30/2018 Item Description 6ea 16oz grease Inv. 9774193883 05/01/2018 Item Description 2ea Men's knee boots Inv. 9775146971 05/02/2018 Item Description 1 flashflood eyewash station Inv. 9776547201 05/03/2018 Item Description 1 sanitary napkin bag Inv. 9777012403 05/03/2018 Item Description 2ea impact socket Inv. 9777598450 05/04/2018 Item Description 2-5' paint pole - replacement for E21 Inv. 9777598468 05/04/2018 Item Description 2-60" black wood broom handle - FS3 Check 116600 Date Paid: 05/24/2018 Inv. 45272 05/15/2018 Item Description Boat Repairs Check 116601 Date Paid: 05/24/2018 Inv. 18014939 04/24/2018 Item Description Massage License Certificate Refund Check 116602 Date Paid: 05/24/2018 Inv. 81130448 05/07/2018 Item Description 2018 Health Insurance Premiums Check 116603 Date Paid: 05/24/2018 Inv. 1000110306 05/03/2018 Item Description Radio Support Fees Radio Support Fees Check 116604 Date Paid: 05/24/2018 Inv. 1000110216 05/01/2018 Item Description Estimated Monthly Support 2018 Check 116605 Date Paid: 05/24/2018 Inv. 1000110351 05/03/2018 Item Description 800 MHz Radios Public Works Check 116606 Date Paid: 05/24/2018 Inv. 1000110571 05/11/2018 Item Description HC Room & Board -April #110571 Check 116607 Date Paid: 05/24/2018 Inv. 187489 05/14/2018 Grainger 6ea 16oz grease 2ea Men's knee boots 1 flashflood eyewash station 1 sanitary napkin bag 2ea impact socket 2-5' paint pole - replacement for E21 2-60" black wood broom handle - FS3 $637.35 Amount: $409.74 Great American Marine Inc. Amount: 2-4sgt oil, 1 oil filter assembly, 1 pump/amp lube Hand & Stone Massage & Facial Spa Massage License Certificate Refund HealthPartners Insurance Co Inc. 2018 Health Insurance Premiums - June Hennepin County Treasurer Apr'18 Fire Radio admin fees Hennepin County Treasurer May'18 Technical Support Hennepin County Treasurer Apr'18 PW Radio admin fees Hennepin County Treasurer Apr'18 HC Room & Board Charges Amount: Amount Total Price $56.88 Total Price $38.02 Total Price $158.20 Total Price $25.48 Total Price $49.50 Total Price $64.28 Total Price $17.38 $47.48 Total Price $47.48 $75.00 Total Price $75.00 $222,700.46 Total Price $222,700.46 Amount: $1,932.11 Total Price $161.23 $1,770.88 Amount: $51.00 Total Price $51.00 Amount: $972.48 Total Price $972.48 Amount: $1,650.50 HGA/ Hammel, Green &Abrahamson Inc. Amount: Prof Sery thru 4.27.18, Proj No PC18001, PCC Community Engagement Total Price $1,650.50 $4,486.40 Page 8 of 30 PageJA018 Item Description PCC Community Engagement Check 116608 Date Paid: 05/24/2018 Inv. 900 03/27/2018 Item Description March water testing #900 Check 116609 Date Paid: 05/24/2018 Inv. 48841 04/30/2018 Item Description East Med Renovation Check 116610 Date Paid: 05/24/2018 Inv. 9640 05/06/2018 Item Description Firefighter Badges Check 116611 Date Paid: 05/24/2018 Inv. 150630 05/03/2018 Instrumental Research Inc. Mar'18 Water test samples ISG / I & S Group Inc. 4.30.18 Prof Sery Proj No 170001.171, East Medicine Lk Pk design J Gardner & Associates LLC 5,000 Jr Firefighter stick -on badges Total Price $4,486.40 Amount $720.00 Total Price $720.00 Amount: $6,291.12 Total Price $6,291.12 Amount: $428.00 Total Price $428.00 Kriss Premium Products Inc. Amount Apr'18 IC Chemical Treatment for Evap/Condensers $480.00 Item Description Total Price Chemical Treatment for Evap/Condensers $480.00 Check 116612 Date Paid: 05/24/2018 Lano Equipment Inc. Amount: $14,500.48 Inv. 03558045 05/03/2018 1 Zuldberg Front PTO Kit, 1=48" Bobcat pallet forks Item Description Total Price Kabota Tractor & Attachments $14,500.48 Check 116613 Date Paid: 05/24/2018 Michael Letich Amount: $192.44 Inv. 7849033 05/14/2018 1-8 zone Wi-Fi Rachio smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $192.44 Check 116614 Date Paid: 05/24/2018 MacQueen Equipment/Emergency Amount: $196,976.05 Inv. E00444 04/30/2018 New 2018 Elgin Pelican Street Sweeper Item Description Total Price New 2018 Elgin Pelican Street Sweeper $197,184.50 Inv. P11410 03/16/2018 Refund 1 motor/brkt/hdwr Item Description Total Price Refund 1 motor/brkt/hdwr ($208.45) Check 116615 Date Paid: 05/24/2018 Mansfield Oil Company Amount: $9,120.05 Inv. 20742673 05/21/2018 4000gl dyed B20 ULS#2 clean365 fuel Item Description Total Price 2018 Fuel Contracted Purchases $9,120.05 Check 116616 Date Paid: 05/24/2018 McGruff Safe Kids Amount: $287.04 Inv. 167418 03/26/2018 400 9-1-1 Emergency Readiness for Kids Brochures Item Description 9-1-1 Brochures Check 116617 Date Paid: 05/24/2018 Inv. 16032 05/15/2018 Item Description Hilde Electrical Inv. 30044 05/15/2018 Item Description East Med Lights Check 116618 Date Paid: 05/24/2018 Inv.IN1224920 05/05/2018 Page 9 of 30 Medina Electric LLC Replace 3 GFCI electrical outlets - Hilde Park Proj PR160002.171 East Med Lights MES Inc. 20 PCS ID Shield Helmet Fronts Total Price $287.04 Amount: $8,589.09 Total Price $438.09 Total Price $8,151.00 Amount: $865.00 Pdge61412018 Item Description Total Price Helmet Fronts $865.00 Check 116619 Date Paid: 05/24/2018 Metro Products Inc. Amount: $165.38 Inv. 134487 05/03/2018 .60 c HHCS Gr8, 4 flap disc, .04 c lynch pin, 3 grease gun coupler Item Description Total Price Various Fasteners $165.38 Check 116620 Date Paid: 05/24/2018 Metro Water Conditioning Inc. Amount: $748.60 Inv. 18506 04/23/2018 CH - Service unit/open bypass Item Description Total Price CH - Service unit/open bypass $135.00 Inv. 96792 05/03/2018 PIC - 50# Softener salt Item Description Total Price Softener salt $613.60 Check 116621 Date Paid: 05/24/2018 Metropolitan Council Amount: $96,437.88 Inv. 180430 04/30/2018 Apr'18 Sewer Availability Charge/SAC Item Description Total Price $96,437.88 Check 116622 Date Paid: 05/24/2018 Metropolitan Council Amount: $496,831.32 Inv. 0001082984 05/02/2018 May'18 Water Service Item Description Total Price Waste Water Services Def Rev Invoice# 1082984 $496,831.32 Check 116623 Date Paid: 05/24/2018 Minnesota Equipment/MN Equipment Amount: $21.83 Inv. P58582 04/17/2018 1 Universal driveshaft Item Description Total Price 1 Universal driveshaft $460.23 Inv. P58736 04/19/2018 Return 1 Universal driveshaft/credit Inv #P58736 Item Description Total Price Return 1 Universal driveshaft/credit Inv #P58736 ($460.23) Inv. P67694 05/17/2018 2 ball bearing, 2 oil seal, 1 gasket Item Description Total Price 2 ball bearing, 2 oil seal, 1 gasket $21.83 Check 116624 Date Paid: 05/24/2018 Minnesota Wisconsin Playground Amount: $946.00 Inv. 2018071 05/03/2018 6 belt seat, 6 tot seat swings Item Description Total Price Swings $946.00 Check 116625 Date Paid: 05/24/2018 Minuteman Press Amount: $179.00 Inv. 25176 05/14/2018 1,000 Business Cards-Matt Anderson Item Description Total Price Business Cards $41.00 Inv. 25183 05/14/2018 1500-2 part Leave authorization forms Item Description Total Price 1500-2 part Leave authorization forms $138.00 Check 116626 Date Paid: 05/24/2018 MN Dept of Health Amount: $23.00 Inv. 180522 05/22/2018 Class D license renewal -E Christiansen Item Description Total Price License renewal Class D $23.00 Check 116627 Date Paid: 05/24/2018 MN Dept of Health Amount: $40.00 Inv. 756969 05/04/2018 2018 Statewide Hospitality Fee - PCC Item Description Total Price Statewide Hospitality Fee $40.00 Check 116628 Date Paid: 05/24/2018 MN Dept of Labor & Industry Amount: $735.00 Inv. 83181140891 05/11/2018 OSHA Opt Rpt No 01518 Citation 1 amended penalty payment Item Description Total Price Page 10 of 30 PageJR2018 Invoices 83181140711 & 83181140891 $735.00 Check 116629 Date Paid: 05/24/2018 MN Dept of Labor & Industry Amount: $1,225.00 Inv. 83181140711 05/11/2018 OSHA Citation 1 Opt Rpt No 01418 amended penalty payment Item Description Total Price Invoices 83181140711 & 83181140891 $1,225.00 Check 116630 Date Paid: 05/24/2018 MTI Distributing Inc. Amount: $358.28 Inv. 116171500 05/01/2018 2 ball joint assembly, 2 flat pulley idler, 3 ball bearing Item Description Total Price 2 ball joint assembly, 2 flat pulley idler, 3 ball bearing $358.28 Check 116631 Date Paid: 05/24/2018 Nagell Appraisal & Consulting Inc. Amount: $900.00 Inv. 25888 05/22/2018 Hwy 55 Frontage Rd Appraisal Letter Report -V1803002 Item Description Total Price Hwy 55 Appraisal Letter Report $900.00 Check 116632 Date Paid: 05/24/2018 NAPA Genuine Auto Parts Co Amount: $1,725.79 Inv. 14306035180430 04/30/2018 NAPAApril 2018 Charges Item Description Total Price Inv #2349604830, 30 grease carts $131.70 Inv #2349605083, 1 Battery, Vehicle #5017 $111.59 Inv #2349605085, 1 Battery, Vehicle #1720 $110.47 Inv #605123, 1 quiet flow muffler, 1 tail pipe $330.24 Inv #2349605336, 1 Resonator assembly, vehicle #359 $146.99 Inv #2349605376, 1 U -joint, Vehicle #494 $18.31 Inv #2349605816, 1 Solenoid, 1 battery $160.46 Inv #605833, 2 Reducers, Denali $39.18 Inv #2349606122, 4 grommet, 4 lamp $12.56 Inv #2349606144, 20 EP grease cart, 4 D Earth $124.96 Inv #2349606159, 1 handle $16.49 Inv #2349606398, 1 rear u -joint, 2002 Chevrolet Silverado $29.69 Inv #2349606462, 8 U -bolts $27.42 Inv #2349606464, 4-2.5 gal blue def $40.00 Inv #2349607337, 2 Pag Oil $53.98 Inv #2349607480, 4 connectors $39.48 Inv #2349607511, 1 fuel filter $62.49 Inv #2349607738, 1 battery, Vehicle #5030 $42.99 Inv #2349607753, 1 tire pressure monitoring sensor, Vehicle #372 $39.99 Inv. 2349607229 04/23/2018 25 brake tubing, 4 brake fit tube nut Item Description Total Price 25 brake tubing, 4 brake fit tube nut $66.71 Inv. 2349607236 04/23/2018 1 oil fil strap wrench Item Description Total Price 1 oil fil strap wrench $5.64 Inv. 2349607262 04/23/2018 2 tube nut Item Description Total Price 2 tube nut $3.98 Inv. 2349607392 04/24/2018 1 battery Item Description Total Price 1 battery $110.47 Check 116633 Date Paid: 05/24/2018 Nardini Fire Equipment Co Inc. Amount: $1,249.01 Inv. IN00074605 04/30/2018 Recharge 21x CH extinguishers Item Description Total Price Recharge 21x CH extinguishers $1,249.01 Check 116634 Date Paid: 05/24/2018 Northern Sanitary/Norsan Amount: $899.93 Inv. 190970 05/11/2018 Parks - 1 case ea tissue/towel, 2 case hand soap, 12-1 qt cleaner Item Description Total Price Supplies $338.88 Page 11 of 30 PageJA018 Inv. 190975 05/11/2018 IC - 5 case tissue, 5 case towels, 1 case hand soap Item Description Total Price Janitorial Supplies $561.05 Check 116635 Date Paid: 05/24/2018 Nuss Truck and Equipment Amount: $75.80 Inv. 4554392P 05/17/2018 1 purge valve, vehicle #288 Item Description Total Price 1 purge valve, vehicle #288 $75.80 Check 116636 Date Paid: 05/24/2018 Office Depot Amount: $1,086.38 Inv. 112052443001 03/01/2018 1-2pk black on white tape Item Description Total Price 1-2pk black on white tape $18.99 Inv. 114923580001 03/12/2018 1 pk tape, 1-12pk correct tape, 1 pk tissue, 2 bx folder labels Item Description Total Price 1 pk tape, 1-12pk correct tape, 1 pk tissue, 2 bx folder labels $61.63 Inv. 114923792001 03/13/2018 1 Post-it note dispenser Item Description Total Price 1 Post-it note dispenser $12.34 Inv. 123106934001 04/05/2018 2-24pk AAA battery, 1 bx 10.5 env, 2-2pk blk tape, 2 Pledge wipes Item Description Total Price 2-24pk AAA battery, 1 bx 10.5 env, 2-2pk blk tape, 2 Pledge wipes $141.07 Inv. 126763432001 04/16/2018 304" Flush cables to go Item Description Total Price 30-4" Flush cables to go $327.30 Inv. 132091789001 04/30/2018 1-27x34 flip chart return/credit Item Description Total Price 1-27x34 flip chart return/credit ($47.59) Inv. 132297464001 04/27/2018 1 dz steno pad, 1 pk paperclip, 3dz ball pt pen, 1 dz liquid pen Item Description Total Price 1d steno pad, 1 pk paperclip, 3dz ball pt pen, 1dz liquid pen $62.71 Inv. 133148838001 05/01/2018 3 dz retract pen, 1 dz 8.5x11 pad, 2-12pk ylw note, 2 jumbo clip Item Description Total Price 3 dz retract pen, 1 dz 8.5x11 pad, 2-12pk ylw note, 2 jumbo clip $54.82 Inv. 133956219001 05/02/2018 1 dz 8.5x11" pads, 3 cyan HP ink, 2 dz #2 poly lead disp pencil Item Description Total Price 1 dz 8.5x11" pads, 3 cyan HP ink, 2 dz #2 poly lead disp pencil $133.07 Inv. 134484766001 05/03/2018 1 bx 100b reinforced tab letter folder Item Description Total Price 1 bx 100b reinforced tab letter folder $10.17 Inv. 134506876001 05/03/2018 1-15"trimmer, 1 stapler, 1 mouse support, 1-4pk 9v battery Item Description Total Price 1-15"trimmer, 1 stapler, 1 mouse support, 1-4pk 9v battery $261.71 Inv. 134955423001 05/04/2018 1 bx 3000c label, 1 bx 400 bdge insert, 2 pk divider, 1 st index Item Description Total Price 1 bx 3000c label, 1 bx 400 bdge insert, 2 pk divider, 1 st index $50.16 Check 116637 Date Paid: 05/24/2018 Overhead Door Co of the Northland Amount: $674.95 Inv. 103607 01/31/2018 PW - Reset wash bay door - turn off safety edge Item Description Total Price Reset wash bay door - turn off safety edge $674.95 Check 116638 Date Paid: 05/24/2018 Owens Companies Inc. Amount: $1,421.86 Page 12 of 30 Page6l*018 Inv. 77875 05/07/2018 Service/replacement - domestic pump Item Description Total Price Replace hot water heater recirculation pump - PS $858.86 Inv. 77955 05/15/2018 Replace space stat Item Description Total Price Relocate space thermostat - upstairs offices - PW $563.00 Check 116639 Date Paid: 05/24/2018 Oxygen Service Company Amount: $29.23 Inv. 08166420 05/17/2018 3 replacement medical oxygen tanks Item Description Total Price 3 replacement 02 tanks fills $29.23 Check 116640 Date Paid: 05/24/2018 Performance Signs & Displays Inc. Amount: $13.75 Inv. 9769 05/15/2018 1 vinyl graphic sign-Barb Thomson Item Description Total Price Sign for Barb Thomson $13.75 Check 116641 Date Paid: 05/24/2018 Personnel Evaluation Inc. Amount: $40.00 Inv. 27547 04/30/2018 4.1/4.30.18 JV PEP Billing Item Description Total Price INV 27547: PEP Billing 04.01-04.30.2018 $40.00 Check 116642 Date Paid: 05/24/2018 Pilates MN Amount: $94.50 Inv. 180414 04/14/2018 3.3/4.14.18 Pilates Reformer Instruction Item Description Total Price Pilates Instruction Mar-Apr 18 $94.50 Check 116643 Date Paid: 05/24/2018 Postmaster Amount: $7,000.00 Inv. 180508 05/08/2018 Bulk Postage Permit 1889 Deposit/Recreation Activity Guide Item Description Total Price Rec Activity Guide postage $7,000.00 Check 116644 Date Paid: 05/24/2018 Prairie Restorations Inc. Amount: $200.00 Inv. 11029 04/30/2018 2018 spring mow-CH Prairie Item Description Total Price Spring mow/burn prairie sites $200.00 Check 116645 Date Paid: 05/24/2018 Precise MRM LLC Amount: $163.53 Inv. IN2001016748 04/30/2018 Mar'18 Streets pooled data Item Description Total Price Pooled data $163.53 Check 116646 Date Paid: 05/24/2018 Printers Service Inc. Amount: $60.00 Inv. 282260 04/30/2018 IC 77" Ice knife sharp (3) Item Description Total Price 2018 PO for Blade Sharpening Services $60.00 Check 116647 Date Paid: 05/24/2018 Proscape Maintenance Inc. Amount: $93.48 Inv. 1160 05/01/2018 Apr'18 Snow removal - Wyndemere Farms Item Description Total Price April snow contract $93.48 Check 116648 Date Paid: 05/24/2018 Randy's Sanitation Inc. Amount: $2,095.52 Inv. 112118190518 05/19/2018 May'18 CWP Rubbish Removal Item Description Total Price May 2018 trash pick up $85.86 Inv. 112572180518 05/19/2018 May'18 ZWP Rubbish Removal Item Description Total Price May 2018 trash pick up - ZWP $85.86 Inv. 128252940518 05/19/2018 May'18 Bus Shelters Rubbish Removal Item Description Total Price Bus Shelters Service $563.40 Inv. 141320518 05/19/2018 May'18 PW Rubbish Removal Item Description Total Price Page 13 of 30 PageJA2018 May trash pickup - PW $266.51 Inv. 141570518 05/19/2018 May'18 PS Rubbish Removal Item Description Total Price May 2018 trash pick up $626.03 Inv. 14317480618 05/19/2018 May'18 PCC Rubbish Removal Item Description Total Price May 2018 trash pickup - PCC $467.86 Check 116649 Date Paid: 05/24/2018 Reinders Inc. Amount: $26.00 Inv. 305365900 04/30/2018 1 handheld spreader Item Description Total Price 1 handheld spreader $26.00 Check 116650 Date Paid: 05/24/2018 Safelite AutoGlass Amount: $179.73 Inv. 05155199842 05/04/2018 Windshield, Unit #359, COP Auto 2018-19 Item Description Total Price Invoice #05155-199842, unit 359, COP Auto 2018-19 $179.73 Check 116651 Date Paid: 05/24/2018 Michelle Schaefer Amount: $255.89 Inv. 180521 04/10/2018 Kitchen Sink Reimbursement- 15297 40th Ave N Item Description Total Price Kitchen Sink Reimbursement- 15297 40th Ave N $255.89 Check 116652 Date Paid: 05/24/2018 Security Mentor Inc. Amount: $5,073.00 Inv. 181820637 05/03/2018 Security Mentor Maint Renewal 7/1/18 - 6/30/20 Item Description Total Price Security Mentor Maint Renewal 5/2/18 - 5/1/20 $5,073.00 Check 116653 Date Paid: 05/24/2018 Sherwin Williams Amount: $25.99 Inv. 88784 05/17/2018 1 RAC 5 tip Item Description Total Price 1 RAC 5 tip $25.99 Check 116654 Date Paid: 05/24/2018 Silent Knight Sec Sys Of MN In Inv. 00104840 05/16/2018 PW - 5.4.18 investigate fire system Item Description Investigate fire supp system after fire - PW Inv. 00104845 05/17/2018 CH -Clear audible sound Item Description Clear audible alarm - CH Check 116655 Date Paid: 05/24/2018 Inv. 85831324 05/15/2018 Item Description Irrigation parts Check 116656 Date Paid: 05/24/2018 Inv. 180511 05/11/2018 Item Description MG pond pump & installation Check 116657 Date Paid: 05/24/2018 Inv. 11080006 04/30/2018 Item Description TM - Consulting The Meadows Park Consultant Inv. 11403003 04/30/2018 SiteOne Landscape/John Deere 1-4" Tee single wall, 1 King silver duct tape Spinner Service Company Inc. Replace/install pump at fire bowl fountain Amount: $392.50 Total Price $252.50 Total Price $140.00 Amount: $13.81 Total Price $13.81 Amount: SRF Consulting Group, Inc. Amount Prof Sery thru 4.30.18, PR130001.181, Meadows Pk Development Prof Sery thru 4.30.18, PR200001.181, Phase II Meadows Pk Devel Item Description The Meadows Community Park Consultant Inv. 11483002 04/30/2018 Prof Sery thru 4.30.18, Final Pmt -Plymouth Commons Traffic Study Page 14 of 30 $1,448.00 Total Price $1,448.00 $10,319.03 Total Price $5,114.46 $231.21 Total Price $3,604.50 PageJA2018 Item Description Final Invoice #11483.00-2 - Plymouth Commons Traffic Study Check 116658 Date Paid: 05/24/2018 Inv. 10153291 05/15/2018 Item Description Tire Purchases /2018 Inv. 10153492 05/22/2018 Item Description Tire Purchases /2018 Check 116659 Date Paid: 05/24/2018 Inv. 145120 05/03/2018 Item Description 2 sockets, 1 seal, vehicle #1717 Inv. 560968 05/01/2018 Item Description 2 wheel alignment, vehicle #1044 Suburban Tire Wholesale Inc. Amount: 2 Import rib tires 2 TR13 tubes Superior Brookdale Ford Amount: 2 sockets, 1 seal, vehicle #1717 2 wheel alignment, vehicle #1044 Check 116660 Date Paid: 05/24/2018 Taho Sportswear Inc. Amount Inv. 18TF0795 04/18/2018 43 polo button up shirt, 30 Eddie Bauer jacket-P&R staff apparel Item Description P&R Staff shirts P&R Staff shirts P&R Staff shirts P&R Staff shirts P&R Staff shirts P&R Staff shirts P&R Staff shirts Check 116661 Date Paid: 05/24/2018 ThyssenKrupp Elevator Inv. 3003801043 04/01/2018 4.1/6.30.18 PS Elevator maintenance Item Description Quarterly elevator maintenance contract - PS Check 116662 Date Paid: 05/24/2018 TimeSaver Off Site Secretarial Inv. M23822 05/14/2018 5.8.18 City Council Meeting 1.25 hr Item Description City Council Meetings Total Price $1,368.86 $77.96 Total Price $46.00 Total Price $31.96 $126.90 Total Price $29.64 Total Price $97.26 $3,581.75 Total Price $377.50 $80.25 $497.50 $229.00 $99.50 $462.75 $1,835.25 Amount: $1,300.98 Total Price $1,300.98 Amount: $176.50 Total Price $176.50 Check 116663 Date Paid: 05/24/2018 Town & Country Fence Inc. Amount: Inv. 1180164 04/30/2018 Station 73 - Repair broken fence from car accident Item Description Repair broken fence from car accident - Station 73 Check 116664 Date Paid: 05/24/2018 TransAlarm Inc. Inv. 94724963 05/01/2018 May-Jul'18 ZWP sprinkler system monitoring Item Description Contracted security services, for central and Zachary Inv. 94724964 05/01/2018 May-Jul'18 CWP sprinkler system monitoring Item Description Contracted security services, for central and Zachary Inv. 94724965 05/01/2018 May-Jul'18 FS2 Sprinkler system monitoring Item Description May-Jul'18 FS2 Sprinkler system monitoring Inv. 94724966 05/01/2018 May-Jul'18 FS1 Sprinkler system monitoring Item Description May-Jul'18 FS1 Sprinkler system monitoring Inv. 94724967 05/01/2018 May-Jul'18 FS3 Sprinkler system monitoring Item Description May-Jul'18 FS3 Sprinkler system monitoring Page 15 of 30 Amount $1,275.00 Total Price $1,275.00 $1,390.77 Total Price $329.01 Total Price $303.78 Total Price $252.66 Total Price $252.66 Total Price $252.66 Page61492018 Check 116665 Date Paid: 05/24/2018 ULINE Amount Inv. 97252544 05/03/2018 3 Class 2 vest, 6ea smoke & clear glasses, 2 hard hat -Jenkins Item Description Invoice #972244 - Order #13622398 - Tyson Jenkins - Safety Equip Check 116666 Date Paid: 05/24/2018 USA Bluebook Inv. 558841 04/30/2018 18ea pry bars Item Description Pry bars for trucks Inv# 558841 Rebate Funds Inv. 559345 04/30/2018 3-17" HD pry bars for crews Item Description 1-8 zone Rachio 3 sprinkler controller -Water Effic Pry bars for crews. # 559345 Rebate Prgm Check 116667 Date Paid: 05/24/2018 Verified Credentials Inc. Inv. 279384 04/30/2018 Apr'18 Background Screening Item Description INV 279384: April Background Screening Check 116668 Date Paid: 05/24/2018 Water Conservation Services Inc. Inv. 8533 05/22/2018 5.1/5.9.18 Water leak detection services Item Description Water break locates for May, # 8533 Check 116669 Date Paid: 05/24/2018 Waters Plumbing LLC Inv. 1811 05/02/2018 Kitchen Sink Replacement -15297 40th Ave N Item Description Kitchen Sink Replacement -15297 40th Ave N Check 116670 Date Paid: 05/24/2018 The Watson Company Inv. 887205 05/03/2018 IC Concession food resupply Item Description Open PO -Concession Resale Amount Amount: $139.00 Total Price $139.00 $676.03 Total Price $601.06 Total Price $74.97 $317.00 Total Price $317.00 Amount: $1,165.07 Total Price $1,165.07 Amount: $929.00 Total Price $929.00 Amount: $1,449.38 Check 116671 Date Paid: 05/24/2018 Wayzata Public Schools/ISD 284 Amount Inv. 17188850418 04/30/2018 4.13/4.28.18 Gymnastics facility/equipment use Total Price $1,449.38 $100.80 Item Description Total Price Building Rental Fee -for April 2018 $100.80 Check 116672 Date Paid: 05/24/2018 Weld and Sons Plumbing Inc. Amount: $393.00 Inv. 11908186 05/04/2018 Provide/install new Jomer 2" ball valve/water main -Greenwood Pak Item Description Greenwood Park Check 116673 Date Paid: 05/24/2018 Inv. 359197 05/14/2018 Item Description Various Tire Purchases Inv. 359351 05/18/2018 Item Description Various Tire Purchases Inv. 809049 04/17/2018 Westside Wholesale Tire Inc. 12-245/55WR18 FS Fire hawk Pursuit B tires 4 P265/70R17 Hankou RF10 tires 1-25" small arctic O-ring, 1-20.5R25 Primes RS300 tire Item Description Various Tire Purchases Check 116674 Date Paid: 05/24/2018 Sean Willey Inv. 18338 05/08/2018 1-8 zone Rachis 3 smart sprinkler controller Item Description Water Efficiency Rebate Program - Rebate Funds Check 116675 Date Paid: 05/24/2018 Susan & Andrew Witzke Inv. 12345618334 05/08/2018 1-8 zone Rachio 3 sprinkler controller -Water Effic Rebate Prgm Page 16 of 30 Total Price $393.00 Amount: $3,417.47 Total Price $1,570.08 Total Price $506.82 Total Price $1,340.57 Amount: $200.00 Total Price $200.00 Amount: $200.00 Page614#2 018 Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $200.00 Check 116676 Date Paid: 05/24/2018 WL Construction Supply Inc. Amount: $419.99 Inv. 18063 05/03/2018 14" Blue Rescue Master diamond blade for pipe saw Item Description Total Price 14" Blue Rescue Master diamond blade for pipe saw $419.99 Check 116677 Date Paid: 05/24/2018 Wolcyn Tree Farms and Nursery Amount: $3,720.00 Inv. 29595 05/10/2018 2018 plant sale -100 Ponderosa pine, 100 Meyer spruce Item Description Meyer spruce - #2 Ponderosa pine - #2 Delivery Check 116678 Date Paid: 05/24/2018 Inv. 1805032 05/03/2018 WSB & Associates Prof Sery Mar'18 1-494/CSAH 9 Proj No R-011485-000 .y 1, 1 vv.vv $1,700.00 $320.00 Amount: $13,864.50 Item Description Total Price Preliminary Engineering Co.9/494 Project $13,864.50 Check 116679 Date Paid: 05/24/2018 Xcel Energy Amount: $5,510.73 Inv. 51520312000518 05/14/2018 4.2/5.1.18 Lift Stations Item Description Total Price 4.2/5.1.18 Lift Stations $5,510.73 Check 116680 Date Paid: 05/24/2018 Zee Medical Service Amount: $253.20 Inv. 54100765 05/17/2018 CH medical cabinet resupply Item Description Total Price CH medical cabinet resupply $119.35 Inv. 54100766 05/17/2018 PD medical cabinet resupply Item Description Total Price PD medical cabinet resupply $39.60 Inv. 54100767 05/17/2018 PW medical cabinet resupply Item Description Total Price PW medical cabinet resupply $94.25 Check 116681 Date Paid: 05/24/2018 Jared Ackmann Amount: $45.12 Inv. 201800021 05/22/2018 Refund PL Perm it#201 800021, 2120 Black Oaks Ln N Item Description Total Price Refund PL Permit #201800021 - 2120 Black Oaks Lane N $45.00 Refund PL Permit #201800021 - 2120 Black Oaks Lane N $0.12 Check 116682 Date Paid: 05/24/2018 Craig Bartlett Amount: $192.47 Inv. 3161865 05/08/2018 1-8 zone 2nd generation Wi-Fi Rachio smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $192.47 Check 116683 Date Paid: 05/24/2018 Justin Cronin Amount: $184.58 Inv. 5179466 05/15/2018 1-8 zone 2nd generation Wi-Fi Rachio smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $184.58 Check 116684 Date Paid: 05/24/2018 Patrick Grant Amount: $200.00 Inv. 18357 05/08/2018 1-8 zone Rachio 3 sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $200.00 Check 116685 Date Paid: 05/24/2018 Hansen Thorp Pellinen Olson, Inc./DBA HTPO Amount: $1,536.75 Page 17 of 30 PageA? 018 Inv. 48051 05/09/2018 Proj No 18-027.1 Neighborhood Drainage Improvements Item Description Total Price 18015 - Neighborhood Drainage Improvements Design $1,536.75 Check 116686 Date Paid: 05/24/2018 Gary Irish Amount: $70.00 Inv. 180427 04/27/2018 Reimbursement for damage - 2 sprinkler heads Item Description Total Price Reimbursement for damage to sprinkler heads $70.00 Check 116687 Date Paid: 05/24/2018 Abhijeet Kumar Amount: $161.28 Inv. 3386669 05/18/2018 1-8 zone Wi-Fi Rachio smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $161.28 Check 116688 Date Paid: 05/24/2018 MarKir Services / CleanMidWest Amount: $1,650.00 Inv. 2588 05/17/2018 Oakwood Playfield Graffiti removal, COP Prop 2018-09 Item Description Total Price Invoice 2588, Oakwood Playfield Graffiti, COP Prop 2018-09 $1,650.00 Check 116689 Date Paid: 05/24/2018 Cheryl Metro Tent Rental, Inc. Amount: $650.00 Inv. 6618 04/13/2018 5.19.18 Bark in the Park - 50-8' table, 50 folding chair rental Item Description Total Price Tables, Chairs, Setup and Takedown cost $650.00 Check 116690 Date Paid: 05/24/2018 Kirit Patel Amount: $200.00 Inv. 19554 05/18/2018 1-8 zone Rachio 3 smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $200.00 Check 116691 Date Paid: 05/24/2018 Charles Pulliam Amount: $164.62 Inv. 521648 05/17/2018 Irrigation Head Replacement -Pond Maintenance Proj 2018004 Item Description Total Price Irrigation Head Replacement from Pond Maintenance Project $164.62 Check 116692 Date Paid: 05/24/2018 Sanity Solutions Amount: $1,704.00 Inv. INV12721 05/23/2018 5.18.18/5.17.19 - 30 Workspace One Subscription Item Description Total Price Workspace One $1,704.00 Check 116693 Date Paid: 05/24/2018 Vern Scherbenske Amount: $200.00 Inv. 9568244 05/15/2018 1 RainMachine Touch HD -12 Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $200.00 Check 116694 Date Paid: 05/24/2018 Wesley Trice Amount: $192.45 Inv. 2397801 05/13/2018 1-8 zone Wi-Fi Rachio smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $192.45 Check 116695 Date Paid: 05/24/2018 Dave Durenberger Amount: $354.85 Inv. 180518 05/11/2018 5.6/5.11.18 PD Training, Per Diem M&IE, fuel, rifle patches Item Description Total Price 5.6/5.11.18 PD Training, Per Diem M&IE, fuel, rifle patches $354.85 Check 116696 Date Paid: 05/24/2018 Heidi Finn Amount: $68.67 Inv. 180518 05/10/2018 5.8/5.10.18 FLSA Training Mileage Reimbursement Item Description 5.8/5.10.18 FLSA Training Mileage Reimbursement Page 18 of 30 Total Price $68.67 Page6*018 Check 116697 Date Paid: 05/24/2018 David Flannigan Amount: $19.00 Inv. AEOPOC700FF9 05/09/2018 AC Recovery Certification - D. Flannigan Item Description Total Price AC Recovery Certification - D. Flannigan $19.00 Check 116698 Date Paid: 05/24/2018 Thomas Jones Amount: $68.00 Inv. 180522 05/22/2018 Water & Sewer Class D Test Reimbursement Item Description Total Price Water & Sewer Class D Test Reimbursement $68.00 Check 116699 Date Paid: 05/24/2018 Kevin P Schik Amount: $316.36 Inv. 180522 05/11/2018 5.6/5.11.18 Sniper Training, Per Diem M&IE, gun sling Item Description Total Price 5.6/5.11.18 Sniper Training, Per Diem M&IE, gun sling $316.36 Check 116700 Date Paid: 05/31/2018 Aftermath Services LLC Amount: $90.00 Inv. JC20180586 05/09/2018 Biohazard - Squad Cleaning Item Description Total Price Biohazard - Squad Cleaning $90.00 Check 116701 Date Paid: 05/31/2018 AI's Coffee Company Amount: $167.10 Inv. 125641A 05/11/2018 IC Concession coffee resupply Item Description Total Price Open PO -Concession Resale $167.10 Check 116702 Date Paid: 05/31/2018 Badger Meter Inc. Amount: $11,766.82 Inv. 1229439 04/25/2018 48 - 3/4 Meters Item Description Total Price 48 - 3/4 Meters Inv # 1229439 $11,766.82 Check 116703 Date Paid: 05/31/2018 Boyer Trucks Amount: $759.99 Inv. 194813R 05/07/2018 4 O ring seals, 2 10. O Ring, 3 O ring kit, vehicle #2009 Item Description Total Price 4 O ring seals, 2 10. O Ring, 3 O ring kit, vehicle #2009 $15.33 Inv. 194923R 05/08/2018 1 filter, 2 C seal, 2 0 ring Item Description Total Price 1 filter, 2 C seal, 2 0 ring $165.62 Inv. 194964R 05/09/2018 1 Lock set, vehicle #285 Item Description Total Price 1 Lock set, vehicle #285 $57.14 Inv. 195039R 05/10/2018 1 valve, 1 harness, 1 panel Item Description Total Price Blanket Purchase Order Effective Jan2018 - Dec2018 $81.30 277 Truck repair. #195039r, 195039rx1 $440.60 Check 116704 Date Paid: 05/31/2018 Braun Intertec Corporation Amount: $2,654.35 Inv. 6126884 04/25/2018 3.26/4.20.18 Prof Sery Proj ID 81801145 Pavement Consulting Item Description Total Price $2,654.35 Check 116705 Date Paid: 05/31/2018 Canvas Solutions Inc. Amount: $372.00 Inv. 1211129799 05/18/2018 5.11/5.10.19 Annual Canvas App subscription - L Batula Item Description Total Price Canvas App for Admin $372.00 Check 116706 Date Paid: 05/31/2018 CenturyLink Amount: $1,200.00 Inv. 1441467481 05/23/2018 4.24/5.23.18 Internet, 5.24/6.23.18 Loop Item Description Total Price 4.24/5.23.18 Internet, 5.24/6.23.18 Loop $1,200.00 Check 116707 Date Paid: 05/31/2018 Choice Signs & Graphics Inc. Amount: $504.00 Page 19 of 30 Page6?412018 Inv. 5324 05/23/2018 Item Description Dog Signs Check 116708 Date Paid: 05/31/2018 Inv. 4005683355 05/07/2018 Item Description CH Rug laundering Check 116709 Date Paid: 05/31/2018 Inv. 8701 05/15/2018 Item Description Training class Check 116710 Date Paid: 05/31/2018 Inv. 3319938 05/22/2018 Item Description TP, PT, Soap, urinal blocks - CH Check 116711 Date Paid: 05/31/2018 Inv. 180529 05/29/2018 Item Description License Tabs #1706 Check 116712 Date Paid: 05/31/2018 Inv. 18047 05/10/2018 Item Description Parkers Lake Batting Cage Check 116713 Date Paid: 05/31/2018 Inv. 82700053418 04/11/2018 Item Description Sodium Permanganate (Ben) Inv. 82700073018 05/08/2018 Item Description Sodium Hypo Zach # 827000730.18 Inv. 82700074918 05/09/2018 12-24"x34" corrugated plastic dog signs Cintas Corporation Amount: 5.7.18 CC mat service City of Golden Valley Amount FD Joint Leadership Training class Dalco Amount CH - 6 case TP, 10 case PT, 6 case Soap, 1 case urinal blocks Department of Motor Vehicles -DVS Amount: License Tabs #1706 DH Athletics LLC Amount: 2-12'x12'x70' 3.5mm batting tunnel net - Parkers Lake DPC Industries Inc. Amount: 786gl @ 9.08 Sodium Permanganate 20% - Central Plant 4,561gl @ .787 Sodium Hypo 12.5% - Zachary 254gl @ 9.08 Sodium permanganate 20% - Central Plant Item Description Sodium Permag, #827000749-18 Check 116714 Date Paid: 05/31/2018 DTS/Definitive Technology Inv. INV164380 05/22/2018 1 waste toner Item Description 1 waste toner Inv. INV164453 05/22/2018 4.22/5.21.18 copy overage LL Conf Room Item Description 4.22/5.21.18 copy overage LL Conf Room Inv. INV164454 05/22/2018 5.22/6.21.18 Printer Maintenance Item Description 5.22/6.21.18 Printer Maintenance Check 116715 Date Paid: 05/31/2018 ECM Publishers Inc. Inv. 593653 04/26/2018 5.8.18 PH, Proj No ST189001.001, Killmer Pk St Reconstruction Item Description 5.8.18 PH, Proj No ST189001.001, Killmer Pk St Reconstruction Inv. 593654 04/26/2018 2018 Mill/Overlay Bids Proj No ST189004002 Item Description Page 20 of 30 Amount Total Price $504.00 $123.51 Total Price $123.51 $400.00 Total Price $400.00 $1,179.43 Total Price $1,179.43 $11.00 Total Price $11.00 $2,323.00 Total Price $2,323.00 $13,032.35 Total Price $7,137.74 Total Price $3,589.51 Total Price $2,305.10 $399.83 Total Price $54.66 Total Price $12.17 Total Price $333.00 Amount: $1,047.20 Total Price $464.10 Total Price $583.10 Page6018 Check 116716 Date Paid: 05/31/2018 Electronic Communication Systems LLC/ECSI Amount: $752.50 Inv. 39890 04/30/2018 Professional Services - Setup Mobile Gateway Sys Config Item Description Total Price Professional Services - Setup Mobile Gateway Sys Config $752.50 Check 116717 Date Paid: 05/31/2018 Emergency Response Solutions Amount: $1,651.37 Inv. 10953 05/18/2018 6 Scotchlite reflective Lieutenant helmet title tapes Item Description Helmet tapes Inv. 11038 05/18/2018 Item Description Helmets Inv. 11119 05/21/2018 Item Description Calibration Gas Check 116718 Date Paid: 05/31/2018 Inv. MNPLY102335 05/07/2018 4 Cairns 664 Helmets 2 Calibration cylinder gas Fastenal Company 1-5/8x1/2" S&D Dr, 2-5/8YZ KG USS thru HD, 2-5/8-11 NylockNE Total Price $60.17 Total Price $902.92 Total Price $688.28 Amount: $33.80 Item Description Total Price 1-5/8x1/2" S&D Dr, 2-5/8YZ KG USS thru HD, 2-5/8-11 NylockNE $33.80 Check 116719 Date Paid: 05/31/2018 FedEx Amount: $272.34 Inv. 619123071 05/23/2018 4.23/5.11.18 HR, IT, PW -Water, FD courier services Item Description 4.23.18 HR courier services 4.23.18 IT courier services 5.11.18 PW -water courier services 5.11.18 FD courier services Check 116720 Date Paid: 05/31/2018 Inv. 189003 05/25/2018 Item Description Lift Gate Springs Check 116721 Date Paid: 05/31/2018 Inv. 13166 05/08/2018 Felling Trailers 3 Lift Gate Springs Total Price $51.91 $60.18 $100.93 $59.32 Amount: $46.65 Total Price $46.65 Glass Plus Inc. Amount 4-34 1/8x36x1/8 clear tempered glass - Station map boxes Item Description Station map Boxes Check 116722 Date Paid: 05/31/2018 Grainger Amount: Inv. 9763659670 04/20/2018 1-2"x25' blue water disch hose Item Description 1-2"x25' blue water disch hose Inv. 9779157859 05/07/2018 6ea Melt blown cartridge Item Description 6ea Melt blown cartridge Inv. 9779632737 05/07/2018 10ea time delay midget fuse Item Description 10ea time delay midget fuse Inv. 9781220919 05/08/2018 1-1" black spray nozzle Item Description 1-1" black spray nozzle Inv. 9782300298 05/09/2018 5-11.8" pk100 cable tie, 3-17.7" pk50 cable tie Item Description 5-11.8" pk100 cable tie, 3-17.7" pk50 cable tie Check 116723 Date Paid: 05/31/2018 Green Stuff Outdoor Services Amount: Inv. 237037 05/23/2018 Nov'17 snow contract (invoice rec'd 5/23/18) Page 21 of 30 $347.44 Total Price $347.44 $573.02 Total Price $57.44 Total Price $270.60 Total Price $76.60 Total Price $19.96 Total Price $148.42 $408.02 Page6018 Item Description Snow contract invoice #237037 & 240024 Inv. 240024 05/23/2018 Apr'18 snow contract (invoice rec'd 5/23/18) Item Description Check 116727 Date Paid: 05/31/2018 Snow contract invoice #237037 & 240024 Check 116724 Date Paid: 05/31/2018 Gregor Farm & Greenhouse Inc. Inv. 4065 01/08/2018 2018 Flower order (1049) Item Description @ $4.495 - WTP 2018 Flower Order Item Description Inv. 4126 05/10/2018 3 flats pansy's for MG Item Description Pansies for MG Check 116728 Date Paid: 05/31/2018 Check 116725 Date Paid: 05/31/2018 Hach Company Inv. 10952880 05/09/2018 Water testing chemicals/supplies Item Description Chemicals for testing Check 116726 Date Paid: 05/31/2018 Mary Hall Inv. 180501 05/01/2018 6.20.18 Entertainment for 90's Party - Senior Rec Program Total Price $204.01 Total Price $204.01 Amount: $5,761.10 Total Price $5,695.10 Total Price $66.00 Amount: $323.29 Total Price $323.29 Amount $150.00 Item Description Total Price Entertainment for 90's Party - Senior Rec Program $150.00 Check 116727 Date Paid: 05/31/2018 Hawkins Inc. Amount: $2,083.20 Inv. 4274332 05/04/2018 330 GA Hydro Acid @ $2.01, 315.8845 GA LPC -9L @ $4.495 - WTP Item Description Total Price Hydro Acid, # 4274332 $2,083.20 Check 116728 Date Paid: 05/31/2018 Itron Inc. Amount: $2,729.74 Inv. 484756 05/12/2018 June'18/Aug'18 MVRS software/handhelds maintenance Item Description Total Price June 2018 - Aug 2018 maintenance of MVRS software and handhelds $2,729.74 Check 116729 Date Paid: 05/31/2018 Roger Johnson Amount: $186.89 Inv. 1467460 05/03/2018 1-8 zone Rachio 3 smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $186.89 Check 116730 Date Paid: 05/31/2018 K&S Engraving Amount: $52.90 Inv. 9603 05/23/2018 14 Par Tags -Anderson, Collins, Hortenbach, Olson, Norman Item Description Total Price Par Tags $52.90 Check 116731 Date Paid: 05/31/2018 Kamida Inc. Amount: $2,021.25 Inv. 001726 05/24/2018 Imperial Hills Ped Ramp, Job #1451 Item Description Total Price Imperial Hills Ped Ramp $2,021.25 Check 116732 Date Paid: 05/31/2018 Keys Well Drilling Co Amount: $39,405.00 Inv. 2018010 04/30/2018 Remove/inspect/reinstall exact replacement pump/motor - Zachary Item Description Total Price Labor for tear down, rebuild & replace high service pump for Zach $10,330.00 New high service pump & parts Zachary Inv # 2018010 $14,537.50 Parts & high service pump for Zachary Inv # 2018010 $14,537.50 Check 116733 Date Paid: 05/31/2018 Klein Underground LLC Amount: $1,155.65 Inv. 76172 05/07/2018 900 Forestview curb & gutter repair Item Description Total Priced Page 22 of 30 Page6? 018 975 10 Ave, 900 Forestview, concrete curb. # 76175, 76172 $530.75 Inv. 76175 05/07/2018 975 10th Ave curb & gutter repair Midwest Blinds Inv. 33273 05/08/2018 Item Description Item Description Total Price 975 10 Ave, 900 Forestview, concrete curb. # 76175, 76172 Minnesota Equipment/MN Equipment $624.90 Check 116734 Date Paid: 05/31/2018 KTCO Inc. Amount: $2,160.00 Inv. 118 04/30/2018 Nov'17/Apr'18 Car Washes 1 V -belt, vehicle #5029 Item Description Item Description 1 V -belt, vehicle #5029 Total Price Nov - April Car Washes Item Description $2,160.00 Check 116735 Date Paid: 05/31/2018 Lano Equipment Inc. Amount: $6,419.00 Inv. 03559097 05/08/2018 New Bobcat Soil Conditioner LaCompte Playground Cargo Net Item Description Check 116743 Date Paid: 05/31/2018 MMKR/Malloy Montague, Karnowski Total Price New Bobcat Soil Conditioner Item Description $6,419.00 Check 116736 Date Paid: 05/31/2018 Larson Companies/Peterbilt Amount: $37.56 Inv. 2504130312 05/10/2018 1 HD fuel spin -on filter Item Description Total Price 1 HD fuel spin -on filter $8.10 Inv. 2504133885 05/09/2018 2 spin on oil filter, 1 hydraulic spin on filter, 1 filter Item Description Total Price 2 spin on oil filter, 1 hydraulic spin on filter, 1 filter $29.46 Check 116737 Date Paid: 05/31/2018 MCMA Amount: $377.39 Inv. 180524 05/24/2018 5.1.18/4.30.19 MCMA Membership - D Callister, L Hokkanen Item Description 2 Memberships Check 116738 Date Paid: 05/31/2018 MES Inc. Inv. IN1225964 05/09/2018 2 Lieutenant title tape Item Description 2 Lieutenant title tape Check 116739 Date Paid: 05/31/2018 Midway Ford Amount: Inv. 117398 05/10/2018 2018 Ford Explorer #1723, new unmarked replacing vehicle #1701 Total Price $377.39 Amount: $14.55 Item Description 2018 Ford Explorer Check 116740 Date Paid: 05/31/2018 Midwest Blinds Inv. 33273 05/08/2018 FS3 - 14ea mini blinds Item Description FS3 - Bali 1" alum blinds - Tender Taupe - Day room, B.Duncan office Check 116741 Date Paid: 05/31/2018 Minnesota Equipment/MN Equipment Inv. P63464 05/24/2018 1 Synchronous belt, vehicle #5042 Item Description 1 Synchronous belt, vehicle #5042 Inv. P68090 05/23/2018 1 V -belt, vehicle #5029 Item Description 1 V -belt, vehicle #5029 Inv. P68091 05/23/2018 1 cover, 1 element -trimmer parts Item Description 1 cover, 1 element -trimmer parts Check 116742 Date Paid: 05/31/2018 Miracle Recreation Equipment Inv. 799573 05/17/2018 1 Cargo Net w/Rungs - LaCompte Playground Item Description LaCompte Playground Cargo Net Check 116743 Date Paid: 05/31/2018 MMKR/Malloy Montague, Karnowski Inv. 44508 05/10/2018 2017 audit progress billing thru 4.30.18 Item Description Page 23 of 30 $26,480.46 Total Price $26,480.46 Amount: $1,550.50 Total Price $1,550.50 Amount: $159.15 Total Price $109.73 Total Price $37.98 Total Price $11.44 Amount: $654.10 Total Price $654.10 Amount: $21,315.00 Total Price Page6018 Audit of Financial Statements for the year ended 12/31/2017 $21,315.00 Check 116744 Date Paid: 05/31/2018 MN Dept of Health Amount: $40.00 Inv. 756972 05/04/2018 2018 Statewide Hospitality Fee - PIC Item Description Total Price Statewide Hospitality Fee - Concession Stand $40.00 Check 116745 Date Paid: 05/31/2018 MnFiam Book Sales Amount: $64.00 Inv. 2544 05/16/2018 1 Fire & Life Safety Educator Textbook Item Description Total Price Text book $64.00 Check 116746 Date Paid: 05/31/2018 MTI Distributing Inc. Amount: $121.69 Inv. 116148100 04/30/2018 10 flow control stem, 10 Bleed cap assembly, 20 O-ring Item Description Total Price 10 flow control stem, 10 Bleed cap assembly, 20 O-ring $61.80 Inv. 116212000 05/02/2018 1-11/2" coupling, 1 -Kwik repair coupler, 1-11/2" flow -span cplg Item Description Total Price 1-11/2" coupling, 1 -Kwik repair coupler, 1-11/2" flow -span cplg $14.60 Inv. 116259500 05/04/2018 1-11/2" PVC ball valve, 1-11/2" Slip fix coupling spears Item Description Total Price 1-11/2" PVC ball valve, 1-11/2" Slip fix coupling spears $17.89 Inv. 116273600 05/07/2018 1-2" Slip fix coupling spears, 1-2" ELL 90 Deg SXS, 2-2" Cplg Item Description Total Price 1-2" Slip fix coupling spears, 1-2" ELL 90 Deg SXS, 2-2" Cplg $27.40 Check 116747 Date Paid: 05/31/2018 National Camera Exchange Inc. Amount: $964.94 Inv. 0522801 BHJN 05/22/2018 6 canvas wrapped office pictures Item Description Total Price Office Pictures -Brian $964.94 Check 116748 Date Paid: 05/31/2018 Networkfleet Inc. Amount: $170.00 Inv. OSV1314626 02/01/2018 Jan'18 Parks GPS Units Item Description Total Price GPS Units $170.00 Check 116749 Date Paid: 05/31/2018 New Look Contracting Inc. Amount: $111,297.88 Inv. 180507 05/07/2018 Proj No WR189004.001, 2018 Pond Maintenance Project Item Description Total Price 2018 Pond Maintenance Project - WR189001 $61,267.88 Inv. 180522 05/22/2018 Release of Grading Permit Financial Guarantee - GP #2017119 Item Description Total Price Release of Grading Permit Financial Guarantee - GP #2017119 $19,250.00 Inv. 180529 05/29/2018 Proj No ST189004.001, 2018 Utility Maintenance Water Main, Pmt 2 Item Description Total Price 2018 M&O Utility Maintenance - Water Main $30,780.00 Check 116750 Date Paid: 05/31/2018 Northern Sanitary/Norsan Amount: $270.08 Inv. 191090 05/21/2018 PCC - 8 box gloves, 1 case sanitizer, 12-1 qt glass cleaner Item Description Total Price Cleaning Supplies - PCC $270.08 Check 116751 Date Paid: 05/31/2018 Nystrom Publishing Co Inc. Amount: $5,940.23 Inv. 40565 05/08/2018 May/June'18 35,083 Plymouth Newsletter & 2018 Financial Extra Item Description Page 24 of 30 Total Price Page6?h018 May/June 2018 Plymouth Newsletter & 2018 Financial Extra $5,940.23 Check 116752 Date Paid: 05/31/2018 Office Depot Amount: $1,025.49 Inv. 112811299001 03/05/2018 1 case 10pk 30x40" white board Item Description Total Price 1 case 10pk 30x40" white board $55.99 Inv. 113852738001 03/07/2018 1-21 pocket file w/flap, 1 Steel mesh organizer Item Description Total Price 1-21 pocket file w/flap, 1 Steel mesh organizer $118.98 Inv. 113852934001 03/07/2018 1 pk Pental pencil w/eraser Item Description Total Price 1 pk Pental pencil w/eraser $15.19 Inv. 115645698001 03/14/2018 1-16x12 wall erase yr Item Description Total Price 1-16x12 wall erase yr $11.04 Inv. 119022749001 03/26/2018 2 Metal wire desk caddy Item Description Total Price 2 Metal wire desk caddy $25.98 Inv. 119022750001 03/27/2018 3 Magnetic marker cup Item Description Total Price 3 Magnetic marker cup $34.77 Inv. 119968436001 03/28/2018 1 Microban utility wrist rest Item Description Total Price 1 Microban utility wrist rest $11.29 Inv. 131800239001 04/26/2018 2 Literature holders Item Description Total Price 2 Literature holders $30.38 Inv. 131800558001 04/26/2018 1 pk 8.5x11 80# paper cover, 1 pk 8.5x11 60# paper cover Item Description Total Price 1 pk 8.5x11 80# paper cover, 1 pk 8.5x11 60# paper cover $22.38 Inv. 132384554001 04/27/2018 1 bx folder, 1 dz legal pad, 1 bx shop ticket holders, 1-6pk tape Item Description Total Price 1 bx folder, 1 dz legal pad, 1 bx shop ticket holders, 1-6pk tape $108.79 Inv. 134276293001 05/03/2018 1-58Qt storage box, 12 dz med bl pen, 2 Lit holder, 1 pk paper Item Description Total Price 1-58Qt storage box, 12 dz med bl pen, 2 Lit holder, 1 pk paper $52.61 Inv. 135043752001 05/04/2018 6-8.5x11 paper cover Item Description Total Price 6-8.5x11 paper cover $59.34 Inv. 135044015001 05/04/2018 5 pk Uniball gel refill Item Description Total Price 5 pk Uniball gel refill $19.95 Inv. 136519180001 05/10/2018 4 bx 3x4 holder clip Item Description Total Price 4 bx 3x4 holder clip $66.68 Inv. 137099042001 05/10/2018 1 bx bink tab guide, 2-12pk popup notes, 1-12pk 3x5 note Item Description Total Price 1 bx bink tab guide, 2-12pk popup notes, 1-12pk 3x5 note $69.46 Inv. 137565181001 05/11/2018 4pk mini Sharpie, 2 dz fine Sharpie mkr, 1-12pk correction tape Item Description Total Price 4pk mini Sharpie, 2 dz fine Sharpie mkr, 1-12pk correction tape $51.55 Inv. 137612516001 05/11/2018 10 rl shipping label, 1dz steno pad, 1 dz 8.5x11 white pad Item Description Total Price 10 rl shipping label, 1dz steno pad, 1 dz 8.5x11 white pad $271.11 Page 25 of 30 Page6?472018 Check 116753 Date Paid: 05/31/2018 Ostvig Tree, Inc. Amount Inv. 29871 05/08/2018 4.30/5.4.18 street/parks tree pruning Item Description 2018 Tree Maintenance (2nd year of 2 year contract) Inv. 29923 05/10/2018 Tree pruning -26th Ave N/Troy Ln, Basswood/1205 Forestview Ln N Item Description Total Price 2018 Tree Maintenance (2nd year of 2 year contract) Inv. 29924 05/10/2018 Force Cut tree removal - 10405 Bass Lk Rd Item Description $798.25 Force Cut tree removal Total Price Inv. 29925 05/10/2018 Tree removal - 18215 19th Ave N Item Description Total Price 2018 Tree Maintenance (2nd year of 2 year contract) Check 116754 Date Paid: 05/31/2018 Owens Companies Inc. Inv. 78001 05/22/2018 Check leaking valve, admin area - CH Item Description $586.00 Check leaking valve, admin area - CH Total Price Inv. 78011 05/22/2018 Balance airflow - upper PW offices - PW Item Description Balance airflow - upper PW offices - PW Check 116755 Date Paid: 05/31/2018 Phasor Electric Company Inv. 046082 05/11/2018 IC - Repair parking lot lights - replaced photocell Item Description $968.00 Repair parking lot lights - replaced photocell Check 116756 Date Paid: 05/31/2018 Pond & Lighting Designs Inc. Inv. 20181202 05/25/2018 Spring Fountain Install - Parkers Lake Item Description Parkers Lake Inv. 20181206 05/25/2018 Spring Fountain Install - Hilde Park Item Description Hilde Check 116757 Date Paid: 05/31/2018 PPG Architectural Finishes Inc. Inv. 940602076509 05/17/2018 Field Striping Paint (62) Item Description Field Striping Paint Check 116758 Date Paid: 05/31/2018 Printers Service Inc. Inv. 282343 05/13/2018 IC 77" Ice knife sharpening (6) Item Description 2018 PO for Blade Sharpening Services Check 116759 Date Paid: 05/31/2018 Ramsey County Inv. 18019857 05/16/2018 Bail - Shannon Marie Johnston, 18-19857 Item Description Bail - Shannon Marie Johnston, 18-19857 Check 116760 Date Paid: 05/31/2018 Real Time Translations Inc./RTT Inv. 112107 03/05/2018 Mar'18 PD Access Fees Item Description Monthly Access Fee March Check 116761 Date Paid: 05/31/2018 Reinders Inc. Inv. 3054045900 05/08/2018 50-50 Ib ea 50/50 blue/rye seed mix, 70/30 overseeder mix Item Description 50-50 Ib ea 50/50 blue/rye seed mix, 70/30 overseeder mix Inv. 305407100 05/08/2018 50-50 Ib 50/50 blue/rye seed mix Page 26 of 30 Amount Amount: Amount $5,710.50 Total Price $4,326.00 Total Price $798.25 Total Price $351.75 Total Price $234.50 $893.00 Total Price $586.00 Total Price $307.00 $172.80 Total Price $172.80 $968.00 Total Price $484.00 Total Price $484.00 Amount: $2,525.78 Total Price $2,525.78 Amount: $120.00 Total Price $120.00 Amount: $400.00 Total Price $400.00 Amount: $40.00 Total Price $40.00 Amount: $345.27 Total Price $218.50 Page6* 018 Item Description 50-50 Ib 50/50 blue/rye seed mix Inv. 305427400 05/11/2018 1 14-14-14 container-PCC/MG/Zach/Hilde/Parkers Item Description 1 14-14-14 container-PCC/MG/Zach/Hilde/Parkers Check 116762 Date Paid: 05/31/2018 Republic Services #894 Inv. 894004620245 04/30/2018 Drop-off Day 2018 - 11 MSW, 2 scrap metal, 3 trucks/drivers Item Description Drop -Off Day 2018 - MSW, CD, Scrap Metal Check 116763 Date Paid: 05/31/2018 Roadkill Animal Control / Curtis A Finch Inv. 180430 04/30/2018 4.9/4.13.18 Dead deer removal (2) Item Description April Deer Disposal Check 116764 Date Paid: 05/31/2018 S&S Tree / Davey Tree Expert Company Inv. 912478263 05/09/2018 2018 #1 Leaf Disease Treatment -PW Item Description Leaf Disease Treatment Check 116765 Date Paid: 05/31/2018 Schindler Elevator Corp Inv. 8104807022 06/01/2018 Elevator preventative maintenance - Station 73 & Transit C Item Description Station 73 & Transit C -Quarterly Billing Inv. 8104807860 06/01/2018 6.1./8.31.18 Elevator maintenance contract - PS Total Price $101.50 Total Price $25.27 Amount: $14,569.20 Total Price $14,569.20 Amount: $186.00 Total Price $186.00 Amount: $1,125.00 Total Price $1,125.00 Amount: $2,095.17 Item Description Elevator maintenance contract - 6/1-8/31/18 - PS Inv. 8104810813 06/01/2018 6.1/8.31.18 Elevator preventative maintenance -PCC Item Description Elevator maintenance contract - 6/1/18-8/31/18 PCC Check 116766 Date Paid: 05/31/2018 Inv. 608264674 05/21/2018 Item Description Remote Desktop Services Check 116767 Date Paid: 05/31/2018 Inv. 00104857 05/21/2018 Item Description Service call on Simplex fire panel Check 116768 Date Paid: 05/31/2018 Inv. 180524 05/24/2018 Item Description May 2018 - Afterschool Programs Check 116769 Date Paid: 05/31/2018 Inv. 082530053 04/30/2018 SHI International Corp Amount: 30 Windows Remote Desktop Services Silent Knight Sec Sys Of MN In Amount: IC Service call on Simplex fire panel/replaced 2 batteries Sports Unlimited Amount May'18 - Lax (13), Sampler (9), Soccer (19) Afterschool Programs SRF Consulting Group, Inc. Amount Prof Sery thru 4.30.18, Proj No 16001, Vicksburg Ln Reconstruct Item Description Amount is based on estimation of engineering services needed. Inv. 101890012 03/31/2018 Prof Sery thru 3.31.18 Proj No 5122 CSAH 24 Improvements Item Description Approved by the Council on Jan. 24, 2017 Page 27 of 30 Total Price $728.97 Total Price $640.62 Total Price $725.58 $2,580.00 Total Price $2,580.00 $208.00 Total Price $208.00 $1,804.00 Total Price $1,804.00 $3,055.98 Total Price $475.88 Total Price $131.91 Page6�&018 Inv. 101890013 04/30/2018 Prof Sery thru 4.30.18 Proj No 5122 CSAH 24 Improvements Item Description Total Price Approved by the Council on Jan. 24, 2017 $2,081.39 Inv. 10728004 03/31/2018 Prof Sery thru 3.31.18 FYA Phase 4 Item Description Total Price $366.80 Check 116770 Date Paid: 05/31/2018 Stevens Engineers Amount: $2,549.00 Inv. 11490 05/29/2018 4.22/5.19.18 Prof Sery IC Proj No 900-16-266 Pumps & controls Item Description Total Price Ice Center Improvements - Engineer services for pumps & controls $2,549.00 Check 116771 Date Paid: 05/31/2018 Streicher's Inc. Amount: $529.98 Inv. 11315147 05/18/2018 1 TAC blk w/pkts, 1 XX -LG negotiator jacket -E Jacobson Item Description 1 TAC blk w/pkts, 1 XX -LG negotiator jacket -E Jacobson Inv. 11315168 05/18/2018 1 TAC blk w/pkts, 1 Small negotiator jacket -H Ohl Item Description 1 TAC blk w/pkts, 1 Small negotiator jacket -H Ohl Inv. 11316046 05/25/2018 2 Wingman patrol/investigative scene bags - Investigations Item Description 2 Wingman patrol/investigative scene bags - Investigations Check 116772 Date Paid: 05/31/2018 Superior Brookdale Ford Inv. 559801 04/16/2018 Wheel alignment, vehicle #1044 Item Description Wheel alignment, vehicle #1044 Check 116773 Date Paid: 05/31/2018 Sympro Inc. Inv. 10474 05/08/2018 Sympro Maintenance Contract Item Description Sympro Maintenance Contract 7/1/18- 6/30/19 Check 116774 Date Paid: 05/31/2018 Taho Sportswear Inc. Inv. 18TF0794 04/20/2018 4 polo Staff shirts, 1 Eddie Bauer staff jacket Item Description Staff shirts and apparel Staff shirts and apparel Check 116775 Date Paid: 05/31/2018 Towmaster Inc. Inv. 403871 05/08/2018 2-12 volt valve solenoid Item Description Various Parts 2018 Check 116776 Date Paid: 05/31/2018 Universal Athletic Service Inc. Inv. 1501008391 05/08/2018 lea Referee shirt Item Description lea Referee shirt Check 116777 Date Paid: 05/31/2018 Valley Rich Co Inc. Inv. 25466 04/20/2018 Water break repair, 2700 Fountain Ln Item Description Water break repair, 2700 Fountain Inv. 25489 05/04/2018 Water break repair - 5535 Hwy 169 Service Rd Item Description Water break 5535 169 service Rd #25489 Inv. 25517 04/17/2018 Water break repair/midnight dig - 13th Ave/Black Oaks Rd Item Description Page 28 of 30 Total Price $175.00 Total Price $175.00 Total Price $179.98 Amount: $97.26 Total Price $97.26 Amount: $10,007.24 Total Price $10,007.24 Amount: $202.00 Total Price $137.25 $64.75 Amount: $172.88 Total Price $172.88 Amount: $24.99 Total Price $24.99 Amount: $13,444.80 Total Price $2,854.00 Total Price $2,854.00 Total Price Page6*018 13th Ave & Black Oaks Water break (midnight dig) # 25517 $7,736.80 Total Price Check 116778 Date Paid: 05/31/2018 Viking Trophies Amount: Check 116783 Date Paid: 05/31/2018 $174.00 Inv. 134776 05/29/2018 60-2" Gold baseball 3-D Medal w/neck ribbon Inv. 51509749550518 05/22/2018 4.2/5.17.18 Elm Crk conc, plyflds, Pavillion Item Description Item Description Total Price Total Price 60-2" Gold baseball 3-D Medal w/neck ribbon $8,637.60 $174.00 4.1/5.16.18 FS1, PW, FS2, IC Check 116779 Date Paid: 05/31/2018 The Watson Company Amount: $234.28 Inv. 887473 05/10/2018 IC Concession food resupply $470.80 Item Description Total Price 4.2/5.1.18 FS2 electric Open PO -Concession Resale $451.97 $234.28 Check 116780 Date Paid: 05/31/2018 Weissman's Theatrical Supply Inc. Amount: ASL Interpreting Services, Inc. $9.65 Inv. 184308902 04/05/2018 1 XSSC lemon costume piece Rhodan Hendricks -Home Visit - 4/27/18 Item Description Total Price Invoice #18.14913 - Rhodan Hendricks Costume Order $120.00 $9.65 Michael Furman Check 116781 Date Paid: 05/31/2018 Westside Wholesale Tire Inc. Amount: $1,707.43 Inv. 359571 05/24/2018 9 245/55WRl8 FS Firehawk tires Total Price Item Description Total Price Check 116786 Date Paid: 05/31/2018 Various Tire Purchases Amount: $200.00 $386.36 1-8 zone Rachio 3 smart sprinkler controller Various Tire Purchases Item Description $791.20 Inv. 811793 05/25/2018 1-19.51-24/12 Galaxy EZ tire, 1 Liquid air tire valve Rebate Funds $200.00 Item Description Various Tire Purchases Check 116782 Date Paid: 05/31/2018 Inv. 1804133 04/13/2018 WSB & Associates Mar'18 Prof Serv, Proj No R01141700, 15th/Pineview Utility Imp Total Price $529.87 Amount: $6,215.50 Item Description Total Price Mar'18 Prof Serv, Proj No R01141700, 15th/Pineview Utility Imp $6,215.50 Check 116783 Date Paid: 05/31/2018 Xcel Energy Amount: $34,371.56 Inv. 51509749550518 05/22/2018 4.2/5.17.18 Elm Crk conc, plyflds, Pavillion Item Description Total Price 4.2/5.17.18 Elm Crk conc, plyflds, Pavillion $8,637.60 Inv. 51671079400518 05/24/2018 4.1/5.16.18 FS1, PW, FS2, IC Item Description Total Price 4.2/5.1.18 FS1 electric $470.80 4.1/4.30.18 PW electric $3,586.06 4.2/5.1.18 FS2 electric $451.97 4.17/5.16.18 IC electric $21,225.13 Check 116784 Date Paid: 05/31/2018 ASL Interpreting Services, Inc. Amount: $120.00 Inv. 1814913 05/07/2018 Rhodan Hendricks -Home Visit - 4/27/18 Item Description Total Price Invoice #18.14913 - Rhodan Hendricks -Home Visit - 4/27/18 $120.00 Check 116785 Date Paid: 05/31/2018 Michael Furman Amount: $59.95 Inv. 180510 05/10/2018 Irrigation Repair Item Description Total Price Irrigation Repair $59.95 Check 116786 Date Paid: 05/31/2018 Bryan Hadoff Amount: $200.00 Inv. 19251 05/18/2018 1-8 zone Rachio 3 smart sprinkler controller Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $200.00 Check 116787 Date Paid: 05/31/2018 Joel LaFrance Amount: $100.00 Inv. 8346652 05/21/2018 1-6" Hunter regulated 40 PSI sprinkler Item Description Total Price Water Efficiency Rebate Program - Rebate Funds $100.00 Check 116788 Date Paid: 05/31/2018 Perfection Plus, Inc. Amount: $1,727.40 Inv. 1128697 05/01/2018 2018 Janitorial services -All buildings Page 29 of 30 Page6412018 Item Description 2018 Janitorial Services - CH April 18 - Janitorial Svcs - PS April 2018 Janitorial Svcs - PW April 2018 Janitorial Svcs - CWP April 2018 Janitorial Svcs - ZWP April 2018 Janitorial Svcs - F1 April 2018 Janitorial Svcs - Fire 2 April 2018 Janitorial Svcs - F3 April 2018 Janitorial Svcs - St73 April 2018 Janitorial Svcs - Reserve April 2018 Janitorial Svcs - PCC Check 116789 Date Paid: 05/31/2018 Inv. 180529 05/24/2018 Item Description 5.21/5.24.18 FEMA Class - Edina Check 116790 Date Paid: 05/31/2018 Inv. 180529 05/24/2018 Item Description 5.21/5.24.18 FEMA Class - Edina Check 116791 Date Paid: 05/31/2018 Inv. 180525 05/22/2018 Andy Etzel 5.21/5.24.18 FEMA Class - Edina Thomas Evenson 5.21/5.24.18 FEMA Class - Edina Nur Kasin 5.14.18 STA Mtg, 5.22.18 TAM Mtg mileage reimbursement Item Description 5.14.18 STA Mtg, 5.22.18 TAM Mtg mileage reimbursement Check 116792 Date Paid: 05/31/2018 Law Enforce Labor Serv./Union Inv. 2018-00000132 05/25/2018 DUES POL - Police Union Dues Item Description 05/25/2018 Deduction Police Union Dues 05/25/2018 Deduction Police Union Fair Share 05/25/2018 Deduction SGT Union Dues Check 116793 Date Paid: 05/31/2018 Mckayla Murphy Inv. 577340 04/28/2018 1 Orange dissolve leotard Item Description 1 Orange dissolve leotard Total Payments: 239 Total Price $293.33 $293.33 $81.16 $81.16 $81.18 $111.27 $111.21 $111.24 $38.14 $38.17 $487.21 Amount: $64.00 Total Price $64.00 Amount: $64.00 Total Price $64.00 Amount: $36.41 Total Price $36.41 Amount: $1,745.66 Total Price $1,323.00 $104.16 $318.50 Amount: Total Price $56.99 Total Amount Paid: $2,004,035.44 $56.99 Page 30 of 30 Page6018 City of log. Check Payment Register - UB Refunds 05/23/2018 to 06/02/2018 Check 116524 Date Paid: 05/24/2018 JASON ANDERSON SALYERS 05/24/2018 Refund 05/24/2018 Overpayment - final account refund Check 116525 Date Paid: 05/24/2018 AUGUSTO ANDRADE Check 116533 Refund 05/24/2018 Overpayment - final account refund Check 116526 Date Paid: 05/24/2018 DIANE BALAGNA Date Paid: 05/24/2018 Refund 05/24/2018 Overpayment - final account refund Check 116527 Date Paid: 05/24/2018 KRISTI BERGSTROM Refund Refund 05/24/2018 Overpayment - final account refund Check 116528 Date Paid: 05/24/2018 ROBERT BURNS Check Refund 05/24/2018 Overpayment - final account refund Check 116529 Date Paid: 05/24/2018 LOUISE BURTON Refund 05/24/2018 Overpayment - final account refund Check 116530 Date Paid: 05/24/2018 GREGORY BUSCHMANN Refund 05/24/2018 Overpayment - final account refund Check 116531 Date Paid: 05/24/2018 ANDREW CURRAN Refund 05/24/2018 Overpayment - final account refund Check 116532 Date Paid: 05/24/2018 MICHAEL EVANS Refund 05/24/2018 Overpayment - final account refund Check 116533 Date Paid: 05/24/2018 BRADY FLIES Refund 05/24/2018 Overpayment - final account refund Check 116534 Date Paid: 05/24/2018 Refund Refund 05/24/2018 Check 116535 Date Paid: 05/24/2018 Refund Refund 05/24/2018 Check 116536 Date Paid: 05/24/2018 Refund Refund 05/24/2018 Check 116537 Date Paid: 05/24/2018 Refund 05/24/2018 Check 116538 Date Paid: 05/24/2018 Refund 05/24/2018 Check 116539 Date Paid: 05/24/2018 Refund 05/24/2018 Check 116540 Date Paid: 05/24/2018 Refund 05/24/2018 Check 116541 Date Paid: 05/24/2018 Refund 05/24/2018 Check 116542 Date Paid: 05/24/2018 Refund 05/24/2018 SHERI FRICK Overpayment - final account refund JOHN HAMRE Overpayment - final account refund HANSON BUILDERS INC Overpayment - final account refund WILLIAM HATHAWAY Overpayment - final account refund PATRICK HOFKES Overpayment - final account refund TODD HOLLANDS Overpayment - final account refund LEROY HOUDESHELL Overpayment - final account refund DIANE JOHNSON Overpayment - final account refund STEVEN KERRICK Overpayment - final account refund Check 116543 Date Paid: 05/24/2018 WENJIE LIU Refund 05/24/2018 Overpayment - final account refund Check 116544 Date Paid: 05/24/2018 SCOTT MACHUT Refund 05/24/2018 Overpayment - final account refund Check 116545 Date Paid: 05/24/2018 STEVEN MILLER Refund 05/24/2018 Overpayment - final account refund Check 116546 Date Paid: 05/24/2018 DAVID MONTEBELLO Amount: $102.54 Amount: $29.89 Amount: $94.73 Amount: $42.34 Amount: $99.42 Amount: $33.18 Amount: $51.71 Amount: $29.32 Amount: $42.63 Amount: $47.37 Amount: $6.35 Amount: $57.34 Amount: $34.97 Amount: $74.02 Amount: $16.88 Amount: $85.02 Amount: $29.87 Amount: $91.86 Amount: $54.01 Amount: $6.87 Amount: $78.65 Amount: $17.65 Amount: $87.04 Page 1 of 2 Page 4/2018 Total Refunds: 35 Total Amount Paid: $1,765.49 Page 2 of 2 Page 4A4/2018 Refund 05/24/2018 Overpayment - final account refund Check 116547 Date Paid: 05/24/2018 WENDY NEGO Amount: $96.26 Refund 05/24/2018 Overpayment - final account refund Check 116548 Date Paid: 05/24/2018 ALEKSANDR OSOSKOV Amount: $42.55 Refund 05/24/2018 Overpayment - final account refund Check 116549 Date Paid: 05/24/2018 JEFFREY PFLIPSEN Amount: $22.07 Refund 05/24/2018 Overpayment - final account refund Check 116550 Date Paid: 05/24/2018 WAYNE SHELLENBERG Amount: $21.69 Refund 05/24/2018 Overpayment - final account refund Check 116551 Date Paid: 05/24/2018 DEE ANN SMITH Amount: $73.76 Refund 05/24/2018 Overpayment - final account refund Check 116552 Date Paid: 05/24/2018 CRAIG SPENCER Amount: $6.08 Refund 05/24/2018 Overpayment - final account refund Check 116553 Date Paid: 05/24/2018 KRISTEN SVENDAHL Amount: $5.50 Refund 05/24/2018 Overpayment - final account refund Check 116554 Date Paid: 05/24/2018 BRADFORD TAYLOR Amount: $26.78 Refund 05/24/2018 Overpayment - final account refund Check 116555 Date Paid: 05/24/2018 ANNALEE VANASSE LUTGEN Amount: $21.30 Refund 05/24/2018 Overpayment - final account refund Check 116556 Date Paid: 05/24/2018 JOHN WINGES Amount: $106.20 Refund 05/24/2018 Overpayment - final account refund Check 116557 Date Paid: 05/24/2018 XUEQING YUAN Amount: $119.71 Refund 05/24/2018 Overpayment - final account refund Check 116558 Date Paid: 05/24/2018 THERESA ZYUZIN Amount: $9.93 Refund 05/24/2018 Overpayment - final account refund Total Refunds: 35 Total Amount Paid: $1,765.49 Page 2 of 2 Page 4A4/2018 6/4/18 H.M.S. for Windows - Housing Assistance Payments Page: 0001 8:01:51 AM PAYMENT REGISTER -SUMMARY Q:U-1vrS\REPORTS\PAYSUM.QRP Bank Account Description/Account Number 104791546468 Number Date Method Status Name Of Payee Total 0010492 5/15/18 Computer Ck. Paid Heartland -Plymouth LkVwCommons $1,412.00 0010493 5/15/18 Computer Ck. Paid Plymouth West View Estates LLC $521.00 0010494 5/15/18 Computer Ck. Paid Metropolitan Council - HRA $1,272.00 0010495 5/15/18 Computer Ck. Paid Minneapolis Public Housing Authority $959.03 0010496 5/29/18 Computer Ck. Paid Plymouth West View Estates LLC $453.00 0010497 5/29/18 Computer Ck. Void Minneapolis Public Housing Authority $0.00 0010498 6/1/18 Computer Ck. Paid Summer Creek $659.00 0010499 6/1/18 Computer Ck. Paid Melair Associates/At The Lake Apartments $14,436.00 0010500 6/1/18 Computer Ck. Paid Vladimir Begun $665.00 0010501 6/1/18 Computer Ck. Paid Bigos Willow Creek $9,855.00 0010502 6/1/18 Computer Ck. Paid Bigos-Oakwood LLC $884.00 0010503 6/1/18 Computer Ck. Paid Gary Boster $660.00 0010504 6/1/18 Computer Ck. Paid Richard Cederstrom $850.00 0010505 6/1/18 Computer Ck. Paid Currents $8,358.00 0010506 6/1/18 Computer Ck. Paid DNT Investment LLC $1,602.00 0010507 6/1/18 Computer Ck. Paid Esso Properties, LLC $744.00 0010508 6/1/18 Computer Ck. Paid Fernbrook Townhomes $375.00 0010509 6/1/18 Computer Ck. Paid Four Seasons Estates $8,680.00 0010510 6/1/18 Computer Ck. Paid Granite Woods - Minneapolis LLC $2,040.00 0010511 6/1/18 Computer Ck. Paid Great Locations, LLC. $809.00 0010512 6/1/18 Computer Ck. Paid Andrew Heal $785.00 0010513 6/1/18 Computer Ck. Paid Heartland -Plymouth LkVwCommons $0.00 0016514 6/1/18 Computer Ck. Paid Heartland -Plymouth LkVwCommons $37,611.00 0010515 6/1/18 Computer Ck. Paid Elena & Boris Iliarski $680.00 0010516 6/1/18 Computer Ck. Paid Barbie Jo Kalash $688.00 0010517 6/1/18 Computer Ck. Paid Gennadiy Kharam $540.00 0010518 6/1/18 Computer Ck. Paid Lancaster Village Partnership $16,007.00 0010519 6/1/18 Computer Ck. Paid XiaoYan Liu $840.00 0010520 6/1/18 Computer Ck. Paid Maksud Mahbub $1,222.00 0010521 6/1/18 Computer Ck. Paid Joan M. Michaud $611.00 0010522 6/1/18 Computer Ck. Paid Parkside Apartments $2,563.00 0010523 6/1/18 Computer Ck. Paid Peace Properties LLC $2,169.00 0010524 6/1/18 Computer Ck. Paid Plymouth Colony Apartments $14,060.00 0010525 6/1/18 Computer Ck. Paid Plymouth Ponds Ltd Partnership $9,747.00 0010526 6/1/18 Computer Ck. Paid Plymouth West View Estates LLC $17,254.00 0010527 6/1/18 Computer Ck. Paid Shenandoah Woods Apartments $13,924.00 0010528 6/1/18 Computer Ck. Paid Gopal B Shenoy $1,860.00 0010529 6/1/18 Computer Ck. Paid Rebecca Simonton $0.00 0010530 6/1/18 Computer Ck. Paid Plymouth Leased Housing Assoc $10,830.00 0010531 6/1/18 Computer Ck. Paid Narayanan Sundaresan $1,063.00 0010532 6/1/18 Computer Ck. Paid The Axis $8,740.00 0010533 6/1/18 Computer Ck. Paid Vicksburg Crossing $1,690.00 0010534 6/1/18 Computer Ck. Paid Vicksburg Commons $8,859.00 0010535 6/1/18 Computer Ck. Paid Mark Warren $509.00 0010536 6/1/18 Computer Ck. Paid Wellington Apartments $1,376.00 0010537 6/1/18 Computer Ck. Paid Chongbin Wu $1,295.00 0010538 6/1/18 Computer Ck. Paid Xiang Zhan $1,346.00 0010539 6/1/18 Computer Ck. Paid David Zhao $804.00 0010540 6/1/18 Computer Ck. Paid Bloomington HRA $668.90 0010541 6/1/18 Computer Ck. Paid Metropolitan Council - HRA $4,201.40 0010542 6/1/18 Computer Ck. Paid Minneapolis Public Housing Authority $2,445.70 0010543 6/1/18 Computer Ck. Paid Richfield HRA $1,140.90 0010544 6/1/18 Computer Ck. Paid Southeast MN Multi County HRA $596.52 Page 3 5 6/4/18 8:01:51 AM 0010545 0010546 0010547 0010548 0010549 0010550 0010551 0010552 H.M.S. for Windows - Housing Assistance Payments PAYMENT REGISTER -SUMMARY 6/1/18 Computer Ck. Paid St. Cloud HRA 6/1/18 Computer Ck. Paid St. Louis Parlc Housing Authority 6/1/18 Computer Ck. Paid 6/1/18 Computer Ck. Paid 6/1/18 Computer Ck. Paid 6/1/18 Computer Ck. Paid -- 6/1/18 Computer Ck. Paid 6/1/18 Computer Ck. Paid Page: 0002 Q:1HMSIREPORTSIPAYSUM.QRP $1,834.56 $1,776.70 $113.00 $113.00 $35.00 $62.00 $146.00 $11.00 Total For Bank Account $225,451.71 # Of Transactions Totals Computer Checks 368 $225,451.71 Manual Checks 0 $0.00 Direct Deposits 0 $0.00 Debit Cards 0 $0.00 Total For Bank: $225,451.71 Total - All Bank Accounts Printed: $225,451.71 Page 36 CITY OF PLYMOUTH RESOLUTION NO. 2018 - RESOLUTION APPROVING DISBURSEMENTS ENDING JUNE 2, 2018 WHEREAS, a list of disbursements for the period ending June 2, 2018 was presented to the City Council for approval. NOW, THEREFORE, BE IT HEREBY RESOLVED BYTHE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA that the payment of the list of disbursements of the following funds is approved. US Bank — Check Register General & Special Revenue $ 513,705.91 Construction & Debt Service $ 178,861.75 Enterprise & Internal Service $ 1,309,409.36 Housing Redevelopment $ 765.21 Check Register Total $ 2,002,742.23 US Bank — Housing Assistance Payments Housing & Redevelopment Authority $ 225,451.71 $ 225,451.71 GRAND TOTAL FOR ALL FUNDS $ 2,228,193.94 APPROVED by the City Council on this 12th day of June, 2018. Page 37 rp City of Plymouth Adding Quality to Life REGULAR COUNCIL MEETING June 12, 2018 Agenda 6.03 Number: To: Dave Callister, City Manager Prepared by: Michael Reed, Police Captain Reviewed by: Michael Goldstein, Director of Public Safety Item: Accept Community Partnership Grant from CenterPoint Energy 1. ACTION REQUESTED: Adopt attached resolution accepting the awarded Community Partnership Grant from CenterPoint Energy. 2. BACKGROUND: CenterPoint Energy annually awards community partnership grants up to $2,500 to cities served by their company for the purchase of safety and emergency response equipment. The City was awarded a $2,000 matching grant. This grant will be used to purchase two mobile traffic control safety signs. 3. BUDGET IMPACT: The required match for the grant award is reserved in the police budget. 4. ATTACHMENTS: Resolution Page 1 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION ACCEPTING COMMUNITY PARTNERSHIP GRANT FROM CENTERPOINT ENERGY WHEREAS, cities can apply annually for this Community Partnership Grant from CenterPoint Energy up to a maximum of $2,500; and WHEREAS, the grant requires a dollar for dollar match by the cities; and WHEREAS, the Police Department applied for a grant to purchase two mobile traffic control safety signs; and WHEREAS, the City of Plymouth has been awarded a $2,000 community Partnership Grant from CenterPoint Energy for the purchase of this safety equipment; and WHEREAS, the required match for this grant is in the police budget. NOW, THEREFORE, BE IT HEREBY RESOLVED BYTHE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA that the CenterPoint Energy's Community Partnership Grant in the amount of $2,000 for the purchase of two mobile traffic control safety signs is accepted. APPROVED by the City Council on this 12th day of June, 2018. Page 2 rp City of Plymouth Adding Quality to Life To: REGULAR COUNCIL MEETING Prepared by: June 12, 2018 Reviewed by: Item: Agenda 6 m 04 Number: Dave Callister, City Manager Derek Asche, Water Resources Manager Michael Thompson, Director of Public Works Approve Wetland Replacement Plan Application for the Kilmer Lane Street Reconstruction Project (189001.001) 1. ACTION REQUESTED: Adopt attached resolution approving the wetland replacement plan application for the Kilmer Lane Street Reconstruction Project (189001.001). 2. BACKGROUND: The Kilmer Park Street Reconstruction Project, City Project No. ST189001.001, includes the streets surrounding Kilmer Park and generally includes the streets from 26th Avenue to, and including, 28th Avenue and from Highway 169 Frontage Road to and including Pilgrim Lane. Also proposed with this project are drainage and water quality improvements including drainage channel stabilization, improved storm sewer system to reduce the potential for flooding, and underground storage systems to capture sediment and nutrients and improve downstream water quality. Wetland impacts total 9,406 square feet or (0.22 acre). In addition, approximately 2,400 linear feet of ditched drainage way is proposed to be impacted. The impacts to the water resources are the result of a combination stream stabilization associated with the water quality improvements, and storm sewer improvements/ditch grading. The wetland replacement plan application was submitted to all required regulatory agencies per State of Minnesota Wetland Conservation Act (WCA) Rules on May 16, 2018 and information regarding additional impacts to ditches and a small wetland were forwarded on June 1, 2018. The United States Army Corps of Engineers may also need to approve impacts and staff is currently working directly with the Corps for those approvals. Wetland mitigation is summarized according to the following table: Page 1 3. BUDGET IMPACT: The Kilmer Park Street Reconstruction Project is included in the 2018-2022 Capital Improvement Program at an estimated cost of $4,140,000.00 which includes $1,500,000.00 from the Water Resources Budget for the storm sewer, drainage, and water quality improvements. The total estimated project cost of the Kilmer Park Street Reconstruction is $2,748,666.35 including $1,252,095.33 from the Water Resources Fund for storm sewer, drainage, and water quality improvements. Approximate funding in the amount of $25,500.00 for wetland mitigation shall be from the Water Resources Fund. 4. ATTACHMENTS: Location Map Wetland Impact Map — South and East Channels Wetland Impact Map— North Channel Resolution Page 2 Impacted WCA Area Required (square Replacement U to feet) Credit at 2:1 CL E ratio (square c feet) L E Wetland A 871 1,742 E Wetland B 871 1,742 Wetland C 871 1,742 Wetland D 1,307 2,614 Wetland E 261 522 Wetland F 217 434 Wetland 9 305 610 Total 4,703 9,406 y Notes: Wetland Bank c v Wetland Credit Purchase: 9,406 #1643 L E U E ro E a cn 3. BUDGET IMPACT: The Kilmer Park Street Reconstruction Project is included in the 2018-2022 Capital Improvement Program at an estimated cost of $4,140,000.00 which includes $1,500,000.00 from the Water Resources Budget for the storm sewer, drainage, and water quality improvements. The total estimated project cost of the Kilmer Park Street Reconstruction is $2,748,666.35 including $1,252,095.33 from the Water Resources Fund for storm sewer, drainage, and water quality improvements. Approximate funding in the amount of $25,500.00 for wetland mitigation shall be from the Water Resources Fund. 4. ATTACHMENTS: Location Map Wetland Impact Map — South and East Channels Wetland Impact Map— North Channel Resolution Page 2 Location Map — Kilmer Park Street Reconstruction Page 3 J J I `a 2eTH AVF_ N MC x � 169 E9 a J 2 �y rM m v n rM rn a 0 M _.. 26TH AVE N — 2015 6lr99k Reconstruction + Kilmer Park - ST189001_001 Plymouth .A'+.9 •<�w�u.iae..�nra�a a. uno.ranuw ma s-.rtn .•an uc nmw x�ww.Mn xW L7 Y I { 7CC f ceL Prajects Page 3 Henn+'pin J. ffer. r r.,w�wnPr.lr..m.Ro r.na s+nnrr,n... rwrx.s y,V in RPr : tl]+val r Ma sa.c»� Henna xrm•.c. r-ey o, Py.e..m uws nscs.+nncea !. Owramerwma•r.+W Y i0r � a.:�nmer. trnn,vc c rcmeeuwn aro wiwr.! rn aecemw to mu, ++ ncuw•r�.+n:ranl�r •.reins=cmee neueeri +cVvn.n :anti 1pnn ped rq�nlr. mn p^, wnrlc amr pnw,J n rn� ynv Ha+� r+n r.rnrru• r n prey � A m P «era Legena MWelland Investfgatlon Limit A culvesl • Sample Point Field Delineated Wetland Field Delienated Waterway Tt Elevation Contour National Hydrography Doloset r r P9 rennia151rearn Intermittent Stream 0:1 Walerbody • M,ld Collected data [•wn1Y ;��; City of r+iyrnaurn IGImerPalk Streal ROC cnStIUClion PrOfOCI Wavand Dulinualimn r aw-r i•xn*.n lgyM al nrN,,xyr,f7a Mpyrp pyq an p013�r0 o� n.lmwm He Mca ew... gy J�• P+7JI0.0.-gyp .n.tn. rRH e. Mpnr le.{.w�mP�. Mae" K 75 n / j1 Feel ,. mrpnmenc �.,.r vae era:.rr (3 Stantec L �5DRAFT dw Legend = Wetland Investigation Limit Yk Field Collected Data I., Hennepin 15 �r R t ,ell City of Plymouth Kilmer Park Street Reconstruction Project b b Field Delineated Wetland L �5DRAFT Mrr o Legend = Wetland Investigation Limit Yk Field Collected Data I., Hennepin A Culvert Ckn1/M1pIp4•l t 0 Sample Point City of Plymouth Kilmer Park Street Reconstruction Project b b Field Delineated Wetland Welland Delineation f f Feld Delineated Waterway 19370"1 SS 19N. R=W,$74. MPIr 1by mmPon x0140-30 ?tt Elevation Contour C. W FV—Ih, rachnfcd ft".by cn m ]01405]0 l_PbCa„MN bdep�rWnlRrMw W�lr On x0lBae-�� K.U. 1.Co X—fs syv— WD 1993 SIdrePbn. National Hydrography Dataset N South RPS nM rp,l 0 W 100 2 D,l, SOWC4IF JutlR: 5lrnroc. Cay d M,,m Ilh. NAM. ^� Perennial Stream Fe I IS.—G_ FSG ,XQ Irn a1p'+ral d,cwne�r ae d a.sx I II 3 OrlhoPhdopraonr. NNP ]GI x Dk,U—". Srml« ,IWTGI M IeSP,rl{bttY kr ddl6 vppred in Necharli� Irnmdr- Th i .jOipnl GCCMI'" fRlO,nJWNy 4r w Forg IhR _-and c,mObre 011M ary0. Iho rdclyknl r,k_,Slonlx.ir,k_ Intermittent Stream Waterbody tantee (3 e VWb G,nl,-%d1d W-1 li, , V.r alckF, 00*lg ho hay rlmrl M cwlk l a Prov Won d IM dor,. POgC I r CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION APPROVING THE WETLAND REPLACEMENT PLAN FOR THE KILMER PARK STREET RECONSTRUCTION PROJECT (ST1 89001.001) WHEREAS, the Kilmer Park Street Reconstruction Project includes drainage and water quality improvements including drainage channel stabilization, improved storm sewer system to reduce the potential for flooding, and underground storage systems to capture sediment and nutrients to improve downstream water quality; and WHEREAS, the City of Plymouth proposes wetland impacts associated with the Kilmer Park Street Reconstruction Project to make drainage and water quality improvements; and WHEREAS, a replacement plan application was prepared replacing wetlands as required by the Wetland Conservation Act (WCA); and Act. WHEREAS, the replacement plan meets the requirements of the Wetland Conservation NOW, THEREFORE BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that: 1. The wetland replacement plan for the Kilmer Park Street Reconstruction Project (ST189001.001) is approved. 2. Funding shall be from the Water Resources Fund. APPROVED by the City Council on this 12th day of June, 2018. Page 6 rp City of Plymouth Adding Quality to Life To: REGULAR COUNCIL MEETING Prepared by: June 12, 2018 Reviewed by: Item: Agenda 6■05 Number: Dave Callister, City Manager Mike Payne, Assistant City Engineer Michael Thompson, Director of Public Works Award Contract for 2019 Mill and Overlay Utility Maintenance Project (ST199004.001) 1. ACTION REQUESTED: Adopt attached resolution awarding the contract for the 2019 Mill and Overlay Utility Maintenance Project (ST199004.001). 2. BACKGROUND: The 2018 — 2022 Capital Improvement Program (CIP) includes streets to be edge milled and overlaid. A mill and overlay project includes milling the edges of the streets and applying a new layer of asphalt over the entire roadway which should provide another 10 to 15 years of service life before needing another similar project. In preparation of a mill and overlay preventative maintenance is performed in the project area the year prior to the scheduled mill and overlay. Preventative maintenance work includes installing infiltration and inflow (I&I) barriers on sanitary sewer manholes, catch basin repairs, water main valve repairs, installing concrete pedestrian ramps where necessary to comply with the Americans with Disabilities Act, and replacing a minimal amount of curb and gutter in extremely poor condition. The work done as preventative maintenance is not proposed to be assessed. The 2019 Mill and Overlay Utility Maintenance Project is one of two projects performing preventative maintenance in 2018 for areas scheduled for a mill and overlay project in 2019. The areas scheduled for a mill and overlay in 2019 include the neighborhoods east of Medicine Lake and the Plum Tree neighborhood as detailed in the attached area 1 and 2 maps. The work in these areas will include all of the preventative maintenance work previously listed with the exception of concrete replacement. A separate project will be bid later this summer to install pedestrian ramps and replace a minimal amount of curb and gutter. Repair of catch basins and storm manholes in the Sunset Hills area, as detailed in the attached area 3 map, is also included with the project. The Sunset Hills area is scheduled for a mill and overlay in 2018 and the preventative maintenance work will be completed prior to the overlay. On May 3, 2018 bids were publically opened for this project. A total of four bids were received at the following prices: Page 1 Contractor Total Bid New Look Contracting, Inc. $896,130.00 ASTECH $911,161.00 Dave Perkins Contracting $993,125.00 Kusske Construction Co. $1,146,174.00 Engineers Estimate $911,925.00 Engineering staff has reviewed the attached information submitted by New Look Contracting, Inc. out of Rogers, Minnesota, to comply with the bidder qualifications criteria policy, and finds the information acceptable. This company has completed the same type of project for the City of Brooklyn Park and a similar project for the City of Coon Rapids as a subcontractor. New Look Contracting has completed the 2018 Mill and Overlay Utility Maintenance — Water Main Project and other projects successfully for the City in the past as referenced in their submittals. Engineering staff feels that New Look Contracting, Inc. is capable of construction of the 2019 Mill and Overly Utility Maintenance Project in accordance with the specifications. If approved, this project is scheduled to begin in June and be completed in October. 3. BUDGET IMPACT: This project is one of two preventative maintenance projects in advance of mill and overlay projects scheduled for 2019 in the 2018 — 2022 CIP. The total estimated project cost of the 2019 Mill and Overlay Utility Maintenance Project is $940,936.50 which includes the preventative maintenance at $896,130.00 and 5% for design, administration, and contingencies at $44,806.50 and would be funded according to the below table. Funding Source Fund Amount Budgeted Street Reconstruction Fund Sewer Fund Water Fund $352,406.87 $170,965.63 $417,564.00 $1,920,000.00 $260,000.00 $500,000.00 Total Funding: $940,936.50 $2,680,000.00 4. ATTACHMENTS: Project Location Maps Bid Tabulation Resolution Page 2 Missic Hills 37TH AVEC Clifton E. French M z rngnm Lane 37TH AVE N I z Elementary I of � Seasons- adow Plymouth to 36TH PLN _J W MPAFED WTH ORGWUL SOURCE DOCUMENTS. 36THPL N K 36TH AVE N X r X Plymouth z 35TH p N Middle z School J Armstrong Plymouth W Senior High Playfield 2J School Ne 3P D 34T HAVE N D z 34TH AVE N 0 ��O Y 7- 0 32ND AVE N Y � S + F z a q - C9�� 31ST AVE N 30TH AVE N z 31 ST AVS N z 5�� Sunrise z J 0 yzj W � Z LU LU z Zg�1� j 29TH AVE N J z z 28TH AVE N D z z z z y PO Y J m z'A Kilmer d J a -Z 27Th/ a z 26TH AVE N r 4 1 Medicine Lake o, w C/4,, Q 25TH AVE ��et LSF a 23RD AVE N 0 N a 2019 Mill & Overlay Utility Maintenance Area 1 1,460 Feet Projects �V - THIS REPRESENTS A COMPILATION OF INFORMATION ANO DATA FROR GITV, COUNTY, STATE AND OTHER SOURCES THAT HAS NOT SEEN 21ST AVE w a z x 0 rn w J W 18TH -AVE I z W 17TH AVE N East d Medicine Lake r3 Tyq��N d Page 3 �r m � January, 2018 z -JCity of � UJ Plymouth _J k BE FIELD VERSED ] MPAFED WTH ORGWUL SOURCE DOCUMENTS. Page 3 Elm Creek M � N; Playrield Wayzata Senior High School z 48TH AVE N 4gTNgVgN pia 48TN CT z .p z ZA Q� 0 (7 ❑ i1Y! ❑ Vy0 b�G wgYSSF 9 01<1k ab�� z apo !� z Np y J y, a uiCL z r U w J Q 0 Z a 43RD AVE N m M Crooked Creek N 2019 Mill & Overlay Utility Maintenance Area 2 0l ' 620 Feet Projects THIS REPRESENTS A CWMATION OF INrORMATION AND BATA FROM CITY, COUNTY, STATE AND OTHER SOURCES TH AT HAS NOT BEEN rIELo V ERIrED.INFORMATION SHOULD SCHMIDT LAKE RD z N 487H PL N � a Z JB2) 12011) City of Plymouth Page 4 0 J26TH AVEN 7�AG O o a9 n 0. S o Z 24TH AVE N O O Z 1 a Z r� z Z z 2) O a a Z Z a �3.H p If 1A fl G 26TH AVEN z DO 25TH AVE N o z z 24TH AVE N zZ Z Hemlock Z x J Z Z 2 ¢ O mN ° x O 2 R } 23RD AVE N Y' West Medicine Lake Z Z J O Ilk � Z � o m r z m 2 v INI USTRIAL PARK BLVD e`\ ELI \ Q y Z CENT Z x� Y dip )WLER CiR N p G1� Or V4� <2 16TH AVE N 0, �SThAVF N Medicine 15TH AVEN 0e4 Z p -f. LARCH (NN `L = rn z Beacon Hidden 137 z Academy g x2VE" $ 12Ty SOQ z Z Lake 12TH AVEN Z z 12TH AVE N y °a v 2- 0 �° I 00 a �rPyE� o Oaicview 2° �° z w Pond ca x Z ,o Z 1� 11TH AVE South N �� Y w ��`H- Shore ILE cc N a Z C„yWgl'35 G x 1OTH AVE N Gleanloch � z 9TH AVS ° M! yWAI'Sg Y RESDEN RD N U w N Oy LU Sn' 02 a �z LLJ AF F- O E DR 4 w 0 F� WINDS a O CAilt-SON PKWY 61H AVE N b 5TH AVE N 5.�t{ AVEN p Z Z Tjy S 1y p qV La ompte V3 Tn o Q�@ r { �N I Playfieid 9ai Z O x Z eL�f m z` Oo y�UQsr Cavanaugh Z Ma �! Z N Z Lake ��,�P�. 3RD AVE ARD Z SVCS Z A1iF Z Z Z _ Ridgemount Z� N Z g County z n Playfield 3 J a Z ,n s us w a J Road 73 1ST AVEN 1ST AVEN o o Elementaill n Wayzata ,C0 3 m 2 r 0 r East Middle °¢ w > Z W -A School o - RIDGEM0UNT-AV E W Plymouth Minnetonka N 2019 Mill & Overlay Utility Maintenance May zois Area 3 0 t City of 1,640 Feet Projects Plymouth -- - THIS REPRESENTS ACOMPILATION OFINFORMATION AND pATA C®LINTY, I]OTHERSWRCES THAT HAS NOTI PEEN FIELp VEPIEIEp. WFORMATiON SHDULp BE FIELD VEPIFIEp AND COMPARED WITH ORIGINALS LIMEN Page 5 1,2PCity of Plymouth 2019 Mill & Overlay Utility Maintenance City Project ST199004.001 Bid Tabulation TOTAL SCHEDULE A I $ 591,086,50 NO ITEM SCHEDULE B: WATER MAIN _ TOTAL QUANTITY UNIT PRICE ENGINEERS ESTIMATE NEW LOOK CONTRACTING ASTECH DAVE PERKINS CONTRACTING KUSSKE CONSTRUCTION CO NO. ITEM SCHEDULE A: STORM & SANITARY SEWER UNIT TOTAL QUANTITY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 MOBILIZATION L.S. 1 S 19,000.00 $ 19,000.00 S 8.500.00 $ 8,600.00 $ 19040.00 $ 19,040.00 $ 10,004.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 2 TRAFFIC CONTROL L.S. 1 $ 15,000.00 $ 15,000.00 $ 8,500.00 $ 8,500.00 $ 7,590.00 $ 7,590.00 $ 5,504.00 $ 5,500.00 $ 7,245.00 $ 7,245.40 3 REMOVE & REPLACE RINGS- CATCH BASIN EACH 100 $ 1.150.00 $ 115000.00 S 1,600.00 $ 160,000.00 $ 1,232.60 $ 123.200.00 $ 750.00 $ 75.000,00 S 2.175.00 $ 217,500.00 4 REMOVE & REPLACE RINGS- STORM SEWER MANHOLE EACH 51 $ 700.00 $ 35,700.00 $ 650.00 $ 33,150.00 $ 786.50 $ 40,111.50 S 650.00 $ 33,150.00 S 1,060.00 $ 54,060.00 5 INSTALL MANHOLE SEALING SYSTEM EACH 172 $ 700.00 $ 120,400.00 $ 850.00 $ 148.200.00 $ 680.00 S 151.360.00 $ 850.00 $ 146,200.00 $ 1,120.00 $ 192,640.00 6 STORM STRUCTURE REPAIR HOUR 18 $ 375,00 $ 6,750,00 $ 500,00 $ 9,000.00 $ 385,00 $ 6,930.00 $ 275.00 $ 4,950,04 $ 210,00 $ 3780.00 7 SANITARY STRUCTURE REPAIR HOUR 3 $ 375.00 $ 1,125.00 S 500.00 $ 1.500.00 $ 385.00 S 1,155.00 $ 275.00 $ 825,04 $ 280.00 $ 840.00 8 BETUMINOUS PATCHING MIXTURE TON 572 $ 150.00 $ 65,800.00 S 40.0(3 $ 22.860.00 $ 159.50 S 91.234A0 $ 150.00 $ 85.80004 $ 147.00 $ 84,084.00 9 REMOVE & REPLACE CONCRETE CURB & GUTTER L.F. 500 $ 75.1)0 $ 37,500.00 $ 65.00 $ 32,500.00 $ 41.25 $ 29,625.00 $ 59.00 $ 29,500.00 $ 35.00 $ 17,500.00 10 HYDROSEEOING S.Y. 675 $ 10.00 $ 635000 1 S 3.00 $ 2.025.00 $ 17.60 $ 11,880.00 5 16.00 $ 10.80000 $ 12.50 $ 8,437.50 TOTAL SCHEDULE A I $ 591,086,50 NO ITEM SCHEDULE B: WATER MAIN UNIT TOTAL QUANTITY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 11 MOBILIZATION L.S. 1 $ 21,000.00 $ 21,000.00 $ 8,500.00 $ 8,500.00 $ 13,200.D0 $ 13,200.00 $ 1,504.00 $ 1,500.00 $ 5,000.00 $ 5,000.00 12 TRAFFIC CONTROL L-5. 1 $ 15,000 DO $ 15,ODO 00 $ 3,000.00 $ 3,000-00 $ 7,590,00 $ 7,590.00 $ 3,504-00 $ 3.500-00 $ 7,245.00 $ 7,245.00 13 WATER MAIN VALVE REPAIR EA 128 $ 2,000.00 $ 256,000.00 $ 2,600.00 $ 332,800.00 $ 1,760.00 $ 225,260.00 $ 3,200.00 3 409,600.00 $ 2,710.00 $ 346,680.00 14 REMOVE & REPLACE WATER MAIN VALVE EA 3 $ 4,000.00 $ 12,000.00 $ 4,500.00 $ 13.500.00 $ 4,950.00 $ 14,850.00 S 6,804.00 $ 20,400.00 $ 2,875.00 $ 6,625.00 15 BITUMINOUS PATCHING TON 472 $ 150.00 $ 74,800.00 $ 40.00 $ 18,880.00 $ 159.50 $ 75,284.00 $ 150.00 $ 70.60000 $ 147.00 $ 69384.00 16 1 REMOVE & REPLACE CONCRETE CURB & GUTTER L.F. 300 IS 60.00 1 $ 18,000.00 $ 65.00 $ 19,500.00 $ 49.50 $ 14.850.00 $ 59.00 $ 17,700.00 $ 35.00 S 10,500.00 17 HYDROSEEDING S.Y. 500 $ 10.00 $ 5.000.00 $ 3.00 $ 1,500.00 $ 17.60 $ 3,600.00 $ 16.00 $ 8,000,00 $ 12.50 $ 6.250.00 TOTAL SCHEDULE B 1 1 $ 397,800.08 8 397,660.08 $ 359,854.00 $ 531,500.04 8 453,884.00 NO. ITEM SCHEDULE C: SUNSET AREA UNIT TOTAL QUANTITY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1B MOBILIZATION L.S. 1 $ 3,000.00 $ 3,000.00 $ 8.500.00 $ 8.500.00 $ 6,720.00 $ 6,720.00 S 2,500.00 $ 2,500.00 $ 5,000.00 $ 5,000.40 19 TRAFFIC CONTROL L.S. 1 $ 3,000.60 $ 3060.00 S 1,650.00 $ 1.650.00 $ 1,100.00 $ 1,100.00 S 3.000.00 $ 3,000.00 $ 1,050.00 $ 1,050.00 20 REMOVE & REPLACE RINGS -CATCH BASIN EACH 30 $ 1,150.00 $ 34,500.00 $ 1._600,00 $ 48,000.00 $ 1,232,D0 $ 36,980.00 $ 750.00 $ 22,509.00 $ 2,175.00 $ 65,250.00 21 REMOVE & REPLACE RINGS -STORM SEWER MANHOLE EACH 7 $ 70000 $ 4,900.00 $ 650.00 $ 4,550.04 $ 880.00 $ 6.160.00 $ 750.00 $ 5,250.00 $ 1,060.00 $ 7,420.00 22 REMOVE & REPLACE CONCRETE CURB & GUTTER L.F. 100 $ 75.60 $ 7,500.00 $ 65.00 $ 6,500.00 $ 49.28 $ 4,925.00 S 59.00 $ 5,900.00 $ 35.00 $ 3,500.00 23 1 BITUMINOUS PATCHING MIXTURE TON 1 93 $ 150.00 1 $ 13,950001 $ 40.00 1 $ 3,720.00 1 $ 159.50 1 $ 14,833.501 $ 150.00 1 $ 13.950.04 1 $ 147.00 $ 13,671.00 24 IHYDROSEEDING S.Y. 1 425 1 $ 10.60 1 $ 4,250 00 1 $ 3.00 1 $ 1,275,00 1 $ 17.60 1 $ 7.48n On $ 15.00 1 $ 6,800.00 1 $ 12.50 $ 5,312.50 TOTAL SCHEDULE C $ 71,100.00 TOTAL SCHEDULES A. B, & C $ 911,92500 (Bids opened on May 3, 2016) _DENOTES ERROR IN BIO $ 74,195.09 $ 78,181.50 $ 59,900.00 S 101,203.50 8 896,130.00 $ 915.161.00 $ 993,125.001 $ 1,146,174.80 Page 6 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION AWARDING THE CONTRACT FOR THE 2019 MILL AND OVERLAY UTILITY MAINTENANCE PROJECT (ST199004.001) WHEREAS, pursuant to an advertisement for bids for the 2019 Mill and Overlay Utility Maintenance Utility Maintenance Project (ST199004.001), bids were received, opened, and tabulated according to State Law, and the following bids were received complying with the advertisement: Contractor Total Bid New Look Contracting, Inc. $896,130.00 ASTECH $911,161.00 Dave Perkins Contracting $993,125.00 Kusske Construction Co. $1,146,174.00 Engineers Estimate $911,925.00 WHEREAS, it appears that New Look Contracting, Inc. of Rogers, MN, is the lowest responsible bidder, complying with the minimum qualifications; and WHEREAS, the City Engineer recommends awarding the project to New Look Contracting, Inc. of Rogers, MN. NOW, THEREFORE, BE IT HEREBY RESOLVED BYTHE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA that the appropriate City Officials are hereby authorized and directed to enter into the contract for the bid with New Look Contracting, Inc. of Rogers, MN, in the name of the City of Plymouth for the 2019 Mill and Overlay Utility Maintenance Project (ST199004.001) in the amount of $896,130.00. FURTHERMORE, BE IT HEREBY RESOLVED, that the project would be funded from the Street Reconstruction Fund in the amount of $352,406.87, the Sewer Fund in the amount of $170,965.63, and the Water Fund in the amount of $417,564.00. APPROVED by the City Council on this 12th day of June, 2018. Page 7 rp City of Plymouth Adding Quo[ity to Life To: REGULAR COUNCIL MEETING Prepared by: June 12, 2018 Reviewed by: Item: Agenda 6.06 Number: Dave Callister, City Manager Mike Payne, Assistant City Engineer Michael Thompson, Director of Public Works Approve Acquisition of Permanent Easement for Street, Drainage, and Utility Purposes for State Highway 55 Frontage Road Reconstruction Project (13002) 1. ACTION REQUESTED: Adopt attached resolution approving acquisition of permanent easement for street, drainage, and utility purposes for the above referenced project. 2. BACKGROUND: On May 22, 2018 the City Council awarded the contract for the State Hwy 55 Frontage Road Reconstruction Project (13002). The project includes reconstruction of the Hwy 55 frontage road from West Medicine Lake Drive to South Shore Drive and realignment of the existing intersection at West Medicine Lake Drive. In order to reconstruct these improvements, additional street, drainage and utility easements are necessary over three parcels. Two parcels are on the west end of the project occupied by Mr. Car Wash (35-118-22-14-0004 and 35-118-22-14-0005) and the other parcel is on the east end of the project occupied by Plymouth Liquor (PID 36-118-22-23-0005). Negotiations to obtain the required easements have been ongoing since 2013. The easement for the parcel occupied by Plymouth Liquor was executed and approved by Council on March 27, 2018. Staff reached an agreement with the owner of the two remaining parcels occupied by Mr. Car Wash to obtain easement for the project and recently received the executed easement documents, which have been reviewed by the City Attorney. The City offered $60,728.00 to National Retail Properties, LP, for their dedication of the easement and also for the loss of driveway asphalt and trees. The easement area totaled 9,839 square feet as shown on the attached frontage road layout. This offer was based on the appraisal report prepared by the City's independent appraiser. The Owner has agreed to this offer, subject to City Council approval. 3. BUDGET IMPACT: This project is included in the 2018-2022 Capital Improvement Program at an estimated cost of $1,125,000. The total estimated project cost of the State Hwy 55 Frontage Road Reconstruction Project including easement acquisition is $1,037,444.04 as detailed in the below table. Page 1 Estimated Project Cost Street Reconstruction $715,056.70 Sanitary Sewer Repair $56,626.50 Easement Acquisition $88,856.00 Design, Administration, & Contingency $176,904.84 Total Estimated Cost: $1,037,444.04 The State Hwy 55 Frontage Road Reconstruction Project would be funded according to the below table. Funding Source Fund Amount Budgeted Special Assessments $101,595.27 $125,000.00 Street Reconstruction Fund $696,915.07 $710,000.00 Water Resources Fund $9,200.00 $30,000.00 Sewer Fund $58,351.50 $110,000.00 Water Fund $171,382.20 $150,000.00 Total Funding: $1,037,444.04 $1,125,000.00 4. ATTACHMENTS: Easement Layout Grant of Permanent Easement Documents Resolution Page 2 a a a s EX. TRAIL PROP. TRAI EXISTING 28' ROADWAY Q / cn m m 0 r 0 z m r m o m EX. SANITARY SEWER EASEMENT I 4;, PROPOSED CURB & GUTTER eir EASEMENT LEGEND: EASEMENT AREA: EASEMENT LINE 35-118-22-14-0004 0 EXISTING ROADWAY TOTAL — 7,273 FT 2 EXISTING ROADWAY — 3,935 FT OUTSIDE EXISTING ROADWAY OUTSIDE EXISTING ROADWAY — 3,338 FT 35-118-22-14-0005 • TOTAL — 2,566 FT • EXISTING ROADWAY — 2,296 FT • OUTSIDE EXISTING ROADWAY — 270 FT PROPERTY LINE COMBINED PARCELS • TOTAL — 9,839 FT 2 • EXISTING ROADWAY — 6,231 FT2 • OUTSIDE EXISTING — 5, brb r 1 2 35-118-22-14-0004 35-118-22-14-0005 11318 H WY 55 11310 H WY 55 . EX. ROADWAY eu/o a! PROPOSED ROAD, DRAINAGE, & UTILITY EASEMENT e/r EX. 30' ROAD EASEMENT e/r AIVDSO CAPIN VACUUMS O CONc. PAT/o � \ �� a�� a i � a HwY DNT-AGF RD MISTER CAR WASH N City of 11318 & 11310 H WY 55 1:30 Plymouth FRONTAGE ROAD LAYOUT Page �t —j GRANT OF PERMANENT EASEMENT NATIONAL RETAIL PROPERTIES, LP, a Delaware limited partnership, "Grantor", in consideration of One Dollar ($1.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, does hereby grant unto the CITY OF PLYMOUTH, a Minnesota municipal corporation, the Grantee, hereinafter referred to as the "City", its successors and assigns, forever, a permanent easement for public street, drainage and utility purposes over, on, across, under, and through the land situated in the County of Hennepin, State of Minnesota, as legally described on the attached Exhibit "A" and depicted on the attached Exhibit B. INCLUDING the rights of the City, its contractors, agents, servants, and assigns, to enter upon the permanent easement premises at all reasonable times to construct, reconstruct, inspect, repair, and maintain said public street, drainage and utility system over, across, on, under, and through the permanent easement premises, together with the right to grade, level, fill, drain, and excavate the permanent easement premises, and the further right to remove trees, bushes, undergrowth, and other obstructions interfering with the location, constriction, and maintenance of said public street, drainage and utility systems. The above named Grantor, for itself, its successors and assigns, does covenant with the City, its successors and assigns, that it is well seized in fee title of the above described easement 17075ov2 Page 4 premises; that it has the sole right to grant and convey the easement to the City and that there are no unrecorded interests in the easement parcel of which Grantor is a party s*d Ota+ it The City shall exercise its rights hereunder in a manner as to not unreasonably interfere with the business operations being conducted on Grantor's land. Once work commences in the Easement Area, the City shall diligently and continuously pursue to completion any installation, maintenance and/or repair of the facilities. Any damage to the parcel of Grantor or Grantor's tenant's shall be restored by the City to as good a condition as same was in prior to such damage consistent with the policies and practices of the City. A Minimum of thirty six (36) feet of full access to the frontage road must be maintained at all times in favor of Grantor and Grantor's tenants and occupants, except in times of maintenance and emergency. It is a condition of this Easement that if the Grantor has signed this Easement and returned it to the Grantee on or before May 21, 2018 the Grantee will reimburse the Grantor up to $2,000 for landscaping the area of the Parcel impacted by the Hwy 55 Road Reconstruction Project after the completion of the Project. IN TESTIMONY WHEREOF, the Grantor hereto has signed this document this 3c&` day of �";l'r 2018. J GRANTOR: 2 1 7o75ov2 Page 5 NATIONAL RETAIL PROPERTIES, LP `"A � -S By: NNN GP Corp., a Delaware Corporationgas General Partner By: 4'1— Name: Paik E. Bayer Its:-_ Eire U' ce— P p� . lll�Ylf STATE OF ,fit o At DI�- )SS. COUNTY OF Dl-4fV6- ) The foregoing instrument was acknowledged before me this 364j -day of -yKo-1 , 2018, by Paul E. fter thExecutive Vice Presictit of NNN GP Oorp., a Delaware Corporation, as General Partner of National Retail Properties, LP, a Delaware lbnited partnership, on behalf of said partnership. Notary Public IVETTE CORDERO Commission # FF 205051 Expires April 3, 2019 THIS INSTRUMENT WAS DRAFTED BY: -f,aF Banded Thru Troy Fain In,urence 800385-7019 CAMPBELL KNUTSON Professional Association Grand Oak Office Center 1 860 Blue Gentian Road, Suite 290 Eagan, Minnesota 55121 Telephone: 651-452-5000 AMPlc'h 3 170750v2 Page 6 EXHIBIT "A" TO GRANT OF PERMANENT EASEMENT Parcel Description: That part of the Southeast Quarter of the Northeast Quarter of Section 35, Township 118, Range 22, West of the 5"' Principal Meridian, described as begituiing at a point on the North line of said Southeast Quarter of the Northeast Quarter distant 753.32 feet West of the Northeast corner of said Southeast Quarter of the Northeast Quarter (said North line being assumed to have a bearing of East for purposes of this description); thence South 8 degrees 02 minutes 30 seconds East 113.42 feet, more or less, to the Northerly right-of-way line of State Trunk Highway No. 55; thence Southeasterly along said Northerly line of State Trunk Highway No. 55 a distance of 170 feet; thence Northeasterly on a straight line to the point of intersection with said North line of the Southeast Quarter of the Northeast Quarter at a point thereon 225 feet East of the point of beginning; thence West to the point of beginning. Easement Description: A pernlanent street, drainage and utility casement lying Westerly and Southwesterly of the following described line which line is labeled "Proposed Easement" on Exhibit B attached hereto. Commencing at the Northeast corner of the above described parcel; thence Westerly along the Northerly line of said parcel a distance of 16294 feet to the actual point of beginning of the line to be described; thence Southeasterly along a non-tangential curve convex to the Southwest a distance of 129.25 feet, delta of 99 degrees 24 minutes 16 seconds, radius of 74.50 feet, chord distance of 113.64 feet and chord bearing of South 24 degrees 32 minutes 17 seconds East; thence Southeasterly a distance of 84.72 feet to a point on the Southeasterly line of said parcel, distant 129.24 feet Southwesterly of said Northeasterly corner as measured along said Southeasterly line of said parcel and there terminating. Excepting from the above described parcel the Southwesterly 30 feet thereof. (Torrens Property) 4 P075M Page 7 Page 8 GRANT OF PERMANENT EASEMENT NATIONAL RETAIL PROPERTIES, LP, a Delaware limited partnership, hereinafter referred to as "Grantor", in consideration of One Dollar ($1.00) and otlier good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, does hereby grant unto the CITY OF PLYMOUTH, a municipal corporation organized under the laws of the State of Minnesota, the Grantee, hereinafter referred to as the "City", its successors and assigns, forever, a permanent easement for public street, drainage and utility purposes over, on, across, under and through the land situated in the County of Hennepin, State of Minnesota, legally described on the attached Exhibit "A" (the 'Basement Parcel") and depicted on the attached Exhibit B. INCLUDING the rights of the City, its contractors, agents, servants, and assigns, to enter upon the Easement Parcel at all reasonable times to construct, reconstruct, inspect, repair, and maintain said public street, drainage and utility systems over, across, on, under, and through the Easement Parcel, together with the right to grade, level, fill, drain, pave, and excavate the Easement Parcel, and the further right to remove trees, bushes, undergrowth, and other obstructions interfering with the location, construction, and maintenance of said public street, drainage and utility systems. Grantor does covenant with the City, its successors and assigns, that it is well seized in fee title of the Easement Parcel; that it has the sole right to grant and convey the easement to the City and 195264v1 Page 9 i that there are no unrecorded interests in the Easement Parcel of which Grantor is a party The City shall exercise its rights hereunder in a manner as to not unreasonably interfere with the business operations being conducted on Grantor's land. Once work commences in the Easement Area, the City shall diligently and continuously pursue to completion any installation, maintenance and/or repair of the facilities. Any damage to the parcel of Grantor or Grantor's tenants shall be restored by the City to as good a condition as same was in prior to such damage consistent with the policies and practices of the City. A minimum of thirty six (3 6) feet of full access to the fiontage road must be maintained at all times in favor of Grantor and Grantor's tenants and occupants, except in times of maintenance and emergency. IN TESTIMONY WHEREOF, the Grantor hereto has signed this easement this JV44- day of , 2018. GRANTOR: NATIONAL RETAIL PROPERTIES, LP `cr By: NNN GP Corp Delaware Corvorati on,zeneral-n artner By: _1 4_ Name: PaW E. 13ayer Its: RxeciAive Vice President STATE OE )ss. COUNTY OF ) 195264v1 Page 10 The foregoing instrument was acknowledged before xectme thiU �`t day of a'Ula 2018, by the .ltwe i ee resident of NNN GP Corp., as general partner of National Retail Properties, LP, a Delaware limited partnership, on its behalf DRAFTED BY: CAMPBELL, KNUTSON Professional Association Grand Oak Office Center I 860 Blue Gentian Road, Suite 290 Eagan, MN 55121 Telephone: 651-452-5000 ANM/cib 195264v1 4"-� (��� NOTARY PUBLIC .0vette Cordero WL -98E'008 a3mnsul ule j Anil rayl pepuog , 6602 '£ 10 sajidx� 690902 J� # uoisgwwo0 _• w` 089080-) 311351 Page 11 EXHIBIT "A" TO GRANT OF PERMANENT EASEMENT Parcel Description: That part of the Southeast Quarter of the Northeast Quarter of Section 35, Township 118 North, Range 22 West of the 5a' Principal Meridian described as follows: Commencing at a point on the North line of said Southeast Quarter of the Northeast Quarter distant 753.32 feet West of the Northeast corner of said Southeast Quarter of the Northeast Quarter (said North line being assumed to have a bearing of East for purposes of this description); thence South 8 degrees 02 minutes 30 seconds East 113.42 feet more or less to the Northerly right-of-way line of State Trunk Highway No. 55; thence Southeasterly along said Northerly right-of-way line 170 feet to the point of begiiuiing of the property being described; thence Northeasterly on a straight line to its point of intersection with said North line at a point thereon distant 528.32 feet West of said Northeast corner; thence East along said North line 174.33 feet; thence South 15 degrees 35 minutes West a distance of 212.02 feet more or less to said Northerly right-of-way; thence Northwesterly along said Northerly right-of-way line to the point of beginning. Easement Description: An easement for public street, drainage and utility purposes over, under, across and through that part of the above described parcel lying southwesterly of the following described line which line is labeled "Proposed Easement" on Exhibit B attached hereto. Cormnencing at the northeasterly coiner of the above described parcel; thence southwesterly along the southeasterly line of said parcel a distance of 175.50 feet to the actual point of beginning of the line to be described; thence northwesterly to a point on the northwesterly line of said parcel, distant 129.24 feet southwesterly of the northwesterly corner of said parcel as measured along said northwesterly line of said parcel and said line there tenninating. Excepting from the above described parcel the southwesterly 30 feet thereof. (Torrens Certificate of Title No. 1219215) 4 t952G4v1 Page 12 Page 13 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION APPROVING ACQUISITION OF PERMANENT EASEMENT FOR STREET, DRAINAGE AND UTILITY PURPOSES FOR THE STATE HIGHWAY 55 FRONTAGE ROAD RECONSTRUCTION PROJECT (13002) WHEREAS, the City requires a permanent easement for public street, drainage and utility in connection with the State Highway 55 Frontage Road Reconstruction (13002); and WHEREAS, the properties have PID numbers of 35-118-22-14-0004 and 35-118-22-14-0005; and WHEREAS, National Retail Properties, LP is grantor of real property located within the City of Plymouth as legally described on the two separate attached Exhibit "A" (the "NR Properties"); and WHEREAS, the grantor has agreed to grant the City a permanent easement for street, drainage and utility purpose over a portion of the NR Properties legally described within the Grant of Permanent Easement on the two separate attached Exhibit "B" (the "Easement"); and WHEREAS, the City has agreed to pay the Grantor $60,728.00 as compensation in full for their granting the permanent street, drainage and utility easement. NOW, THEREFORE, BE IT HEREBY RESOLVED BYTHE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA that the City Council hereby approves the Easement and payment of $60,728.00 to the Grantor. APPROVED by the City Council on this 12th day of June, 2018. Page 14 rp)City of Plymouth Adding Quality to Life To: REGULAR COUNCIL MEETING Prepared by: June 12, 2018 Reviewed by: Item: Agenda 6.07 Number: Dave Callister, City Manager Barbara Thomson, Planning Manager Steve Juetten, Community Development Director Deny Access to Ferndale Road North for property located at 515 Alvarado Lane North (2018041) 1. ACTION REQUESTED: Adopt attached resolution denying access to Ferndale Road North for property located at 515 Alvarado Lane North owned by Chris Cota. The request requires a 4/7 vote of the City Council. 2. BACKGROUND: The applicant had requested that access to Ferndale Road from his property be denied so he can install a solid wood six-foot fence 12 feet from this property line. Section 21130.01 of the zoning ordinance allows six-foot fences up to the property line in yards that qualify as equivalent side and rear yards. Equivalent side and rear yards are those yards up against arterial and collector streets where no access would be permitted. The comprehensive plan identifies the subject segment of Ferndale Road as a minor collector roadway. The subdivision (Ferndale North Third Addition) was approved prior to modern record keeping and staff cannot verify whether the City Council denied access to Ferndale Road. The council has denied access for other properties under similar circumstances to allow fences within front yards. This request affords the city the opportunity to 1) deny driveway access to Ferndale Road, a higher order roadway, and 2) allow the property owner flexibility to install a fence. 3. BUDGET IMPACT: NA 4. ATTACHMENTS: Location Map Applicant's Narrative Resolution Page 1 L 0 CO 0 C 0 L 0 s 0 0 2018041 Chris Cota 515 Alvarado Lane Deny Access to Ferndale Road 150 75 0 150 300 r;bCity of Feet Plymouth, Minnesota Page 2 Barb Thomson From: Cota, Chris <Chris.Cota@ergodyne.com> Sent: Thursday, May 31, 2018 11:11 AM To: Barb Thomson Cc: Rebecca.Cota Subject: Fence Plans - Prohibit Ferndale Road Access Hi Barb, I was told to write a note to you by Kip Berglund to request access to Ferndale road be prohibited in order for me to gain a fence permit. Address: 515 Alvarado Ln N Plymouth, MN 55447 Fence Plans: 6 foot high solid wood fence in the southwest corner of my lot that abuts Ferndale road. The fence would run due north and would be 75 feet. It would be 12 feet from the property line. Thanks in advance for your help and please let me know if you there is any other info needed. Chris Cota 402-968-8499 Chris Cota // Senior Product Manager// // Ergodyne, a Division of Tenacious Holdings, Inc. [p] 651.642.5858 or 800.225.8238 // [e] Chris.Cota@ergodyne.com 1021 Bandana Boulevard East // Suite 220 // St. Paul, MN USA 55108 // www.ergodVne.com This email message may contain double -secret stuff. If your name is not up top, please contact the sender, then print and eat this message. CELEBRATE 35 YEARS OF TENACITY ENTER TO WIN Like i.. _€� s.` acs,_ € "% Follow n "mit€ r i F( [low t,' . �t A� t' oily E ._`_ .o : , t �.:�ti.a 1 Page 3 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION APPROVING REQUEST TO DENY ACCESS TO FERNDALE ROAD NORTH FOR CHRIS COTA FOR PROPERTY LOCATED AT 515 ALVARADO LANE NORTH (2018041 WHEREAS, Chris Cota has requested that access to Ferndale Road North be denied for his property located at 515 Alvarado Lane North legally described as: Lot 3, Block 9, Ferndale North Third Addition, according to the recorded plat thereof, Hennepin County, Minnesota. WHEREAS, the property is a double -frontage lot located between Alvarado Avenue and Ferndale Road; and, WHEREAS, the Ferndale North Third Addition was approved in 1982 and the City has no record if access to Ferndale Road was denied; WHEREAS, Ferndale Road is a minor collector and such accesses are discouraged by the Comprehensive Plan and the City Code; WHEREAS, Ferndale Lane is a local roadway and without this action the yard between the home and Ferndale Road may not be considered an equivalent rear yard; and, WHEREAS, the city has a prohibition on six-foot fences in front yards if access to the adjacent public street is permitted. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that it should and hereby does deny private driveway access to Ferndale Road North from 515 Alvarado Lane North. ADOPTED by the City Council on this 12th day of June, 2018. STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on 2018 with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the city this day of City Clerk Page 4 rp)City of Agenda 6008 008 Plymouth Number: Adding Quality to Life To: Dave Callister, City Manager REGULAR COUNCIL MEETING Prepared by: Trevor Quast, Senior Engineering Technician June 12, 2018 Reviewed by: Michael Thompson, Director of Public Works Approve Encroachment Agreement for Sign and Light Item: Poles at Cherrywood Pointe located at 18405 Old Rockford Road 1. ACTION REQUESTED: Adopt attached resolution approving an encroachment agreement for a sign and light poles within the drainage and utility easements at Cherrywood Pointe located at 18405 Old Rockford Road. 2. BACKGROUND: An encroachment agreement request was received from Dave Young, representing Cherrywood Pointe of Plymouth LLC, requesting encroachment of a sign and three light poles within drainage and utility easements on the property located at 18405 Old Rockford Road. Mr. Young's request is for a sign and light poles as shown on the location map. The sign location is approximately 35 feet from the edge of the street and centered between a sanitary sewer and storm sewer. The three light poles are located behind the parking lot north curb within the easement for the storm sewer. If the light poles were relocated elsewhere (outside of the easement) they would no longer serve their intended purpose of lighting up the parking lot. The encroachment agreement states that it is the property owner's responsibility to move the sign and/or light poles at their expense if maintenance or work on the sanitary or storm sewer require such in the future. 3. BUDGET IMPACT: There is no budget impact from this approval. 4. ATTACHMENTS: Location Maps Cover Letter Encroachment Agreement Resolution Page 1 ENCROACHMENT AGREEMENT LOCATION MAP J u o . " 18405 Old M1 Rockford Road 3 a o1> S m Pt # �¢ f A Gttl"Av {,N s J, su sr c n,� x ' c Z J C 4 43ra•Ave N a � a Page 2 } UNITED 11 PROPERTIES lviay 31, 2018 Trevor Quast Senior Engineering Technician 3400 Plymouth Boulevard Plymouth, MN 55447 Deal: Mr. Quast: 3600 Amel'ican Blvd, Ste 750 133117th Street, Ste 604 Mlnnnapolis, Minnesota 55431 p¢ner, Colorado 80202 952-835-5300 720-8913-5870 Please see attached the executed Dtainage and Utility Easement and Encroachment Agteeweat for C;herrpsvood Pointe of Plyniouxh located at 18445 Old Rockford Rd. The Encroachment Agreetnent includes the rnonutnent sign and overhead parking lights located within the nc�w Draivage and [utility Easement. Thank you for your consideration and let me know if you have any questions. Sincerely, Dave Yot:tng Development Project Manager Page 3 ENCROACHMENT AGREEMENT THIS ENCROACHMENT AGREEMENT ("Agreement") made this day Of , 2018, by and between the City of Plymouth, a Minnesota municipal corporation ("City"), and Cherrywood Pointe of Plymouth LLC, a Minnesota limited liability company, C,Own e'). Recitals A. Owner owns real property ("Subject Property") in the City of Plymouth, County of Hennepin, State of Minnesota legally described as: Parcel 1: That part of the East 1/2 of the East 1/2 of the Southwest Quarter lying North of State Highway No. 55 and South of the centerline of Hennepin County Road No. 9, Section 7, Township 118, Mange 22; and Parcel 2: That part of the East 'l2, of the Northeast Quarter of the Northwest Quarter of Section 18, Township 118, Range 22, lying North of State Highway No. 55. B. The City owns a drainage and utility easement (the "City Easement") over part of the Subject Property as legally described on Exhibit A attached hereto. C. Three of Owner's light poles (collectively, "Light Poles" or singularly a "Light Pole') are constructed within the City Easement as depicted on Exhibit B attached hereto Page 4 and Owner's monument sign ("Monument SignJ is oDnst wted within the City Ea Rent as depicted an Exhibit C attached hereto, NOW THEREFORE, in consideration -of the mutual covenants herein contained, it is agreed by the Parties as follows: 1. Encroachment Authorization. The City hereby approves the encroachment of the Light Poles and the Monument Sign on the City Easement. The City shall have r,o responsibility to maintain the Light Poles or the Monument Sign. 2. Access for Maintenance. At all reasonable times, the City shall have reasonable access to the Subject Property for the purpose of maintaining and repairing the City Easemeat In the event it becomes necessary for a Liget Pole to be removed or the Monument Sign to he removed to allow for maintenance and repairs, such removal and subsequent replacement shaii be at the sole expense of the Owner. Hold Harmless and Indemnity. in consideration of being allowed to en-croach on the City Easement, Owner, its successors and assigns, shall indemnify and hold the City harmless from any damage caused to the Subject Property, including damage caused by the Light Poles or the Monument Sign on the Subject Property, caused in whole or in part by the encroachment onto the City Easernent, 4. Right to Modify Agreement. In the event (lie encroachments identified above interfere with the City's use of the City Easement, the City may, in itq reasonable discretion, modify this Agreement in order to limit the extent of the encroachment, at any time, with such rrWification effective following ninety (90) days written notice from City to the then Owner of the Subject Property, except that no notice period will be required in the ease of an emergency condition as reasonably determined by the City. Thereafter, the Agreement will then be deemed modified Page 5 following such applicable notice period. Prior to the expiration of the ninety (90) day notice period or within a reasonable time in the event of an emergency, the then property owner shall remove such Light Poles or the Monument as identified by the City. If the owner fails to do so, the City may remove such Light Poles or the Monument Sign to the extent the City Easement is impacted and charge the cost of removal back to the owner for reimbursement. 5. RECORDING. This Agreement shall be recorded against the title to the Subject Property. (signature page follows) Page 6 0 CITY OF PLYMOUTH Kelli Slavik, Mayor Dave Callister, City Manager STATE OF MINNESOTA ) SS. COUNTY OF HENNEPIN ) CHERR WOOD POINTE OF PLYMOUTH LLC By: James A. Hall, Senior Vice President The foregoing instrument was executed and acknowledged before me on this day of 2018, by Kelli Slavik and Dave Callistor, Mayor and City Manager, respectively, of the City of Plymouth, a Minnesota municipal corporation, on its behalf Notary Public STATE OF MINNESOTA ) )S COUNTY OF HENNEPIN 'he f regomg instrument was acknowledged before me this day of A7 2018, by ,Tames A. Hall, Senior Vice President of Cherrywood Pointe of 111vinouth LLC, a Minnesota limitedI'bility company, on its behalf. ►nrEHovA�1INOTARYQTA�Y PUBLICBLICa��oMINNESOTA4 Notary P ubl' THIS INSTRUMENT DRAFTED BY: City of Plymouth 3400 Plymouth Blvd. Plymouth, MIFF 55447 Page 7 EXHIBIT A LEGAL DESCRIPTION FOR CITY EASEMENT: A perpetual easement for drainage and utility purposes over, under and across that part of the East Half of the East Half of the Southwest Quarter, lying North of State Highway No. 55 and South of the centerline of Hennepin County Road No. 9, Section 7, Township 118, Range 22, Hennepin County, Minnesota, and which lies north of the following described line: Commencing at the southeast corner of said Southwest Quarter; thence on an assumed bearing of North 00 degrees 36 minutes 01 seconds East, along the east line of said Southwest Quarter, a distance of 277.23 feet to the point of beginning of the line to be described; thence North 54 degrees 50 minutes 44 seconds West a distance of 52.98 feet; thence North 72 degrees 59 minutes 46 seconds West, a distance of 56.48 feet; thence North 50 degrees 55 minutes 08 seconds West a distance of 83.92 feet; thence North 57 degrees 16 minutes 37 seconds West a distance of 284.69 feet; thence North 07 degrees 10 minutes 24 seconds West a distance of 16.41 feet; thence North 59 degrees 26 minutes 14 seconds West a distance of 288.55 feet; to the west line of said East Half of the East Half of the Southwest Quarter and said line there terminating. Page 8 EXHUBIT 0 r r 4p s Him C "ERRYWOOD OF PLYMOUTH �+ � � i4g6 0L91106� IBaS R.IY}J�.a fi�+li � � UWMD PROftRVIE; I� kxlp.`,da ffm n ,ubbWLPVuh.b&W— age '4� EXHIBIT C BUIhDiNQ SETBAC.I UME NEW DRAlWkGE a UT LPTY E&,SEMENT DRA NAGE a U FLJlY EJSMUT urs r WERRWM D -PLYMOUTH, Mt -:7 civilsifeY.T. IOUs w vL W f fl It G " [} V P FI ° �Y v-0' 0 1C�� MONUMENT SKIN WCAT34�♦yN Rw`dor lhnF�r EX. A 715+1 B Rwnum [�: Page 10 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION APPROVING AN ENCROACHMENT AGREEMENT FOR A SIGN AND LIGHT POLES ON PROPERTY LOCATED AT 18405 OLD ROCKFORD ROAD WHEREAS, Dave Young, representing Cherrywood Pointe of Plymouth LLC, requested the City to approve an encroachment agreement allowing a sign and three light poles to be constructed within drainage and utility easements at 18405 Old Rockford Road; and WHEREAS, the encroachment agreement permits only the sign and three light poles within the easements and all related facilities must still meet all applicable City codes; and WHEREAS, the owner's properties are legally described as: parcel 1: That part of the East % of the East % of the Southwest Quarter lying North of State Highway No. 55 and South of the centerline of Hennepin County Road No. 9, Section 7, Township 118, Range 22; and parcel 2: That part of the East % of the Northeast Quarter of the Northwest Quarter of Section 18, Township 118, Range 22, lying North of State Highway 55. NOW, THEREFORE BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that the encroachment agreement that will allow the sign and light poles in the drainage and utility easements at 18405 Old Rockford Road is approved. APPROVED by the City Council on this 12th day of June, 2018. Page 11 rp)City of Plymouth Agenda 6m09 Number: ' Adding Qua[i[y to Life To: Dave Callister, City Manager REGULAR COUNCIL MEETING Prepared by: Lori Sommers, Senior Planner June 12, 2018 Reviewed b y' Barbara Thomson, Planning Manager and Steve Juetten, Community Development Director Review Deadline: Approve Conditional Use Permit to Allow a Columbarium at August 4, 2018 Item: Property located at 5005 Northwest Boulevard (Beautiful Savior Lutheran Church - 2017100) 1. ACTION REQUESTED: Adopt attached resolution approving conditional use permit to allow a columbarium at the southwest side of the church building as recommended by the Planning Commission. Approval or denial requires a 4/7 vote of the City Council. 2. BACKGROUND: On May 16, 2018, the Planning Commission conducted the public hearing and subsequently voted unanimously to recommend approval. The applicant was present in support of the request. Other than the applicant, no one from the public wished to speak on the matter. A copy of the Planning Commission meeting minutes and report is attached. Notice of the Planning Commission's public hearing was published in the City's official newspaper and mailed to all property owners within 500 feet of the site. Development signage remains on the site. 3. BUDGET IMPACT: Not applicable. 4. ATTACHMENTS: Planning Commission Meeting Minutes Planning Commission Report with Attachments Resolution Page 1 Proposed Minutes Planning Commission Meeting May 16, 2018 MEMBERS PRESENT: Chair Marc Anderson, Commissioners Bryan Oakley, Julie Witt, David Witte, Kira Vanderlan and Justin Markell MEMBERS ABSENT: Commissioner Donovan Saba STAFF PRESENT: Planning Manager Barbara Thomson, Senior Planner Lori Sommers, Senior Engineering Technician Trevor Quast OTHERS PRESENT: Councilmember Ned Carroll 6. PUBLIC HEARINGS A. BEAUTIFUL SAVIOR LUTHERAN CHURCH. (2017100) Chair Anderson introduced the request by Beautiful Savior Lutheran Church for a conditional use permit to allow a columbarium at the south side of the church building located at 5005 Northwest Boulevard. Senior Planner Sommers gave an overview of the staff report. Commissioner Oakley asked if similar uses have been approved in the city in the past. Senior Planner Sommers confirmed that there are similar uses in Plymouth. Chair Anderson asked if this would be approval for the first phase or entire project. Senior Planner Sommers replied that this would approve the entire project, in the case that the applicant has the funding to complete the entire project. Planning Manager Thomson replied that the commission could put a time limit on the approval, which would require the applicant to come back to the commission for further approval if the project is not completed in that amount of time. Commissioner Witt asked what would happen if the church were to vacate the property in 20 years, and someone else wanted to purchase the property. She asked if there would be protection of this feature or whether it would be considered a structure. Planning Manager Thomson stated that it would be part of the site and the conditional use permit would remain, therefore the feature could remain. Page 2 Commissioner Witte stated that this is a beautiful design and setting. He asked if this would be treated the same as a cemetery, and whether a cemetery would qualify for a special exception at this site. He also asked if this would be regulated by the state, similar to a cemetery. Senior Planner Sommers replied that the conditional use permit contains a number of conditions for the applicant to follow. She stated that the city does not have any regulations that require inspection from a health inspector. Commissioner Witte stated that this feature is popping up more in the city without regulations for record keeping or things of that nature. Senior Planner Sommers replied that the city would have a record of the number of spaces available. Chair Anderson introduced Derek Seifert, Anderson Engineering, who stated that he is present to answer any technical questions the commission may have. Chair Anderson opened the public hearing and closed the public hearing as there was no one present to speak on the item. Chair Anderson asked for input on phasing. Commissioner Oakley stated that he does not have a concern with phasing and believed it would be more efficient to approve the entire project at once. MOTION by Commissioner Oakley, seconded by Commissioner Vanderlan, to approve the request by Beautiful Savior Lutheran Church for a conditional use permit to allow a columbarium at the south side of the church building located at 5005 Northwest Boulevard. Vote. 6 Ayes. MOTION approved. Page 3 Agenda Number File 2017100 PLYMOUTH COMMUNITY DEVELOPMENT DEPARTMENT PLANNING AND ZONING STAFF REPORT TO: Plymouth Planning Commission FROM: Lori Sommers, Senior Planner (509-5457) through Barbara Thomson, Planning Manager MEETING DATE: May 16, 2018 APPLICANT: Jim Holmlund, on behalf of Beautiful Savior Lutheran Church PROPOSAL: Conditional use permit to allow a columbarium at the southwest side of the church building LOCATION: 5005 Northwest Boulevard GUIDING: P -I (Public/Semi-Public/Institutional) ZONING: P -I (Public Institutional) SCHOOL DISTRICT: ISD 281 (Robbinsdale) REVIEW DEADLINE: August 4, 2018 DESCRIPTION OF REQUEST: The applicant, on behalf of Beautiful Savior Lutheran Church, is requesting approval of a conditional use permit to allow a columbarium in the P -I zoning district. The columbarium would be located at the southwest side of the church building. This area is currently lawn with a few trees. Notice of the public hearing was published in the city's official newspaper and mailed to all property owners within 500 feet of the site. A copy of the notification area map is attached. Development signage was also placed on the site. Page 4 File 2017100 Page 2 CONTEXT: Surrounding Land Uses Natural Characteristics of Site This site is located in the Shingle Creek Watershed District. The site in not located in a shoreland or flood plain overlay district. A high quality wetland is located in the northwestern portion of the site. Previous Actions Affecting Site In 1994, the City Council approved a rezoning, site plan, conditional use permit and variance to develop the church. In 1997, the City Council approved a site plan to allow construction of a 54,224 square foot church on the roughly 36 -acre parcel. The first phase of building construction included 25,742 square feet. In 1999, the City Council approved a pre-school/daycare at the church. In 2005, the City Council approved a reguiding and rezoning to public -institutional and a 28,136 square foot building addition. That approval also included a conditional use permit to allow the new sanctuary to be 62.5 feet high and the spire to be 80 feet high. In 2016, the City Council approved a 24,000 square foot building expansion and related site improvements. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The city's discretion in approving or denying a conditional use permit is limited to whether or not the proposal meets the standards listed in the zoning ordinance. If it meets the specified standards, the city must approve the conditional use permit. However, the level of discretion is affected by the fact that some of the standards may be open to interpretation. Page 5 Adjacent Land Use Guiding Zoning North Single family homes — Bass Lake Terrace 2na & 4' Addition LA -2 RSF-2 East Single family homes — Meadows of LA -1 RSF-2 Bass Lake Addition South Townhomes — Plymouth Place & W nfield Place LA -2 RMF -3 FRD West I-494 P-1 (future restricted develo ment Natural Characteristics of Site This site is located in the Shingle Creek Watershed District. The site in not located in a shoreland or flood plain overlay district. A high quality wetland is located in the northwestern portion of the site. Previous Actions Affecting Site In 1994, the City Council approved a rezoning, site plan, conditional use permit and variance to develop the church. In 1997, the City Council approved a site plan to allow construction of a 54,224 square foot church on the roughly 36 -acre parcel. The first phase of building construction included 25,742 square feet. In 1999, the City Council approved a pre-school/daycare at the church. In 2005, the City Council approved a reguiding and rezoning to public -institutional and a 28,136 square foot building addition. That approval also included a conditional use permit to allow the new sanctuary to be 62.5 feet high and the spire to be 80 feet high. In 2016, the City Council approved a 24,000 square foot building expansion and related site improvements. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The city's discretion in approving or denying a conditional use permit is limited to whether or not the proposal meets the standards listed in the zoning ordinance. If it meets the specified standards, the city must approve the conditional use permit. However, the level of discretion is affected by the fact that some of the standards may be open to interpretation. Page 5 File 2017100 Page 3 ANALYSIS OF REQUEST: Conditional Use Permit A conditional use permit is required to build a columbarium/memorial garden in the public institutional district. The applicant indicates that the columbarium would be located southwest of the existing worship center and accessed by sidewalks from the building and parking lot. The applicant specifies that there will be four columbaria banks that will be constructed in a circular pattern. Materials include brick veneer, similar in color to the red walls of the church and stainless steel columbaria units, faced with rose granite markers. The caps of the columbaria walls will be concrete. There will be a total of 592 niches. Each niche would accommodate a maximum of two urns for a total capacity of 1,184 urns. A space for 80 urns will be installed with phase one. Future phases will include an additional 1,024 urns, for a 1,184 urn total. The columbarium would be roughly six feet tall and just over 24 feet long. The total width of the columbarium would be roughly three feet. Section 21650.07 of the zoning ordinance lists cemeteries or memorial gardens, subject to the following conditions: 1. The site is landscaped in accordance with section 21130 of the zoning ordinance. The memorial garden is consistent with the applicable requirements for plant spacing and ground cover. 2. The use is available to the public. The use would be semi-public as niches would be available for sale to church members and relatives as well. 3 All portions of the use meet the minimum setback requirements for principal structures. The applicable setback is the 75 -foot setback from Schmidt Lake Road. plan, the memorial garden is set back 236.2 feet from the right-of-way. Findings on the Conditional Use Permit According to the The Planning Commission must review the request against the general and performance standards for conditional use permits in section 21015 of the zoning ordinance (attached). Staff reviewed the application against these standards as follows: Comprehensive Plan: The comprehensive plan indicates that P -I uses are consistent with the P- I land use classification. Consequently, the propose use is consistent with the city's comprehensive plan. Page 6 File 2017100 Page 4 Public Welfare: The proposed use would not be detrimental to the general public health, welfare, moral or comfort. Views of the memorial garden are obscured from adjacent properties by the landscaping and parking lot. The memorial garden would fulfill a necessary service within the community. Impact on Surrounding Property: The memorial garden would not be injurious to the immediately surrounding properties. The garden would be located adjacent to the existing church. The church blocks visibility from the properties to the east. Existing coniferous trees provide vegetative screening to the north and south and proposed evergreen plantings provide screening to the west. Orderly Development: The surrounding properties are fully developed and construction of the memorial garden would not impede improvement of the surrounding properties. Public Facilities: The subject site is adequately served by public facilities. District Regulations/Performance Standards: The proposed use would be consistent with all regulations and standards for the P -I zoning district as outlined above and listed in section 21015.04 of the zoning ordinance. RECOMMENDATION: Community Development Department staff recommends approval of the conditional use permit, subject to the conditions outlined in the attached resolution. If new information is brought forward at the public hearing, staff may alter or reconsider its recommendation. ATTACHMENTS: 1. Draft Resolution Approving Conditional Use Permit 2. Conditional Use Permit Standards 3. Location Map 4. Aerial Photo 5. Notification Area Map 6. Applicant's Narrative and Graphics P/Planning Applications/2017/2017100 Page 7 201100 Beautiful Savior Lutheran Church 5005 Northwest Boulevard Request for CUP 500 250 0 500 1,000 Feet IrPity of Plymouth, Minnesota Legend ® C, Commercial ® CC, City Center ® CO, Commercial Office ® IP, Planned Industrial LA -1, Living Area 1 LA -2, Living Area 2 LA -3, Living Area 3 ® LA -4, Living Area 4 ® LA -R1 LA -R2 ® LA -R3 LA -RT ® P -I, Public/SEPW/Igtitutional -�; Hennepin County Locate & Notify Map Date: 4/26/2018 m r 3 f r I _ _ Ak'd4hlE lige Ri bilk i s —�- 01MIdt Lake of os M •_ 47 Buffer Size: 500 feet 0 245 490 980 ft Map Comments: I I I I I I I 1 1 5005 Northwest Boulevard This data (i) is furnished 'AS IS' with no representation as to completeness or accuracy; (ii) is furnished with no warranty of any kind; and (iii) is notsuitable for legal, engineering or surveying purposes. Hennepin County shall not be liable for any damage, injury or loss resulting from this data. For more information, contact Hennepin County GIS Office 300 6th Street South, Minneapolis, MN 55487 / gis.info@hennepin.us Page 9 4, �1 r� a•. r , If Canadian" Pacifi g ,r tt 75 r. A -.. Schmidt Lake Road AX Curtis L e L 201100 Beautiful Savior Lutheran Church 5005 Northwest Boulevard Request for CUP 480 240 0 480 960 Feet Pcity of Plymouth, Minnesota Page 10 Request: Beautiful Savior Lutheran Church is requesting a conditional use permit to allow a columborium memorial garden in a P-1 district at 5005 Northwest Blvd. Packet Includes: Application/Narrative Site Survey with Proposed location Memoriol Garden Plan with Landscaping and Access Detailed Columbaria Plans and Elevations with materials and dimensions �i V --iC -J sf Project Narrative: Beautiful Savior Lutheran church, 5005 Northwest Blvd, desires to build a memorial garden that will initially include one round columbarium cabinet and eventually include 3 additional double sided curved columbaria wall cabinets for the inurnment of congregational members and their families on the church property adjacent to the far west side of the existing church parking lot. Eickhof Columbaria , located in Crookston, MN was selected to provide the columbaria design and manufacturing, as well as design services for landscape and pathways. They have produced the plans and drawings included in our application packet. The proposed memorial garden location is currently vacant and offers privacy with many existing trees in area which will not be disturbed. The addition should not affect the neighbors in any way. It will not noticeably increase traffic to the church and the existing church parking lot will provide adequate parking. The memorial garden will be wheelchair accessible from the parking lot. Changes to the elevations will be minimal and the existing drainage pattern will be retained with water flowing to the existing wetlands, following the slope north west. Page 11 Beautiful Savior L U T H E R A N C H U R C H Connected to Col, Growing in hu ilk Serving &Reaching Otheri Subd. S. The Planning Commission shall consider possible adverse effects of the proposed conditional use. Its judgment shall be based upon (but not limited to) the following factors: (a) Compliance with and effect upon the Comprehensive Pian, including public facilities and capital improvement plans. • The use of cemeteries or memorial gardens are a permitted use following the approval of a conditional use permit [CLIP] meeting the criteria set forth in 21650,07 of rhe City of Plymouth zoning ordinance. (b) The establishment, maintenance or operation of the conditional use will promote and enhance the general public welfare and will not be detrimental to or endanger the public health, safety, morals or comfort. • The columbaria will be maintained and operated by BSLC in a manner that will enhance the general public welfare and will not be detrimental to or endanger the public health safety, morals or comfort. (c) The conditional use will not be injurious to the use and enjoyment of other property in the immediate vicinity for the purposes already permitted, nor substantially diminish and impair property values within the neighborhood. ■ The columbaria has been sited away from the property limits and is screened by vegetation on the north and west side. The location of the columbaria will not impede on adjacent properties. (d) The establishment of the conditional use will not impede the normal and orderly development and improvement of surrounding property for uses permitted in the district. ■ Location of the columbaria has been considered for future development of the property. The location has been carefully selected to allow for possible future development and expansion. (e) Adequate public facilities and services are available or can be reasonably provided to accommodate the use which is proposed. ■ Siting the columbaria to meet all setbacks, the columbaria will be easily accessible to the primary structure and adjacent parking lot through two concrete sidewalks. These connections will allow for adequate public facilities and services to be readily available for users of the columbaria. (f) The conditional use shall, in all other respects, conform to the applicable regulations of the district in which it is located. • The columbaria has been designed to conform to the applicable regulations of the district, Pl, Public/ Institutional. (g) The conditional use complies with the general and specific performance standards as specified by this 5ection and this Chapter. • The columbaria has been designed to comply with the general and specific performance standards 5405 NORTHWEST BLVD., PLYMOUTH, MN 55442 763.550.10001 INFO@BEAUTIFULSAVIORLC,ORG WWW.BEAUTI FU LSAVIO R LC.O RG Page 12 Beautiful Savior L U T H E R A R C H U R C H Cwmecled to Carl. Growing in Paith, Serving &Rerrrbing Qlhers Subd. 3. Cemeteries or memorial gardens provided that: (a) The site is landscaped in accordance with Section 21130, Vegetative screening is being provided by existing coniferous trees to the south and proposed evergreen plantings to the west. (b) The use is available to the "public". • BSLC has developed a columbaria handbook, identifying processes and operating procedures. The columbaria will be made available to members and active worshipers of the church for internments, who are also members of the surrounding community. (c) All portions of the use meet the minimum setback requirements for principal structures. ■ The columbaria has been placed and exceeds all minimum setback requirements. 5405 NORTHWEST BLVD,, PLYMOUTH, MN 55442 763.550.1000 f INFO@BEAUTIFULSAV[ORLC.ORG WWW. B EAUTI F U LSAVEORLC.ORG Page 13 _'ANDERSON ENGINEERING Anderson Engineering of Minnesota, LLC 13605 1" Avenue N., Suite 100 + Plymouth, MN 55441 - lel: 763.412.4000 - Fax: 763-412.4090 ■ www.ae-mn.com Aprii 4, 2018 City of Plymouth 3400 Plymouth Blvd. Plymouth, MN 55447 Attn: Lori Sommers Re: Beautiful Savior Lutheran Church — Columbaria Court Application for conditional use permit (2017100) 5005 Northwest Blvd., Plymouth, MN 55447 Lori, V1A email: lsommers@olymouthmn.gov Included with this memo are the construction pians for the proposed columbaria court at Beautiful Savior Lutheran church for review by the City of Plymouth's staff. Also included are architectural renderings provided by the columbaria manufacturer for reference. It is our hope that we can address any comments from City staff and be included on the May 16, 2018 Planning Commission Agenda. Beautiful Savior Lutheran church is proposing a columbaria court located near the south west corner of their building, just north of the existing parking lot. Four (4) columbaria banks will be constructed in a circular pattern, with an overall height of approximately 5' - 8". Materials will be selected for longevity and quality — consisting of metal, brick veneer and concrete. At capacity, the columbaria court will hold 1,184 urns. Siting the columbaria to meet all setbacks, the columbaria will be easily accessible to the primary structure and adjacent parking lot through two concrete sidewalks. These connections will allow for adequate public facilities and services to be readily available for users of the columbaria. Vegetative screening is being provided by existing coniferous trees to the south and proposed evergreen plantings to the west. Please review the attached documents and return any comments via email to ideitner(a7ae-mn.com. ff you have any questions or comments, please don't hesitate to call me at 763-412-4016. Regards, nderson Engineering of MN, LLC /(Jeff Deitner, PLA Project Manager CC: Grady Kinghorn, Kinghorn Construction Attachments: Columbaria Court — Beautiful Savior Lutheran Church Plan Set (Dated 04/0412018) Design Concepts for Beautiful Savior Lutheran Church - Eickhof A Service -Disabled Veteran -Owned Small Business Civil Engineering - Architecture. Land Surveying - 1=n vironmental Services ■ Landscape Architecture V 1i;20011.1227 KIN GHORN - BEAUTi FUL SAVIOR LUTHERAN CHURCH ExPAN SION - PYMtluTHIOO COL UMBARIA COU RT100 Subivu4aksaO 1$-94 04 Ci1Y SVhmulall2[i1y-I.r4-f)J_I TR Tn rITy Dan Page 14 ALTERNATE PROPOSES SITE Al • �`,� ti:1..k�ti i'.'. k I f ' f f j + : f o +44 Y r ' �. � - ,• r� � � �SM� r i� � ti I } rf p�� �� J f f �,,•; , - � _ ! ZOL O f -. d��'9ly - +r lCsENd +� —« ��• � i� 1 4~ ` � �: sj I -.I F { 3 �'r ,y ...r✓on„+•ter o-. OL Q O � Wr -G� o o _ •+ ;\� +]r `rix ,_ ; , I `•�� � � X11 ; �,9� ���� ,� .�.�1.,1f � � ..�_ �. � ,..irk;. , y9_' T �_ L_ w _yam--er+a u..w%, raoi. •� _ I_r� z AND E RSO N �„,eYa Len.mL L1C — — — — — — — — — — ——TiZ`lINEERIlJG:�., (k EICKHOF• [. 2w. 11" t-6-� MW BRUCE STREET CROOMON• MN $6716 FREE au,: Loraw�r URAYnr.G. 1,341 L7RAYM 6Y+nFdE L SCALE. •--".W 1705 7a7 Page 15 rulz ri l ri[rr - NO: .�00.9DM5TfNXlIOL< nvsf i - wtnuFxro`e r�F V-�Sarir ;EICKHOF'= PA1EKRD 1tl111E rwffs. 65210r�Lca.rie.aV r.cxa �osras urnR F+amaw«rns ..uara�rto.4.s PAT"PHMNG 12D.78EIFOE SINED CRCKWMDN. MN 567 l8 MONO r218j 2A 6.5541 i TOLL Fi'F [no] 252-0257 `z , 5 I 5 'r I 6 _ S b i moi` i I i i i I�iwNeRr pFtiwr+cs �ci NO: .�00.9DM5TfNXlIOL< ;EICKHOF'= PA1EKRD ..uara�rto.4.s PAT"PHMNG 12D.78EIFOE SINED CRCKWMDN. MN 567 l8 MONO r218j 2A 6.5541 i TOLL Fi'F [no] 252-0257 j S V z a Z r r— �O V2 � 1— w m •➢ATE IQjliiif7l} ---- p AWM#r- ! 7J5.2-T- p"WHV FAV 51Ar DRAWwR GSCHEWDBT PxE_ LLPJT _— . .- REmmom5 K -A& I/2'-1.0• 11Cy NUw--Ei [7054 3OF7 Page 16 PHASE— 1= CANTERBURY -80 COMPANION NICHES —�-- 1dU lOM !ACES t� I Qom. FUTURE PHASE - 140 TOTAL COMPA_NI.ON NICHES SET BACK-TO•BACKI iort4r r+.'r�s+c sx.�riirF+oF� i PRELIhMNARY DRAVANGS Al4TF0RC0NMUCTi0N I TMQk-ffl�KQ+ •�t' - - '�- YY.4 M1-'��Ld.1 .rA51 = ��-ai�bb �.t:nab tiY �S.wMY= t �.W'f+ritt - 3� a-wMxaFc.w - I 7 = .4Y. V �1v�:v�ro •3nYwswn s T I i� - -' AWV mw - i 11/r wo. u.YrsYa1'Iw Yao..T Ytr4wHY -,�;FTGYA�IC�A�FE �I 1Nf1EH.EFISaYY [�l1p—� ,..F�oo.na+�naaprar ui EICKHOF' �rt MW W" FTRM C*OC@ 3" IIN SY: 18 Rime it 14 2i1.Y30F :mfw= ce V Z w 2 O .FYowta..osawaw i w m GATE 14/13/2017 GPA%rAr 17034-1 GNAWNWr Fl/AT. WAnYml A 61ECMD Or. FAj F M -F. `►J T. !_Ysi.e=..we*�wrs I iCAlE3�a•-i•� RDE Fu.0m 17054 4 OF 7 Page 17 FL"•TURE PHASE • 37210TAL COMPANION NICHES {SET 6ACK-TO-SACK] — i-�rzr woes TW w: rx[r.6vu- or..;,.. yncFs i PWUMINARY ORA%MNC-S I (A) NOT FOR CONSTRUCDON j ! E I C K H O F FJE1E7Ctlr +�#+491�51�1 ®i i i iii■ C p w ... .,...a warn• r m iii� } W.IE: 10/T3f2017 ra•. 9,.� ■■iiiisoni�iiimiiii■ OkAWN& FSfAT_ t■i PNBNT?FNpF�. I xoa eclfCE i7eBET MOMS". wr wa d. PWr}IE 1219126i.35P1 TOR ME ' {e04Y' 75}W57 u u Z aZ D xutiTN�soe�rr�oar- �- [.Rry.awto.wp. V FAi '--; - r--' --- - -•' --' ----- "". ie� 1 _ .moi r._T_.' - --- e - - - - -- - - r,-- i � SG[lE 3fi'-I'-C 17054 .w�.��r ..r.+.m['m +�ti�i-0rt�6M .f EL'\U[Of}S�R��.L .�.�.� �-erRe.�+•..e..� - ;[��xe ��� , 91EFT Nl1NEER 5OF7 Page 18 C p w ... .,...a warn• r m } W.IE: 10/T3f2017 ra•. 9,.� ORAWRM:r 1iGSi-1 OkAWN& FSfAT_ xutiTN�soe�rr�oar- �- [.Rry.awto.wp. V FAi '--; - r--' --- - -•' --' ----- "". ie� 1 _ .moi r._T_.' - --- e - - - - -- - - r,-- i � SG[lE 3fi'-I'-C 17054 .w�.��r ..r.+.m['m +�ti�i-0rt�6M .f EL'\U[Of}S�R��.L .�.�.� �-erRe.�+•..e..� - ;[��xe ��� , 91EFT Nl1NEER 5OF7 Page 18 Page 19 PREuAAINARY ORAWINGS ol NOT FOR CONSTRUCnON 'YK — — —.vrm. �o vs •w,.• , tr>ab» — — — EICKHOF now i i216r 2&I-4f�1 - _ - I lesal25.- 57 4 t —_ u�nv.wr•rt.r.wl w.i },Hmals.n � i1 iOV.17-A1F Q Z i � H 50 a ase.�.os.oa.l.uremw�s aw lo. wyea d ..1 vrr.wlueatla � - I � • - -- - t��Y>�cyR 1110 �^ LryiH�lY 1FrJ ]ba.{VeYiw¢.lr.a ww1.WMo. d qY il��� r.cy.alracor r.P.A mamv.a..mcnwY.,c raulrreo ac.. � rA.EPFrrR r � � EMSE ! 73 77 •_ 11PaWilt� YTl73sr E1pAYFN BY- F.bfltl. FQUM�,47FCN REOUFREnFENi� T11S 171P sfi fK """�--'; :TIW fRf��AR�Hf>I�g li OOltYSllClip A3lEldll..pFOYS C{RIIYIrImIMG1AtM1if.6 WiE9.=IFYl1 TE 11CMIW.'.Ol acvhsx+ra'rm.[o Y, rF F+CaIaF Pl11.v.NGS11l�lli}STuil.G nS xOnL x IQ19.HIG+tf vErnume PUT FYKr!l.Yl rn FJtS. v i.& tp(yQfSlry61T0'.b 114 f{S1,r+l�14114 i � bPlaa;ilc-Ryrllq[S I'VE - - � I I,H MK rhe711K 1i01O IEFf WCBO{WjclE a I!4 V.1t Q n9E5[LO {Qq,T;, ..E YRled FEli1F IO.: sTtll 23 nl[ K 1r C— 11P6GP WaQR +71.4 FCRrG1rUt! ►vJ,1< 4E11IMM.M Slniri Vl'3, K f PM1PAKIiPTp 11E FI.RPYYMieCl4 S11pYM+[r+[w C/A.TGSM Eri4A)4l0 t sf IErr111Y�MPP' Fi4MIsp11YEOl[p��6TUp VIBQM_W 9iYEJNplP6F[)2T4Y.SE rNCIIPt YP/.]�T]wc rEMMrYE&Iftd Tl4 __ _ - SIt YI11KM Yµr V,qF F 1V YA9 VICR+[IISLLn . V M!!4lE 61P01'ROS.II YIYQLSVIk� 114JlpbATIOM# t!'11 S.Y[ MIY1I.Y: SYIYlE r *ou4 yRl3lar uvV[IM11 lw,IrrtiUelaAr4N.tECaNSS,PUSfom fO l.¢eucruuu4.3wN [If+rgE f[+.WlGS Ola rid ,IW+rOlf dVFkSOM4 _ NOIY.,.4P. 1117 p,�p rP YW 10 rCGN4R4, Ntl,rLL Pg f91F�Cl,IVN.5ER1F {plr.fRliS RI'•4 [g1Fyy.p.,1.� S IlEiL1E.1EItlPn P1f a+Cl¢, lrsF�:lgPas'[lsFm1E5 PNTJ6 Fr,Txp1FYB>r,,fwel 411 e+V' x bd 10f+C _ N1111E yf Hk1[ yEfArly�rr iP K{-0W.✓3WIr/ll{�.WL�Sn l�Fow-D,1gFrlPMw(F p[M[: Pe�J11A,1Qi.,Irt IprQM rWA111[rl r!.>51 vi{I T.i((L 4AfLr.WY1EZlY � " - s ',xFre6te P! el RpmfgQlRM111VRr1116_ K 1l791N1i4N I{9• FiCu"10EFV I 1J1E l� K ,11U/.CF a.up lF A+.' A.d 1gEU irvosEoruuearrl [x Yb[xgn— hJeil5l w! Em[F!n 11,--* F n4 -.10 n.ff-- - rFFf V.IIF+P %1#114il1y(y1![FMS NNUD„1E+0[Cla IMnE r�.1s*1nt1lrtfTrlllwlalw. STi.laIr4SFF[]lTiu[��rTIQ{{r.[SSr MkL wxmr! rmaa oP.n iCm NUMslF- _ • r.z .ml0.tr.S ON trFM011.tIQ 1.1L.9r 15N CGPrXNC1CP CrLt _ ME W,1.iTF,arl�41Mr10P.Cr4[ SYD 1.no1 �E a1Sl 1r1 +�,F.11ti calua.n..r r.saurmlrrnlwulla.+a u�aT;s lnev�vl r.E iel�orEDu:wwlx4iwlll,C�xix.G+�mlt unt•*:� 7 T/�J� 05 4 �€ 1 / ur.l.a.ou wr*a+a,z,w.xlmlln..unF.m rs.Yv cul r rou IM1.+wr WE'Ams I�asrr7aav _ 3 -bffl tajmM 6OF7 Page 19 Phase 1 $O- 32" x 12" companion niches finished in polished American Rose niche fronts. rn d& in minne&Aa patented wxweickhufeafumbariax= SM253.0457 7 Page 20 Design Concepts For Beautiful Savior Lutheran Church Plymouth, MN EICKHOF @ Wtdm 1 f f . �� �y }• .. .� tea• �' ii..+�� ' . 1. - }r�•a� :`fit Eickhof Columboria hic• 1200 Bruce Sireor Crookslon, Minnesota 56716 5lephen Noyes Sales & Marketing MOnager Tel: 800,253,0-057 ext, 122 stopkan@eickhofccluFnbarJa.com CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION APPROVING CONDITIONAL USE PERMIT FOR Jim HOLMLUND FOR BEAUTIFUL SAVIOR LUTHERAN CHURCH FOR PROPERTY LOCATED AT 5005 NORTHWEST BOULEVARD (2017100) WHEREAS, Jim Holmlund on behalf of Beautiful Savior Lutheran Church, has requested approval of a conditional use permit for a columbarium on the site legally described as follows: That part of Outlot A, The Meadows of Bass Lake, according to the plat thereof of record in Hennepin County, Minnesota, which lies Westerly of Northwest Boulevard; the Westerly line of said Northwest Boulevard being described in Document No. 5934877 as follows: Beginning at the Southwest corner of said Outlot A; thence North 0 degrees 42 minutes 15 seconds West, assumed bearing along the West line of said Outlot A a distance of 578.67 feet; thence Northeasterly 243.17 feet along a nontangential curve concave to the East having a radius of 789.30 feet and a central angle of 17 degrees 39 minutes 06 seconds, the chord of said curve bears North 28 degrees 21 minutes 14 seconds East; thence North 37 degrees 10 minutes 47 seconds East, tangent to said curve 259.20 feet; thence Northeasterly 148.21 feet along a tangential curve concave to the Northwest having a radius of 689.30 feet and a central angle of 12 degrees 19 minutes 11 seconds to the North line of said Outlot A and there terminating; Together with: The Southwest Quarter of the Northeast Quarter of Section 10, Township 118, Range 22, Hennepin County, Minnesota, except a strip of land 100 feet wide being 50 feet in width on each side of the center line of the Minneapolis, St. Paul and Sault St. Marie Railroad as it is constructed and laid out over and across said tract, and except Parcel 12 S.P. 2785 (494=393) 910; Subject to Schmidt Lake Road as described in Document No. 5934877; to Medicine Lake Drive; and to all other matters of record. WHEREAS, the Planning Commission has reviewed said request at a duly called public hearing and recommends approval. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that it should and does approve the request by Jim Holmlund on behalf of Beautiful Savior Lutheran Church, for a conditional use permit, subject to the following conditions: 1. A conditional use permit is approved to allow a columbarium in accordance with the application and plans received by the City on October 25, 2017, and additional information on April 4, 2018, except as may be amended by this resolution. 2. The requested conditional use permit is approved, based on the finding that all applicable standards have been met, specifically; the proposed use: a) would not endanger the public health or safety; Page 22 b) would not be injurious to other properties in the vicinity or to the city as a whole; c) would not impede the orderly development of surrounding properties; d) has adequate public facilities and services available; and e) conforms to the applicable regulations of the district. 3. The permit is subject to all applicable building and fire codes, and to all city regulations and ordinances. Any violation thereof shall be grounds for revocation. 4. Prior to installation of the columbarium, the applicant shall obtain a separate approval of a building permit. 5. Prior to issuance of a building permit, the applicant shall fulfill the requirements, submit the required information, and revise the plans as indicated below, consistent with the applicable city code, zoning ordinance, and engineering guidelines: a) Receive city approval of final construction plans. b) Receive NPDES permit. c) Receive any required Shingle Creek watershed approval. d) Demonstrate compliance with city Water Quality Standards Guidance (note, this is a 'common plan of development' with the previous project in regard to Water Quality Standards Guidance). e) Show erosion and sediment controls, i.e. silt fence, bio -logs, inlet protections to downstream drains. 6. Standard Conditions: a. Subsequent phases or expansions are subject to required reviews and approvals per ordinance provisions. b. The conditional use permit shall expire one year after the date of approval, unless the property owner or applicant has started the project, or unless the applicant, with the consent of the property owner, has received prior approval from the city to extend the expiration date for up to one additional year, as regulated under section 21015.07 of the zoning ordinance. APPROVED by the City Council on this 12th day of June, 2018. STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on June 12, 2018, with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk Page 23 rp)City of Plymouth Adding Quatity to Life REGULAR COUNCIL MEETING June 12, 2018 Agenda 6 m 1 O Number: To: Dave Callister, City Manager Prepared by: Lori Sommers, Senior Planner Reviewed by: Barbara Thomson, Planning Manager and Steve Juetten, Community Development Director Approve Water and Sanitary Sewer Assessments for Item: New Wayzata Elementary School for Property located at 18995 54th Avenue North (2018004) 1. ACTION REQUESTED: Adopt attached resolution approving the assessments for water and sanitary sewer for a new Wayzata elementary school. Approval requires a 4/7 vote of the City Council. 2. BACKGROUND: On March 21, 2018, the Planning Commission voted unanimously to recommend approval of the requested site plan. On April 10, 2018, the City Council voted unanimously to recommend approval of the requested site plan. 3. BUDGET IMPACT: Not applicable. 4. ATTACHMENTS: Water and Sanitary Sewer Assessments Resolution Page 1 Water and Sanitary Sewer Assessments for New Wayzata Elementary School Located at 18995 54th Avenue North Area Assessments 21.64 Acres less wetland acres of 0.87 acres = 20.77 net acres Sanitary Sewer — 20.77 acres x $1,240 = $25,754.80 Water — 20.77 acres x $4,605 = $95,645.85 Total Area Assessment = $121,400.65 Page 2 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION ADOPTING ASSESSMENTS FOR WATER AND SANITARY SEWER FOR ISD 284 ELEMENTARY SCHOOL (2018004) WHEREAS, the city has received a Waiver of Assessment Hearing from the property owner of Lot 1 Block 5, The Enclave at Elm Creek, waiving their right to special assessment hearings for trunk water and sanitary sewer and all other appurtenances. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA: Such proposed assessment, a copy of which is attached hereto and made a part hereof, is accepted and shall constitute the special assessment against the lands named therein and each tract of land therein included is found to be benefited by the proposed improvement in the amount of the assessment levied against it. Such assessment shall be payable in equal annual installments extending over a period of 5 years, the first of the installments to be payable on or before the first Monday in January, 2019, and shall bear interest at the rate of 3.22% per annum. To the first installment shall be added interest on the entire assessment calculated from November 1, 2018 to December 31, 2019. To each subsequent installment when due shall be added interest for one year on all unpaid installments. 3. The owner of any property so assessed may make an interest free principal prepayment prior to certification of the assessment to the County Finance Director. Prepayments of the assessment on such property must be received by October 31, 2018. 4. The Clerk shall forthwith transmit a certified duplicate of this assessment to the County Finance Director to be extended on the proper tax lists of the County and such assessments shall be collected and paid over in the same manner as other municipal taxes. 5. The total cost of the improvement assessed by this resolution is $121,400.65. APPROVED by the City Council on this 12th day of June, 2018. Page 3 Resolution No. 2018 - Page 2 of 2 STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on June 12, 2018, with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk Page 4 rp)City of Agenda 6.11 Plymouth Number: i Adding quality to Life To: Dave Callister, City Manager REGULAR COUNCIL MEETING Prepared by: Shawn Drill, Senior Planner Reviewed by: Barbara Thomson, Planning Manager and Steve Juetten, June 12, 2018 Community Development Director Review Deadline: Approve Final Plat, Development Contract and July 7, 2018 Item: Assessments for "Plymouth Reserve" on Property located at 5330 Vicksburg Lane (Serenity on the Green, Inc. — 2017105-F) 1. ACTION REQUESTED: Adopt attached resolutions approving final plat, development contract, and assessments for "Plymouth Reserve" located north of the CP Rail Line and east of Vicksburg Lane. Approval requires a 4/7 vote of the City Council. 2. BACKGROUND: In February 2018, the City Council approved a preliminary plat for "Plymouth Reserve" for 13 single- family lots. At this time, the developer is requesting final plat approval for all 13 lots. The requested final plat is consistent with the approved preliminary plat. The developer is working with SVK Development, LLC (SVK) to take over the project. Because SVK is planning to purchase the site and would construct the development, SVK's name is on the attached development contract. 3. BUDGET IMPACT: Not applicable. 4. ATTACHMENTS: Location Map Applicant's Narrative Preliminary Plat Final Plat Development Contract Resolutions Page 1 2017105-F "Plymouth Reserve" Serenity on the Green, Inc. 5330 Vicksburg Lane Final Plat 400 200 0 400 800 Feet City of Plymouth, Minnesota Page 2 SATHRE,BERISQUIST, INC. 150 SOUTH BROADWAY, WAYZATA, MINNESOTA, 55391 (952) 476-6000 FAX (952) 476-0104 Date: March 6, 2018 Subject: Plymouth Reserve — Final Plat Narrative Prepared For: Serenity on the Green, Inc. Contact: Jake Walesch 612-749-1360 Narrative: The proposed final plat for Plymouth Reserve will consist of 13 single family residential lots. The site is located north of Schmidt Lake Road, to the east of Vicksburg Lane and west of the Plymouth Preserve Development (Please see the final plat application package). The project is proposing rezoning to RSF-3. The construction will begin in the Spring of 2018 with an anticipated completion date of Fall of 2019. Page 3 017 /z) LOCATION MP Nom: Lot Go°nl'Ifi SW. Falsely Vri[s Zi YNW b RSF-3 S Min tltll-66R M. FyAnsa - 7499 sf f5sb-25fl ."s 6NHI "6 R garzgs 4 lls 25fl PREPARED BY PREPARED FOR 7 LdAMENrD �\ o m scaL..Fa, e ORAw1NGNMnE BV REYgONS 3113E QNCLDgNG CDPTSNG.GISTHEiVTION,—RCCNV£VP"CE0.F CERTFYTHATTHISPLAN ORSPECP1CFnDN WA9 CTTT PROJECTND. FlLEN0. INFORnunOW OTTWSP(tOOUCTIssTWrnrFRpYBrtEO w],HOUJ PREPARED --.---T— "Tg N'D,'�'T' ```� ' - TITLE SHEET VETC SAiH WGWIST, INC's EXPRES$nRinEN PLTHORIZAnDK IIS 0.M AglFTHE E 20,-/t05 ,+ w` r ---- -- -------- - - ------ - sa°num°wunTxl co"snTUTEs uJluEgnnwTE usEaNGSNw.meREe uws DP mEsrnn:DPn9NNEsnrav SATHRE—BERGQUIST, INC. zTMREB°GpLn•1NGOF f�-0.-'n PLYMOUTH, PLYMOUTH RESERVE ° - -- ---- -- – 19AlEifMPEBERGU4PG °;s„m T _" . _ _ _ -... _ RG nLLEG1T w 1u E f+ESERYESTN£RICHTTO HCLDWf1ILLEGmMAn: a.I �,S. �'�"' N_� L�,�I�� ,9, e{ ,Ea 50VTH eRUSLWAY WAYTATA,RW 5519, (6521 d]65e0a MINNESOTAuDRn uA— RlaNLEDR u¢DRLDsuLnrvD INC.SERENITY ON THE GREEN, 14 APPROVED PRELlM1NARY PLAT Page 4 SHEET INDEX TABLE 4 3 SHEET DIS,Apdcn 2 5 1 Slle Flan 2-3 Flnaf S—t Ran 4-5 Md Sanlla S Waley Main F- 6-7 Flnal S,olm Sewer Plan e Flml Glaring Ran PLYMOUTH s Mn FrosmaCORo-dPian PRESERVE 10-14 cGnsln coon gels Nom: Lot Go°nl'Ifi SW. Falsely Vri[s Zi YNW b RSF-3 S Min tltll-66R M. FyAnsa - 7499 sf f5sb-25fl ."s 6NHI "6 R garzgs 4 lls 25fl PREPARED BY PREPARED FOR 7 LdAMENrD �\ o m scaL..Fa, e ORAw1NGNMnE BV REYgONS 3113E QNCLDgNG CDPTSNG.GISTHEiVTION,—RCCNV£VP"CE0.F CERTFYTHATTHISPLAN ORSPECP1CFnDN WA9 CTTT PROJECTND. FlLEN0. INFORnunOW OTTWSP(tOOUCTIssTWrnrFRpYBrtEO w],HOUJ PREPARED --.---T— "Tg N'D,'�'T' ```� ' - TITLE SHEET VETC SAiH WGWIST, INC's EXPRES$nRinEN PLTHORIZAnDK IIS 0.M AglFTHE E 20,-/t05 ,+ w` r ---- -- -------- - - ------ - sa°num°wunTxl co"snTUTEs uJluEgnnwTE usEaNGSNw.meREe uws DP mEsrnn:DPn9NNEsnrav SATHRE—BERGQUIST, INC. zTMREB°GpLn•1NGOF f�-0.-'n PLYMOUTH, PLYMOUTH RESERVE ° - -- ---- -- – 19AlEifMPEBERGU4PG °;s„m T _" . _ _ _ -... _ RG nLLEG1T w 1u E f+ESERYESTN£RICHTTO HCLDWf1ILLEGmMAn: a.I �,S. �'�"' N_� L�,�I�� ,9, e{ ,Ea 50VTH eRUSLWAY WAYTATA,RW 5519, (6521 d]65e0a MINNESOTAuDRn uA— RlaNLEDR u¢DRLDsuLnrvD INC.SERENITY ON THE GREEN, 14 APPROVED PRELlM1NARY PLAT Page 4 PLYMOUTH RESERVE C-R DOC. NO I E L] X5.05 _ ixcu N89°42'24'W 651.09 zp IT^ ' L -7 3tei - i .(B9N•'2'24-W 188.0 ^V �v a z OUTLOT A I I zI 3 II" w e ce� 4�! 4 is HATCH ou�xncEumuwmras�su[smwtuntus GQ � � �,� I 4 5 I i 3 .dr " ; = N.. I So w I R --L mmmmh�um.� v g al I ve w�.my Z3J rVyIFIL 7 i, ma �o m�bi 52ND PLACE SATHRE-BERGQUIST, INC. ��" .�� _ _ OUTLOT A FINAL PLAT Page 5 I I r HATCH ou�xncEumuwmras�su[smwtuntus � � �,� I 4 n I i 3 .dr R.hI So I R --L mmmmh�um.� v ve w�.my Z3J scu E�xrxn �lrmvmnWc SATHRE-BERGQUIST, INC. aq F� FINAL PLAT Page 5 HATCH ou�xncEumuwmras�su[smwtuntus � � �,� I p So I R --L mmmmh�um.� v scu E�xrxn �lrmvmnWc SATHRE-BERGQUIST, INC. aq F� FINAL PLAT Page 5 DEVELOPMENT CONTRACT (Developer Installed Improvements) PLYMOUTH RESERVE (2017105-F) AGREEMENT dated , 2018, by and between the CITY OF PLYMOUTH, a Minnesota municipal corporation ("City"), and SVK DEVELOPMENT, LLC, a limited liability company (the "Developer"). 1. REQUEST FOR PLAT APPROVAL. The Developer has asked the City to approve a plat for Plymouth Reserve (referred to in this contract as the "plat"). The land is situated in the County of Hennepin, State of Minnesota, and is legally described as: That part of the Northwest Quarter of Section 9, Township 118 North, Range 22, West of the 5t' Principal Meridian, Hennepin County Minnesota, described as follows: Commencing at the Northeast corner of said Northwest Quarter; thence on an assumed bearing of North 89 degrees, 33 minutes, 19 seconds West along the North line of said Northwest Quarter a distance of 1,585 feet to the point of beginning of the land to be described; thence North 89 degrees, 33 minutes, 19 seconds West along said North line a distance of 1,019.07 feet to the Northwest corner of said Northwest Quarter; thence Southerly along the West line of said Northwest Quarter to its intersection with a line 60 feet North of, measured radial to, and parallel with the Northerly right-of-way line of the Soo Line Railroad; thence Easterly and Southeasterly along said parallel line to its intersection with a line bearing South 0 degrees, 26 minutes, 41 seconds West from the point of beginning; thence North 0 degrees, 26 minutes, 41 seconds East a distance of 488.29 feet to the point of beginning, according to the United States Government Survey thereof and situated in Hennepin County, Minnesota. AND An undivided one-sixth (1/6) interest in that part of the Northwest Quarter of Section 9, Township 118 North, Range 22, Hennepin County, Minnesota described as follows: Commencing at the intersection of the Northeasterly right-of-way line of the Soo Line Railroad and the East line of said Northwest Quarter; thence Northwesterly along said right-of-way line a distance of 152.38 feet to the point of beginning; thence Northeasterly along a line radial to said right-of-way line to its intersection with a line 60 feet Northeasterly of, measured radial to, and parallel with said right-of-way line; thence Northwesterly along said parallel line a distance of 393.81 feet; thence Northeasterly deflecting to the right 90 degrees and distance of 30 feet; thence Northwesterly deflecting to the left 90 degrees a distance of 100 Page 6 feet; thence Southwesterly deflecting to the left 90 degrees a distance of 30 feet to said parallel line; thence Northwesterly along said parallel line to its intersection with the West line of said Northwest Quarter; thence Southerly along said West line to the Northerly right-of-way line of said Soo Line Railroad; thence Easterly and Southeasterly along said right-of-way line to the point of beginning. 2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the plat on condition that the Developer enter into this contract, furnish the security required by it, and record the plat with the county recorder or registrar of titles within 180 days after the City Council approves the final plat. 3. RIGHT TO PROCEED. Unless separate written approval has been given by the City, within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the city clerk, 2) the necessary security has been received by the City, and 3) the plat has been recorded with the Hennepin County Recorder's Office. 4. CHANGES IN OFFICIAL CONTROLS. For two years from the date of this contract, no amendments to the City's comprehensive plan or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved final plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this contract to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City's comprehensive plan, official controls, platting or dedication requirements enacted after the date of this contract. 5. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this contract. If the plans vary from the written terms of this contract, the written terms shall control. The plans are: Plan A - Plat Plan B - Final Grading, Drainage and Erosion Control Plan Plan C - Tree Preservation and Reforestation Plan Plan D - Plans and Specifications for Public Improvements Plan E - Street Lighting Plan Plan F - Landscape Plan Plan G - Permanent Traffic Control Plan 6. IMPROVEMENTS. The Developer shall install and pay for the following: A. Streets B. Sanitary Sewer C. Watermain D. Surface Water Facilities (pipe, ponds, rain gardens, etc.) E. Grading and Erosion Control F. Sidewalks/Trails G. Street Lighting —2— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 7 H. Underground Utilities I. Street Signs and Traffic Control Signs J. Landscaping Required by Section 21130.03 of the Zoning Ordinance K. Tree Preservation and Reforestation L. Wetland Buffers M. Monuments Required by Minnesota Statutes N. Miscellaneous Facilities The improvements shall be installed in accordance with the City's subdivision regulations and the City's engineering guidelines/standard detail specifications. The Developer shall submit plans and specifications which have been prepared by a competent registered professional engineer to the City for approval by the city engineer or designee. The Developer shall instruct its engineer to provide full-time field inspection personnel in order for the Developer's engineer to be able to certify that the construction work meets the approved City standards as a condition of City acceptance. In addition, the City may, at the City's discretion and at the Developer's expense, have one or more City inspectors and a soil engineer inspect the work on a full or part-time basis. The Developer, its contractors and subcontractors, shall follow all instructions received from the City's inspectors. The Developer and/or the Developer's engineer shall provide for on-site project management. The Developer's engineer is responsible for design changes and contract administration between the Developer and the Developer's contractor. The Developer or his or her engineer shall schedule a pre -construction meeting at a mutually agreeable time at City Hall with all parties concerned, including the City staff, to review the program for the construction work. All labor and work shall be done and performed in the best and most workmanlike manner and in strict conformance with the approved plans and specifications. No deviations from the approved plans and specifications will be permitted unless approved in writing by the city engineer or designee. The Developer agrees to furnish to the City a list of contractors being considered for retention by the Developer for the performance of the work required by the contract. The Developer shall not do any work or furnish any materials not covered by the plans and specifications and special conditions of this contract, for which reimbursement is expected from the City, unless such work is first approved in writing by the city engineer or designee. 7. ADMINISTRATION OF DEVELOPMENT CONTRACT. The Developer shall provide to the City a cash escrow to pay for the costs of administering the development contract. Administrative costs include but are not limited to preparation of the contract, City recording fees for documents required as part of the development, monitoring of construction observation, consultation with the Developer and his/her engineer on status or problems regarding the project, plan review, coordination for testing, periodic and final inspections and acceptance, project monitoring and inspections during warranty periods, and processing requests for reduction or release of security, for all public improvements covered by the development contract. The cash escrow deposit shall be $12,975 (calculated at 3% of the estimated cost of proposed public improvements, as shown in the Summary of Security Requirements). If, at any time prior to completion of the development contract administration process, the balance in the cash escrow account is depleted to less than 10% of the originally required cash escrow amount, the Developer —3— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 8 shall deposit additional funds in the cash escrow account as determined by the City. Any balance remaining in the cash escrow account upon completion of the development contract administration process shall be returned to the Developer after all claims and charges thereto have been deducted. 8. CONTRACTORS/SUBCONTRACTORS. City Council members, City employees, and City Planning Commission members, and corporations, partnerships, and other entities in which such individuals have greater than a 25% ownership interest or in which they are an officer or director may not act as contractors or subcontractors for the public improvements identified in Paragraph 6 above. 9. PERMITS. The Developer shall obtain or require its contractors and subcontractors to obtain all necessary permits, including but not limited to: • Hennepin County for sewage system abandonment • Minnesota Department of Health for watermains and well abandonment • National Pollutant Discharge Elimination System permits • Minnesota Pollution Control Agency for sanitary sewer and hazardous material removal and disposal • Metropolitan Council Environmental Services for sanitary sewer connections • Watershed permits • City of Plymouth building demolition, and building permits 10. TIME OF PERFORMANCE. The Developer shall install all required public improvements by October 31, 2018, with the exception of the final wear course of asphalt on streets. Final wear course placement will be allowed in a new housing development only after one freeze — thaw cycle and after a certificate of occupancy has been issued for 75% of the dwelling units. An inspection of the roadway will be performed by the city engineer or designee prior to wear course placement. From this inspection, any deficiencies or damage to the street, sidewalk and curb will be noted and will need to be corrected prior to the placement of the wear course. 11. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 12. CONSTRUCTION PARKING/STAGING. Construction parking and staging shall occur on the site of the plat. 13. GRADING PLAN. The plat shall be graded in accordance with the approved Grading, Drainage and Erosion Control Plan (Plan B). The plan shall conform to City of Plymouth standards. The Developer shall have the responsibility for site grading through completion of the project including installation of sod, trees and required landscaping, as addressed under the Warranty section of this agreement. —4— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 9 Within 30 days after completion of the grading, the Developer shall provide the City with a "record" grading plan certified by a registered land surveyor or engineer indicating that all ponds, swales, and ditches have been constructed on public easements or land owned by the City. The "record" plan shall contain site grades and field verified elevations of the following: a) cross sections of ponds; b) location and elevations along all swales, emergency overflows, wetlands, wetland mitigation areas if any, ditches, locations and dimensions of borrow areas/stockpiles; c) lot corner elevations and house pads; and d) top and bottom of retaining walls. All lots with house footings placed on fill must be monitored and constructed to meet or exceed FHA/HUD 79G specifications. The Developer must certify that this has been done correctly. Prior to City acceptance of the grading improvements and a full release of financial sureties, the Developer shall provide the City with final "record" plans, in accordance with the City's most recent Engineering Guidelines and the Developer shall verify that all final grades, after house construction and final lot grading, meet the approved grading plan. 14. EROSION CONTROL. Prior to initiating site grading, the Erosion Control Plan (Plan B) shall be implemented by the Developer and inspected and approved by the City. Erosion control practices must comply with the Minnesota Pollution Control Agency's best management practices. The City may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded within 14 days after the completion of the work or in an area that is inactive for up to 14 days unless authorized and approved by the city engineer in writing. Except as otherwise provided in the erosion control plan, seed shall be in accordance with the City's current seeding standards. All seeded areas shall be fertilized, mulched, and disc - anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule or supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within ten days, the City may draw down the security to pay any costs. No development, utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance with the approved erosion control plan. 15. STREET MAINTENANCE DURING CONSTRUCTION. The Developer shall be responsible for all street maintenance until the streets are accepted by the City. Warning signs shall be placed when hazards develop in streets to prevent the public from traveling on same and to direct attention to detours. If and when streets become impassable, such streets shall be barricaded and closed. In the event residences are occupied prior to completing streets, the Developer shall maintain a smooth surface and provide proper surface drainage to ensure that the streets are passable to traffic and emergency vehicles. The Developer shall be responsible for keeping streets within and without the subdivision swept clean of dirt and debris that may spill, track, or wash onto the street from the Developer's operation. The Developer may request, in writing, that the City keep the —5— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 10 streets open during the winter months by plowing snow from the streets prior to final acceptance of said streets if all of the following conditions are meet and verified by the City by October 1St The street has concrete curb and is paved with first lift of asphalt. At least one house on the street is occupied. All the manholes and valve boxes (iron) is set below the paved surface so not to cause damage to the snow removal equipment. If any one of these conditions is not met by October 1St snow removal for the entire season will be the responsibility of the developer. If the conditions are not met, the developer shall be responsible for plowing all streets within the development in accordance with the City's Snow Removal Policy and shall be completed within 12 hours after snowfall has ended. If the Developer does not comply with the policy or if the streets are not plowed within the specified time, the City will plow the streets and bill the Developer plus a penalty of $500 each time the City plows the streets. If the Developer does not reimburse the City for any cost the City incurred for such work within ten days, the City may draw down the security to pay any costs. The City shall not be responsible for repairing damage in the development because of snow plowing operations. Providing snow plowing service does not constitute final acceptance of the streets by the City. The Developer shall contract for street cleaning within and immediately adjacent to the development. At a minimum, scraping and sweeping shall take place on a weekly basis. A copy of this contract shall be approved by the City before grading is started. The contract shall provide that the City may direct the contractor to clean the streets and bill the Developer. 16. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction required by this contract, the improvements lying within public easements or right-of-way shall become City property. Prior to acceptance of the improvements by the City, the Developer must furnish the following affidavits: - Contractor's certificate - Engineer's certificate - Land surveyor's certificate - Developer's certificate The above affidavits shall certify that all construction has been completed in accordance with the terms of this contract. Prior to City acceptance of public improvements and a full release of financial sureties, the Developer shall provide the City with final "record" plans, in accordance with the City's most recent Engineering Guidelines. Upon City receipt and verification of the affidavits, and upon receipt of "record" plans acceptable to the City, the city engineer will accept the completed public improvements. —6— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 11 No more than six months prior to turnover of improvements to a Homeowners Association (HOA), the developer shall request a final inspection of such improvements. Final approval of such improvements shall occur prior to HOA turnover. A portion of the security, as determined by the City Engineer, provided under Section 19 shall not be released until final approval and proof of transfer from Developer to HOA. 17. PARK DEDICATION. The Developer shall pay a cash contribution of $17,795 in satisfaction of the City's park dedication requirements. The charge was calculated in accordance with Section 528 of the City's subdivision regulations. The cash fee shall be payable prior to the City's release of the signed final plat mylars. The developer is being credited for 0.61 acres of park/trail land dedication for Outlot A. 18. WATERMAIN. This plat is subject to a trunk watermain special assessment under Minnesota Statutes Chapter 429. The assessment rate is adjusted annually. The 2018 rate is $4,605 per acre. If the development contract is signed by the Developer and City in 2018, the assessment amount is calculated as follows: 11.55 acres minus 1.07 acres of wetland minus 0.74 acres of Vicksburg right of way minus 2.49 acres of Outlot/Future Lot area = 7.25 acres x $4,605 per acre = $33,386.25. If the development contract is signed in another year, that year's per acre rate will be used in the calculation. The assessment will be divided evenly among the lots and blocks in the final plat. The assessment will be spread over five years at 3.22% interest on the unpaid balance. The assessment shall be deemed adopted on the date this contract is signed by the City. The Developer waives any and all procedural and substantive objections to the special assessment, including but not limited to, hearing requirements and any claim that the assessment exceeds the benefit to the property. The Developer waives any appeal rights otherwise available pursuant to M.S.A. 429.081. 19. SANITARY SEWER. This plat is subject to a lateral sanitary sewer special assessment under Minnesota Statutes Chapter 429. The assessment rate is adjusted annually. The 2018 rate is $1,240 per acre. If the development contract is signed by the Developer and City in 2018, the assessment amount is calculated as follows: 11.55 acres minus 1.07 acres of wetland minus 0.74 acres of Vicksburg right of way minus 2.49 acres of Outlot/Future Lot area = 7.25 acres x $1,240 per acre = $8,990.00. If the development contract is signed in another year, that year's per acre rate will be used in the calculation. The assessment will be divided evenly among the lots and blocks in the final plat. The charge will be spread over five years at 3.22% interest on the unpaid balance. The assessment shall be deemed adopted on the date this contract is signed by the City. The Developer waives any and all procedural and substantive objections to the special assessment, including but not limited to, hearing requirements and any claim that the assessment exceeds the benefit to the property. The Developer waives any appeal rights otherwise available pursuant to M.S.A. 429.081. An extra depth pipe sanitary sewer is needed in Shenandoah Lane and 52nd Place. The location of this is Shenandoah Lane starting about 200 feet north of 52nd Place south to 52nd Place and on 52nd Place from Shenandoah Lane west to the end of the project. The developer shall be reimbursed for the extra depth of this segment of sanitary sewer. The estimated City's portion of the extra depth is $62,892. —7— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 12 20. BUILDING PERMITS/CERTIFICATES OF OCCUPANCY. A. No building permits shall be issued until the final plat is recorded, the streets (including curb and gutter installation) needed for access to lots where permits are requested are paved with the first lift of asphalt, and the sewer and water service utilities are tested and approved by the city engineer/designee. B. Prior to issuance of building permits, wetland buffer monuments shall be placed in accordance with the City's zoning ordinance. Specifications for the monuments are available from the Community Development Department. C. Prior to issuance of building permits, written certification of the grading for the block where the building is to be located must be provided to the City. D. Breach of the terms of this contract by the Developer, including nonpayment of billings from the City, shall be grounds for denial of building permits, including lots sold to third parties, and the halting of all work in the plat. E. If building permits are issued prior to the acceptance of public improvements, the Developer assumes all liability and costs resulting in delays in completion of public improvements and damage to public improvements caused by the City, Developer, their contractors, subcontractors, materialmen, employees, agents, or third parties. No sewer and water connection permits may be issued until the streets needed for access have been paved with a bituminous surface and the utilities are tested and approved by the city engineer or designee. 21. STREET REGULATORY SIGNS/TRAFFIC CONTROL SIGNS. Street name signs shall be installed by the Developer. The signs shall be placed at all intersections or at such other locations as determined by the city engineer or designee. All street name signs must be installed prior to final building inspection approval. The Developer shall install traffic control signs in accordance with the plan approved by the city engineer and Minnesota Manual of Uniform Traffic Control Devices (MMUTCD). All signs must be installed prior to final building inspection approval or earlier if necessary as determined by the city engineer. 22. RESPONSIBILITY FOR COSTS. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the plat, including but not limited to legal, planning, engineering and inspection expenses incurred in connection with approval and acceptance of the plat, the preparation of this contract, review of construction plans and documents, and all costs and expenses incurred by the City in monitoring and inspecting development of the plat. B. The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or expenses —8— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 13 which the City may pay or incur in consequence of such claims, including attorneys' fees. C. The Developer shall reimburse the City for costs incurred in the enforcement of this contract, including engineering and attorneys' fees. D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty is attached, all special assessments referred to in this contract. This is a personal obligation of the Developer and shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this contract within 30 days after receipt. Bills not paid within 30 days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as but not limited to sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. G. The Developer shall be responsible for all real property taxes payable in 2018 on Outlot A. Additionally, if Outlot A is deeded to the City on or after July 1, 2018, the Developer shall be responsible for all real property taxes payable in 2019 on Outlot A. 23. SPECIAL PROVISIONS. The following special provisions shall apply to plat development: A. The Developer shall install an eight -foot wide city trail on and between Lots 5 and 6 of Block 1. The Developer shall be responsible for grading and sub -base preparation costs of said trail segment. The City shall be responsible for the pavement cost of said trail segment. Upon completion and City acceptance of said trail segment, the Developer may submit a receipt for trail pavement cost to the City, and the City shall reimburse the Developer for that cost. Construction of said trail segment may stop/dead-end where it abuts Outlot A. B. The Developer shall install a temporary turnaround on the west end of 52nd Place North until it is extended to the north with the platting of the Dotseth parcels. Before the City signs the final plat, the Developer shall furnish the City an appropriately executed temporary turnaround easement, in recordable form. C. The Developer shall post a security for the final placement of all subdivision iron monuments. The security was calculated as shown in the Summary of Security Requirements at $100.00 per iron. The security will be held by the City until the Developer's land surveyor certifies that all irons have been set following site grading and utility and street construction. In addition, the certificate of survey must also include a certification that all irons for a specific lot have either been found or set prior to the issuance of a building permit for that lot. D. The Developer must obtain a sign permit from the City building official prior to installation of any subdivision identification signs. E. The Developer shall supply a complete set of the approved construction plans in an AutoCAD.DWG electronic file format before the preconstruction conference. —9— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 14 F. The Developer shall include the "City of Plymouth's Standard Detail Specifications" (all applicable sections) in the contract documents of their improvement project. G. Other requirements: Prior to recording the final plat, the Developer shall: a. Remove the existing structures from the site. Demolition permits are required for removal of existing structures that contain over 120 square feet. b. Execute the development contract and provide the related financial guarantees and fees. c. Receive City approval of final construction plans. d. Dedicate and convey Outlot A to the City by warranty deed, free and clear of any and all encumbrances. e. Pay the required park dedication fee. f. Provide a trail easement for the 8 -foot wide city trail to be constructed on and between Lots 5 and 6 of Block 1. The easement shall extend a minimum of four feet beyond the outer edges of the paved trail surface. g. Work with the owner of Lot 1, Block 1, Plymouth Preserve to incorporate Outlot B (remnant east of Shenandoah Lane) into that lot and work to eliminate or minimize the proposed retaining wall along the east side of that outlot. h. Revise the plans to remove the retaining wall from the drainage/utility easement between Lots 1 and 2, Block 2. i. Provide all required easements and agreements, including but not limited to an easement for the temporary turn -around. j. Obtain any required watershed approval. k. Submit homeowner's association documents for City review. The homeowner's association documents shall address: a) responsibilities for maintenance, repair, and replacement of developer -installed retaining walls, wetland buffers, buffer monuments, sidewalks, private trails, private play features, subdivision signage, and other similar or common features, and b) clearing of native vegetation within wetland buffers. 2. An easement shall be maintained through the site (from the shared private drive along the railroad tracks to 52nd Place/Shenandoah Lane) that provides access to the existing homes at 5364 and 5370 Vicksburg Lane, until such time as those properties are developed or alternate access is established. 3. Prior to commencement of grading operations, the developer shall install and request inspection of tree preservation fencing and silt/erosion control fencing. 4. Prior to issuance of building permits for lots abutting wetlands, permanent wetland buffer monument signs shall be installed pursuant to ordinance requirements. 5. The developer shall notify potential buyers and buyers at closing about the future northerly roadway extension of 52nd Place/Upland Lane. 6. The developer shall post a sign near the terminus of 52nd Place to notify passersby that the street will be extended in the future. —10— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 15 7. Standard Conditions: a. No building permits shall be issued until the final plat is recorded, the streets (including curb and gutter installation) needed for access to lots where permits are requested are paved with the first lift of asphalt, and the sewer and water service utilities are tested and approved by the City Engineer/designee. b. Development standards and setbacks for this plat shall comply with the RSF-3 zoning standards. No variances are granted or implied. c. Any signage shall require separate permits and shall comply with the City's sign regulations. d. If the required sidewalks are not installed when the streets are installed, no building permits shall be issued for lots abutting the future sidewalk unless a separate sidewalk agreement is provided for each affected lot. e. Fire flow calculations shall be submitted. f. An approved looped water main system is required. g. Compliance with the City's tree preservation and reforestation regulations. h. Removal of all hazardous trees at the owner's expense. i. No trees shall be planted in the boulevard. 24. MISCELLANEOUS. A. The Developer may not assign this contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. B. A building permit is required for any retaining wall that would be 48 inches in height or higher, and a fence/wall permit is required for any retaining wall that would be less than 48 inches in height. Additionally, a fence with a minimum height of three feet shall be installed at the top of any retaining wall that exceeds four feet in height, and at the top of any tiered retaining wall that requires a building permit. Retaining walls that require a building permit shall be constructed in accordance with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of Minnesota, as approved by the building permit. Following construction of any retaining wall that requires a building permit and prior to issuance of a certificate of occupancy for a lot where the retaining wall is located, a certification signed by the design engineer shall be filed with the Building Official evidencing that the retaining wall was constructed in accordance with the approved plans and specifications. C. The Developer shall submit appropriate legal documents regarding homeowner association documents, covenants and restrictions, as reviewed by the city attorney for consistency with the City's official controls and conditions of approval shall be filed with the final plat. If the documents are not consistent with the City's official controls and conditions of approval, the documents shall be amended to make them consistent prior to recording the final plat and homeowner association documents. —11— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 16 D. The Developer shall take out and maintain or cause to be taken out and maintained until 6 months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of the Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $200,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given written notice of the cancellation of the insurance per the terms of the policy. E. Third parties shall have no recourse against the City under this contract. F. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this contract. G. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this contract shall not be a waiver or release. H. This contract shall run with the land and may be recorded against the title to the property. The Developer covenants with the City, its successors and assigns, that the Developer has fee title to the property being final platted and/or has obtained consents to this contract, in the form attached hereto, from all parties who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants. L Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to the City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. J. The Developer represents to the City that the plat complies with all city, county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision regulations, zoning ordinances, and environmental regulations. If the City determines that the plat does not comply, the City may, at its option, refuse to allow construction or development work in the plat until the Developer does comply. Upon the City's demand, the Developer shall cease work until there is compliance. —12— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 17 25. DEVELOPER'S DEFAULT. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as determined by the City, is first given notice of the work in default, not less than 48 hours in advance. This contract is a license for the City to act, and it shall not be necessary for the City to seek a court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 26. WARRANTY. The Developer warrants all improvements required to be constructed by it pursuant to this contract against poor material and faulty workmanship. The Developer shall submit or maintain a letter of credit for 25% of the amount of the original cost of the following improvements: A. The required warranty period for materials and workmanship for utilities including public sanitary sewer, storm sewer, and water mains shall be 2 years from the date of final written City acceptance of the work. B. The required warranty period for all work relating to street construction, including concrete curb and gutter, sidewalks and trails, materials and equipment shall be 1 year from the date of final written City acceptance. C. The required warranty period for grading, sod, trees, and landscaping is one growing season following installation. —13— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 18 27. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms of this contract, payment of special assessments, payment of the costs of all public and private improvements, and construction of all public and private improvements, the Developer shall furnish the City with a letter of credit, in a format acceptable to the City, from a bank, cash escrow or a combination cash escrow and letter of credit ("security") for $716,688. The amount of the security was calculated as follows: ESTIMATED COSTS (1) Developer installed public improvements. City to own and maintain after development completed. (2) Private. Property owner and/or property owner's association to maintain after development completed. (3) Developer may provide a separate letter of Credit for Erosion Control & Tree Preservation/Protection. This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be subject to the approval of the City Manager. The City may draw down the security, without notice, for any violation of the terms of this contract or if the security is allowed to lapse prior to the end of the required term. If the required public -14- P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 19 Developer ITEM Installed (1) Private (2) Total Street Construction: 170,100 170,100 Sanitary Sewer System: 113,600 113,600 Watermain System: 73,500 73,500 Storm Sewer System: 65,800 65,800 Boulevard and Drainage Swale Sod: 3,900 3,900 Retaining Walls: 10,300 10,300 Pond Construction: 10,000 10,000 Filtration Basin: 18,700 18,700 Street and Traffic Control Signs: 1,000 1,000 Buffer Posts & Signs: 500 500 Sidewalk Improvements: 24,700 24,700 Trail Improvements: 8,500 8,500 Landscaping: 20,300 20,300 Street Lighting: 6,800 6,800 Erosion Control: 13,500 13,500(3) Site Grading & Drainage Improvements: 83,700 83,700 Setting Iron Monuments: 4,800 4,800 Removal of Existing Temporary Turn -around on 52nd Place North: 1,500 1,500 Tree Preservation/Protection: 32,400 32,400 (3) SUB -TOTAL: 432,500 231,100 663,600 Design, Admin., Insp., As-Builts (8%): 34,600 18,488 53,088 TOTAL: 467,100 249,588 $716,688 (1) Developer installed public improvements. City to own and maintain after development completed. (2) Private. Property owner and/or property owner's association to maintain after development completed. (3) Developer may provide a separate letter of Credit for Erosion Control & Tree Preservation/Protection. This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be subject to the approval of the City Manager. The City may draw down the security, without notice, for any violation of the terms of this contract or if the security is allowed to lapse prior to the end of the required term. If the required public -14- P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 19 improvements are not completed at least 30 days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the proceeds shall be used to cure the default. Upon receipt of proof satisfactory to the city engineer or designee that work has been completed and financial obligations to the City have been satisfied, with city engineer or designee approval the security may be reduced from time to time by 75% of the financial obligations that have been satisfied. Twenty-five percent (25%) of the amounts certified by the Developer's engineer shall be retained as security until: (1) all improvements have been completed; (2) iron monuments for lot corners have been installed; (3) all financial obligations to the City satisfied; (4) the required "record" plans have been received by the City; (5) a warranty security is provided; and (6) the public improvements are accepted by the City. 28. SUMMARY OF CASH REQUIREMENTS. The following is a summary of the cash requirements under this contract which must be furnished to the City at the time of final plat approval: Park Dedication $17,795 *Erosion Control (EC) Refundable Cash Deposit $1,000 Administration of Development Contract Escrow $12,975 TOTAL CASH REQUIREMENTS LEVIED: $31,770 *EC deposit may be paid separately prior to tree clearing and/or grading operations. 29. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the following address: SVK Development, LLC Attn: Scott V. Kevitt, Chief Manager 3335 Pennsylvania Avenue Crystal, MN 55427 The Developer shall notify the City within five days of a change of address. Notices to the City shall be in writing and shall be either hand delivered to the city manager, or mailed to the City by certified mail in care of the City Manager at the following address: Plymouth City Hall 3400 Plymouth Boulevard Plymouth, MN 55447 —15— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 20 CITY OF PLYMOUTH: (SEAL) AND STATE OF MINNESOTA ) ( ss. COUNTY OF HENNEPIN ) Kelli Slavik, Mayor Dave Callister, City Manager The foregoing instrument was acknowledged before me this day of , 2018, by Kelli Slavik and by Dave Callister, the Mayor and City Manager of the City of Plymouth, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. DEVELOPER: ME Its: STATE OF MINNESOTA ) ( ss. COUNTY OF HENNEPIN ) NOTARY PUBLIC The foregoing instrument was acknowledged before me this 2018, by on its behalf DRAFTED BY: CITY OF PLYMOUTH 3400 Plymouth Boulevard Plymouth, MN 55447 of —16— NOTARY PUBLIC day of the P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 21 FEE OWNER CONSENT TO DEVELOPMENT CONTRACT , fee owners of all or part of the subject property, the development of which is governed by the foregoing development contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by them. Dated this day of By: Its: STATE OF MINNESOTA ) ( ss. COUNTY OF HENNEPIN ) 2018. The foregoing instrument was acknowledged before me this day of , 2018, by DRAFTED BY: CITY OF PLYMOUTH 3400 Plymouth Boulevard Plymouth, MN 55447 NOTARY PUBLIC —17— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 22 MORTGAGE CONSENT TO DEVELOPMENT CONTRACT , which holds a mortgage on the subject property, the development of which is governed by the foregoing development contract, agrees that the development contract shall remain in full force and effect even if it forecloses on its mortgage. Dated this day of Its: STATE OF MINNESOTA ) ( ss. COUNTY OF HENNEPIN ) 2018. The foregoing instrument was acknowledged before me this day of , 2018, by DRAFTED BY: CAMPBELL KNUTSON CITY OF PLYMOUTH 3400 Plymouth Boulevard Plymouth, MN 55447 NOTARY PUBLIC —18— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 23 CONTRACT PURCHASER CONSENT TO DEVELOPMENT CONTRACT 'which/who has a contract purchaser's interest in all or part of the subject property, the development of which is governed by the foregoing development contract, hereby affirms and consents to the provisions thereof and agrees to be bound by the provisions as the same may apply to that portion of the subject property in which there is a contract purchaser's interest. Dated this day of , 2018. Its: STATE OF MINNESOTA ) )ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this day of 2018, by DRAFTED BY: CITY OF PLYMOUTH 3400 Plymouth Boulevard Plymouth, MN 55447 NOTARY PUBLIC —19— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 24 (BANK LETTERHEAD) IRREVOCABLE LETTER OF CREDIT Letter of Credit No.: Date: TO: City of Plymouth 3400 Plymouth Boulevard Plymouth, MN 55447 RE: (*Insert project name/address) Dear Sir or Madam: We hereby issue, for the account of (*insert Developer Name/Address) and in your favor, our Irrevocable Letter of Credit in the amount of $ , available to you by your draft drawn on sight at the undersigned bank. Any drafts drawn under this Letter of Credit must: a) Bear the clause, "Drawn under Letter of Credit No. of (insert Bank name), dated , 20 "; b) Name the City of Plymouth as beneficiary; and c) Be presented for payment at (*insert Bank name & address), on or before 4:00 p.m. on November 30, 20 This Letter of Credit shall automatically renew for successive one-year terms unless, at least sixty (60) days prior to the next annual renewal date, the Bank delivers written notice to the Plymouth Community Development Department that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least sixty (60) days prior to the next annual renewal date addressed as follows: Plymouth Community Development Department, Plymouth City Hall, 3400 Plymouth Boulevard, Plymouth, MN 55447, and is actually received by the Community Development Department at least sixty (60) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 600. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation. MM Its —20— P:\Organization\Council\Council Staff Reports\2018\061218\z6l l Plymouth Reserve-4.docx Page 25 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION APPROVING FINAL PLAT AND DEVELOPMENT CONTRACT FOR "PLYMOUTH RESERVE" FOR PROPERTY LOCATED NORTH OF THE CP RAIL LINE AND EAST OF VICKSBURG LANE (2017105-F) WHEREAS, Serenity on the Green, Inc. has requested approval of a final plat for "Plymouth Reserve" consisting of 13 single-family lots for property presently legally described as follows: That part of the Northwest Quarter of Section 9, Township 118 North, Range 22, West of the 5th Principal Meridian, Hennepin County Minnesota, described as follows: Commencing at the Northeast corner of said Northwest Quarter; thence on an assumed bearing of North 89 degrees, 33 minutes, 19 seconds West along the North line of said Northwest Quarter a distance of 1,585 feet to the point of beginning of the land to be described; thence North 89 degrees, 33 minutes, 19 seconds West along said North line a distance of 1,019.07 feet to the Northwest corner of said Northwest Quarter; thence Southerly along the West line of said Northwest Quarter to its intersection with a line 60 feet North of, measured radial to, and parallel with the Northerly right-of-way line of the Soo Line Railroad; thence Easterly and Southeasterly along said parallel line to its intersection with a line bearing South 0 degrees, 26 minutes, 41 seconds West from the point of beginning; thence North 0 degrees, 26 minutes, 41 seconds East a distance of 488.29 feet to the point of beginning, according to the United States Government Survey thereof and situated in Hennepin County, Minnesota. _►o An undivided one-sixth (1/6) interest in that part of the Northwest Quarter of Section 9, Township 118 North, Range 22, Hennepin County, Minnesota described as follows: Commencing at the intersection of the Northeasterly right-of-way line of the Soo Line Railroad and the East line of said Northwest Quarter; thence Northwesterly along said right-of-way line a distance of 152.38 feet to the point of beginning; thence Northeasterly along a line radial to said right-of-way line to its intersection with a line 60 feet Northeasterly of, measured radial to, and parallel with said right-of-way line; thence Northwesterly along said parallel line a distance of 393.81 feet; thence Northeasterly deflecting to the right 90 degrees and distance of 30 feet; thence Northwesterly deflecting to the left 90 degrees a distance of 100 feet; thence Southwesterly deflecting to the left 90 degrees a distance of 30 feet to said parallel line; thence Northwesterly along said parallel line to its intersection with the West line of said Northwest Quarter; thence Southerly along said West line to the Northerly right-of-way line of said Soo Line Railroad; thence Easterly and Southeasterly along said right-of-way line to the point of beginning. Page 26 Resolution 2018 - File 2017105-F Page 2 WHEREAS, City staff has prepared a development contract covering the improvements related to said plat. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that it should and does approve the request by Serenity on the Green, Inc. for a final plat for Plymouth Reserve; and FURTHER, that the development contract for said plat be approved, and that upon prior execution of the development contract by the developer, the Mayor and City Manager are authorized to execute the development contract on behalf of the City; and FURTHER, that the following conditions apply to said plat: 1. The final plat for Plymouth Reserve is approved in accordance with the plans received by the City on May 25, 2018, except as may be amended by this resolution. 2. Approval of the final plat is contingent upon the vacation of utility and/or drainage easements within the plat. 3. Prior to commencement of tree removal or grading operations, the Developer shall install and request inspection of tree preservation fencing and silt/erosion control fencing. 4. Prior to recording the final plat, the Developer shall: a) Execute the development contract and provide the related financial guarantees and fees. b) Receive City approval of final construction plans. c) Obtain any required watershed approval. d) Remove existing structures from the site. Demolition permits are required for removal of existing structures that contain over 120 square feet. e) Dedicate and convey Outlot A to the City by warranty deed, free and clear of any and all encumbrances. f) Pay the required park dedication fee. g) Work with the owner of Lot 1, Block 1, Plymouth Preserve to incorporate Outlot B (remnant east of Shenandoah Lane) into that lot and work to eliminate or minimize the proposed retaining wall along the east side of that outlot. h) Revise the plans to remove the retaining wall from the drainage/utility easement between Lots 1 and 2, Block 2, or provide an encroachment agreement for the retaining wall. i) Provide a trail easement for the 8 -foot wide city trail to be constructed on and between Lots 5 and 6 of Block 1. The easement shall extend a minimum of four feet beyond the outer edges of the paved trail surface. j) Provide all required easements and agreements, including but not limited to an easement for the temporary turn -around, and maintenance agreement for the filtration basin. k) Submit homeowner's association documents for City review. The homeowner's association documents shall address: a) responsibilities for maintenance, repair, and replacement of Page 27 Resolution 2018 - File 2017105-F Page 3 developer -installed retaining walls, wetland buffers, buffer monuments, sidewalks, subdivision signage, and other similar or common features, and b) prohibition of structures and the clearing of native vegetation within wetland buffers. 5. Prior to issuance of building permits for lots abutting wetlands, permanent wetland buffer monument signs shall be installed pursuant to ordinance requirements. 6. The developer shall notify potential buyers and buyers at closing about the future northerly roadway extension of 52nd Place/Upland Lane. 7. The developer shall post a sign near the terminus of 52"d Place to notify passersby that the street will be extended in the future. 8. An easement shall be maintained through the site (from the shared private drive along the railroad tracks to 52"d Place/Shenandoah Lane) that provides access to the existing homes at 5364 and 5370 Vicksburg Lane, until such time as those properties are developed or alternate access is established. 9. The Developer shall install an eight -foot wide city trail on and between Lots 5 and 6 of Block 1. The Developer shall be responsible for grading and sub -base preparation costs of said trail segment. The City shall be responsible for the pavement cost of said trail segment. Upon completion and City acceptance of said trail segment, the Developer may submit a receipt for trail pavement cost to the City, and the City shall reimburse the Developer for that cost. Construction of said trail segment may stop/dead-end where it abuts Outlot A. 10. Standard Conditions: a. No building permits shall be issued until the final plat is recorded, the streets (including curb and gutter installation) are paved with the first lift of asphalt, and the sewer and water service utilities are tested and approved by the City Engineer/designee. b. Development standards and setbacks for this plat shall comply with the RSF-3 zoning standards. No variances are granted or implied. c. Any signage shall require separate permits and shall comply with the City's sign regulations. d. If the required sidewalks are not installed when the streets are installed, no building permits shall be issued for lots abutting the future sidewalk unless a separate sidewalk agreement is provided for each affected lot. e. Separate building permits are required for retaining walls 48 inches in height or higher. Additionally, a fence measuring not less than three feet in height shall be installed at the top of retaining walls that exceed four feet in height. f. Fire flow calculations shall be submitted. g. An approved looped water main system is required. h. Provide the total square footage of the largest structure in the proposed development. i. Compliance with the City's tree preservation and reforestation regulations. j. Removal of all hazardous trees at the owner's expense. k. No trees shall be planted in the boulevard. Page 28 Resolution 2018 - File 2017105-F Page 4 I. This approval shall expire two years after the date of approval, unless the property owner or applicant has recorded the final plat, or unless the applicant, with the consent of the property owner, has received prior approval from the City to extend the expiration date for up to one additional year, as regulated under section 512 of City Code. APPROVED by the City Council on this 12th day of June, 2018. STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on June 12, 2018, with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk Page 29 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION ADOPTING ASSESSMENTS FOR WATER AND SANITARY SEWER FOR PLYMOUTH RESERVE (2017105) WHEREAS, the city has received a Waiver of Assessment Hearing from the property owner of Plymouth Reserve waiving their right to special assessment hearings for trunk water and sanitary sewer and all other appurtenances. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA: Such proposed assessment, a copy of which is attached hereto and made a part hereof, is accepted and shall constitute the special assessment against the lands named therein and each tract of land therein included is found to be benefited by the proposed improvement in the amount of the assessment levied against it. Such assessment shall be payable in equal annual installments extending over a period of 5 years, the first of the installments to be payable on or before the first Monday in January, 2019, and shall bear interest at the rate of 3.22% per annum. To the first installment shall be added interest on the entire assessment calculated from November 1, 2018 to December 31, 2019. To each subsequent installment when due shall be added interest for one year on all unpaid installments. 3. The owner of any property so assessed may make an interest free principal prepayment prior to certification of the assessment to the County Finance Director. Prepayments of the assessment on such property must be received by October 31, 2018. 4. The Clerk shall forthwith transmit a certified duplicate of this assessment to the County Finance Director to be extended on the proper tax lists of the County and such assessments shall be collected and paid over in the same manner as other municipal taxes. 5. The total cost of the improvement assessed by this resolution is $42,385.25. APPROVED by the City Council on this 12th day of June, 2018. Page 30 Resolution No. 2018 - Page 2 of 2 STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on June 12, 2018, with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk Page 31 rp)City of Plymouth Agenda 6012 Number: Adding Quality to Life To: Dave Callister, City Manager REGULAR COUNCIL MEETING Prepared by: Shawn Drill, Sr. Planner June 12, 2018 Reviewed b Barb Thomson, Planning Manager and Steve Juetten, y' Community Development Director Approve One -Year Extension of the Preliminary Plat Item: Approved for "Avonlea Place" on Property located at 4465 Vicksburg Lane (Gulova — 2015032) 1. ACTION REQUESTED: Adopt attached resolution approving a one-year extension of the preliminary plat for Avonlea Place, for property located at 4465 Vicksburg Lane. Approval requires a 4/7 vote of the Council. 2. BACKGROUND: In 2015, the Council approved a preliminary plat for a residential development to be called Avonlea Place, consisting of three single-family lots on a roughly 1.6 -acre site. To date, staff has administratively approved two separate one-year extensions. The city code specifies that any additional extensions must be reviewed by the Council. The applicant states that they plan to submit the final plat application and complete the development in 2019. The city sets an expiration period on preliminary plats to help ensure that subdivisions comply with the most recent code amendments. In this case, no applicable code amendments have been adopted since the Avonlea Place preliminary plat was originally approved. Consequently, this subdivision would continue to comply with all current city code regulations. 3. BUDGET IMPACT: Not Applicable. 4. ATTACHMENTS: Location Map Approved Preliminary Plat Resolution No. 2015-199 Approved June 23, 2015 Resolution Page 1 M J i 45t v J O CD 2015032 Kenneth J. Guddal 4465 Vicksburg Lane Preliminary Plat for "Avonlea Place" 200 100 0 200 400 Feet rp)City of Plymouth, Minnesota Page 2 A VONAL EA PLACE 18 / �p1 I RIM-1(13.CB 6 INV -1(08. I I c I � �o\ =v�lo� I zQ / \ I- I � w I m K.M. KEFFELER & R. FUNK / \ _ X10 I I I� o � I Q zz 4565 WESTON LANE N. / \, - - // o0 I IQ wQ _ VICKI R. EGGUM / J I II m I �' w 4555 WESTON LANE N. -5 I� m m oI N EX. GARAGE & CONC. - / I I II I m LO - leis- - - \ I I m o SLAB REMOVED / - - ILn i EX. DRIVEWAY I 0 4o j N REMOVED 1 < <WI D <RCP \_ \ 16-- W I 258.04' @ N 88 °42 '36 " E ° E U raltv ' ---- ----- - -- -- - - -- - ---- -------------------------------------- ------ -- --------------3�/------I------ r _fi �- - -/ -� \y 280o T v - I I II I c�3 BITUMIN0USI DRI E Lo M i c o N c R E T E / �5� /� / N --�/ ------------� I -�- h �oI ----------ST,� -- ----'--7 / EXIST to REMAIN yj 3\ `' x ; / 6 6' ' / / I G.F.E. = 1016.4 o I I \ --- 128.00 ---- / / 1 -- UE / / / ° / / / I I I O � I v N \ \ S I-%�/ UE / / , CONCRETE I I I O O I/ Q \ I / / UE U /- / AC �] GAS JAS i GAS o✓ c I I i I x LOT 1 t// /uE v UE \ B1 - L1 - 13,135 S.F. I / / / ,/ / R B1 - L2 � I^ I I \ \ ( F. B. / Y / l l� / 22, 354 S.F. o I I I I \ F. F. = 1016.50 / • / / / // EXIST to REMAIN > F.F.E. = 1018.0 0 L I ' X GAR. = 1014.50 / / � >- / I / ,� / w/ II II v I ^ II« << EX. CONCRETE z - / ./ ; / / / �.; w / J SLAB REMOVED \ / / / �;<� 110 / II I VWI \ -U o LOT 2\ m vLd � X/ � / (/ \ \ \ I / III II z I w www o / / / I'\\ y II Y Q I m (� l x 1 I �, < - I I I I N o z Q Q v CONLLJ I J QII �I m I/ vs I / i ,( r/ \� I-..-..-..-..-..-..-..-..-.._.. �.-..I III w Q Q < Ln - m I I i \ III y m mw0 r �--..-..-..-.. . ..-..-.....- � II �- m�o I ./ 6'� _ �'� II j II Ian �m Q O �/� / ' %� -� I N IIII I I c� /� x / ; / . • / / - - - I3 0' Setback ' 50' R " . II �I I I 1 ` v=l 0093 U ,, r __ 1 O I a � I o II � NE.INV 1008.7 N.INV=1005.9 Q i /, �/ .h� �• �'� ! LOT 3 I I = L SW INV=1005.1 L B1 - L3 I I I_ m I I j II II(INVERTS PER PLAN) G I 14,977 S.F. 01- 0'�1' -�3�jSIDE L. 0.NE F.F. = 1016.50 II / Im RIcMBN1=0118 SW:INV=100 5.1 GAR. Y 1 1014.50 _( cB /I \ G 0 11 lib RIM= 010.1cK NE.INV=100 5.27 , N.INV=1'005.5 sw.INv=1oo5.o L < 1 11I I 33I I \ 13 I / �9 / RIM=1009.9 V / \ W.INV=992.9 _____�\ ASF < _104d•� _= I III I Q \ , \ NE.INV=992.9 F �/ << -% I I c S.INV=992.9 S � / � -« «-�- SF - N 88 °42 `36 "�- -, �--j \ \ / RIM=1008.0 \_ Q RI =1007.0 « E.INV=1004.1 O ? jQ I I I m N.INV=991.8 \ « " RCP W.INV-1 04.0 0 \c N.INV=991.7 \ \ �� 36 � -}e09 S.INV=991.7 \a \ 11 3 \ / Q I I I I If�I4 IIN o I RIM=1007.0 / / / \ \ \ \ I I =o / c �W.INV=1 NV -11001.2 r J \ / / \ \ K E.INV-1001.5 \ CO RIM -1 005.4 , / / \ \ \ \ I =O m JOYCE SEALINE �° 'j N.INV=1003.5 5 I I I- I \ 4485 WESTIN LANE N.\�°A / S.INV-\l cB :3CB ( \ I I I IIT 1 II RIM -1005.4 I I II\ _1 I 0 NW.INV=1001.9 \ SW.IN\1001.7 - Q • \\ \ CHAD 8c ANDREA NELSON I I II > \ \ \ I IIII \ \ 4470 WESTON LANE N. \IM -1005.4B F.F.E. = 1011.1 \ \ NE.I `=1001.6 NW.INV=1001.6 SITE DATA: EX. ZONING: RSF-2 (SINGLE FAMILY DETACHED 2) GUIDED LAND USE: LA -2 PROPOSED ZONING: RSF-2 (SAME) LEGAL: THE NORTH 225 FEET OF THE EAST 308 FEET OF THE NORTH 1/2 OF THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 17, TOWNSHIP 118, NORTH RANGE 22, WEST OF THE 5TH PRINCIPAL MERIDIAN, ACCORDING TO THE UNITED STATES GOVERNMENT SURVEY THEREOF AND SITUATED IN HENNEPIN COUNTY, MINNESOTA, SUBJECT TO RESTRICTIONS, RESERVATIONS, AND EASEMENTS OF RECORD, IF ANY. DOC. NO. 4137553. AND OUTLOT A AND OUTLOT B, FAWN CREEK, ACCORDING TO THE RECORDED PLAT THEREOF ON FILE AND OF RECORD IN THE OFFICE OF THE COUNTY RECORDER IN AND FOR HENNEPIN COUNTY, MINNESOTA. DOC. NO. 5720076 PROPERTY I.D.: 17-118-22-11-0001 FT. MIN. DESIGNED: IRS 17-118-22-11-0002 FT. MIN. (TYP.) 17-118-22-11-0054 FT. MIN. (ABUTTING AN ARTERIAL) 17-118-22-11-0055 FT. MIN. (LIVING SPACE) PARCEL AREA: 1.63 ACRES (71,093 SF) OWNER & WESTAR DEV. CORP. APPLICANT 14350 27th AVE. N., SUITE C PLYMOUTH, MN 55447 CONTACT: K. JAMES GUDDAL DISTRICT AREA MIN. = 1 AC. MIN. LOT AREA: MIN. LOT WIDTH: MIN. LOT DEPTH SETBACKS: 12,500 SF 80 FT. N/A FRONT REAR REAR SIDE SIDE MAX. BLDG. COVER: 30% MAX. BLDG HGT.: 35 FT. LOT DATA: 0 10 20 40 SCALE IN FEET 25 FT. MIN. DESIGNED: IRS 25 FT. MIN. (TYP.) 50 FT. MIN. (ABUTTING AN ARTERIAL) 10 FT. MIN. (LIVING SPACE) 6 FT. MIN. (GARAGE) LOT NO. AREA (SF) AREA (AC) WIDTH @ SETBACK 1 13,135 0.30 80.00' 2 22,354 0.51 80.33' 3 14,977 0.34 83.22' TOTAL 50,466 1.15 PROPOSED PUBLIC STREET R/W AREA TO BE DEDICATED = 10,333 S.F., (0.24 ACRE.) DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: 6' SIDE I- 6' GARAGE NO SCALE 10, 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, AND ADJOINING RIGHT-OF-WAY LINES AS SHOWN ON THE PLAT. 5 DESIGNED: IRS I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINT NAME: ROBERT L. SWANSON, P.E. SIGNATURE: DATE: APRIL 17, 2015 24094 LICENSE # �I 'I ANDERSON .I ENGINEERING ENGINEERING • ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES • LANDSCAPE ARCHITECTURE Anderson Engineering of Minnesota, LLC 136051st Avenue North Suite 1OO Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com A VO N LE A PLACE ADDITION D I TI 0 N WESTAR DEV. CORP. PLYMOUTH M N ! PRELIMINARY PLAT COMM. NO. 13975 I PLOTTED: 5/18/2015 4 3 DRAWN: CJA AWING N O. C-1 2 1 5/15/15 PER D.R.C./CITY COMMENTS CHECKED BY: xxx NO. DATE DESCRIPTION OF REVISIONS Page 3 LL \ 3 x / o � t v ow 0 P � 1 O V 46 RIM=1013.6NJ=1 008.2 / / \ If -- - - - -�-- 40 - ----- o- �� I \ - _ ---- - 40 -- ------ N - / 1 1I r / a X V a 1 v c� 1017 0 J Z N - -1016- I M I v I 10199 V II U_ 40 NORTH LINE OF THE NORTHEAST QUARTER OF THE NORTHEAST- / 11 13" RCP \ \ QUARTER, SECTION 17, TOWNSHIP 117, RANGE 22 �� 10168 I II o « \ -N88-42'36"E 308.05 -'�' 3 c w w 11 1 UE E FOUND I � X1017 \ 92 8 \ V �/ PK NAIL I , V 9227 �NORTHEAST CORNER OF THE NOR HEAST QUARTER, 9222 9zz1 922 9219 i SECTION 17, TOWNSHIP -117, RANGE 22 3 t 9230 9226 707 V I� I 1 --- \------------------------ T---i------------------------------n 280 -------------;----- D =�i- v ------/----- -------- ------------------- \ 9228 77.0 - i i \y�1----------- 57.3 - / o V 122.5 --------- /---- -O L\ 43'2 BITUMINOUIS DRIVE I I I II I N CONCRETE o SF�ED o h i v V- \ 04 GARAGE FLOOR S L A B O -- M GARAGE � V < ELEVATION=1016.8 FT /� i I N C' \,��A V I O GARAGE FLOOR ELEVATION = 1016.4 FEET / / r O O \ 22.5 -I ------ / - 43.4 - � 33 \--------------------- ---- uE------------;---------------------------- 308 ------ --------- -I ------I I --- --- 28.00 --- _ �� ------ v / I , ° V /� ^ ,/ FIg i �� \ \ /\ 1/ /1/ / / % I/-� UE LT 9267 \ CONCRETE I I 33 -1- i \7078 9232 V �/� L_ i / 717 u Uk L DOOR R G GAS (3A`. I M20�AS x G GAS I /a A \ \ 16 UE c D a GAS \ x '! 9233 10 �i �- UE Q.28.9 V UE J.q-9208 �/ \ \ W ro :' a I 9235 Ile/ 1 _ I, \0 9236 /-� / i \ �l STEPS - Q \' / 1 / / / �� / �� \ R 7 D 9206 V ''i V I U \ I \ 9237 ??9238 IJ / iL- / 20.1 / Of O 1 I ' I ' \ ` \ BUILDING NO. 4465 / m �I > -- \%I /Y\------ 60 - - - - ---- ---- i - \ \ x9239 O14J i 'n BUILDING FOOTPRINT AREA = 2,010 SQUARE FEET Y N '/' I \ 9205 � '701a 1 Ll_ � 9240 � � / FIRST FLOOR ELEVATION = 1018.0 FEET of O M D I 11 1 v i / 9266 4.0 I V 9241 / I 20.4 / O 9204 I I < I n S VPS ~ Z 1 / �� 11 O' D 00 i I CJ co (/7 Cj 11�19243 / I �J� 7 DECK Ld UOQ I / M Ln � 07 / 0 9203 1 11 w N v wl \ U *9244 GJ 4 S1 / < W D = C4/ I a >1 Ld x V 00 2.7 r / JZ a 9245 \ ° I 11 O frI Ln o I 0.7 1�1� � L D U Z I c Y \ .�\ \ STEPS j O< O I W 1 26.8 V / I , /9201 c W 1� 1013 9246 N I\ Z 1 O I I , V II W w � I �j LJ i / 9247 ' �� �- D 1000 W I N V I $ X <' W YIN �N v ® gg I N J < W ^' I I cn CONCRETE / / 9265 \ / Q 1� a 11-0 SLAB D W a Z \ 2 I 9248 / i i Co -' / 9264 \ 1�i " / F998I 1 w C? /\9249 013 / / I \ \ O 9262 � �a I / 111 = r I V I I _ _ VI J / \ I 7F9263 \ \ / / I 997 / c IDI N III �O m 1 Z411", Q Z�'92501013 Z 7 7I*996 II ~ OIVy0" 9251 \P.IW I / 7\ L- \ -1012 D-/995 // N Z Z v D I O 9253 / I / 1 a ', o II (~ O NEMINV 11008.7 9252 \ D ------__- <W LL N.INV-1005.9 / \707 _ c 1 Z W (n SW. INV=1005.1 925 � o� ((INVERTS PER PLAN) \ 1015 / , x 9255 \ / \ I 994 j L�Q 1014- // �! `CJ 92576 ^ �r 993 \ m CB I 1 pCAT or 0 UnG/ -1013- / �� \ 9259 9258 1 / \ / 1 �� - I> \ 1 RIM=1011.8 IQ qwA, eFk fMeNr- �ot2 �O 9290` V L/ % L- / \ .� Is92 �I NE.INV=1005.3 SW:INV=1005.1 ,y FN�y j � � L � � �-- D I ° J�"-/ \zoz74 I NO ACCESS TO VICKSBURG- C 20255 1_ _ OR 1 976 \ LANE PER DOC. NO. 3942862 p _<< o I 1 17, 9261 gINA \ \ NEMINVO--10.1 005.2 CoyoR _�S FFT,,- \1010 \n„T� nT 2026/--11 -- -- -` S 6�ME-, ANO VTI�� I / �- A / -) � - << � N.INv=1009.9 I \ / I a Fr "�� 26 E TY q - ,,-- � � 4 R !� \ <� sw.INv-1009.0 c, �O L DOC NO 16 X 200 FT. UTILITY EASEMENT-`I� 977 33 U / �� - I 1 33 \ 3 �� Q / < \ i PER DOC. NO. 4541002 o� 1 6„ r / % \ \ J� I i 971 ° �`� 984 / 986 \O 33 I �1_01 975 �� 981 , 990 - - -- - - ----- �r Y \, �� S� / RIM 1009.9 .11 966 968 010- o < 988 1 { O �/ ,� /� a\ �S( V� fVW.INV=992.9 962 9 J2e '. NE.INV=992.9 � *963 ��970 s I I 07'. , OO S.INV=992.9 956 957 2 62 << 98 87 1 0, 969 / < 78 98 983 955 gs_a0 989 C(7Re i' - 958 961 /959 �%i \ / -1008 �RGP 979 _ - � �r J / Too ✓ CB \ 10361 '�� \ I I\ ---PERE DOC. NNO. 4540992 SEMENT _ «� RIM=1008.0 S$8'42'36"W 240.65 X ' \ I \ RIM=1007.0 (G'F v i .v/ << �E.INV=1004.1I------- 33 ------ E.INV=991.8 T W.INV=1004.0 - \� / N.INV=991.7 I � \o�tio �• 36'-� - \ - -- STREET AND UTILI�YEAS`EMENT�----"'�X \\ \ \ S.INV=991.7 S �p tS 9G� ��po� / \ PER DOC. NO. 4137226 a, o _ \ I 1 o I Ilm I v .� _ \ _n \ o ti� VX V / �/ \ \ \ \ 0 0 0 0 - 0 50 I 11 / i RIM=1007.0 9', - J 0� �W.INV=1001.2 J 7 N j 7 O `*N\ s.wv=1001.4 o o°� O o I E.IN\001.9 r ° ��\�\� • � N\ � I 1 11� I RIM -1 005.4 1009 �1 FEE1 L�L_ l.1\�./ l \ L �> I I I m / I / 8: N.INV=1003.5 CB I S.INV- 0033.5 f/\ ' / ORELEVP�ON/1ho \O I I I I \ 1 1 II I 1 \ rrA \ 1 CB RIM=1005.4 ```` ,�O F�Rsj FVO C?NO' \ J " 550 q ---T- --------------� / Icy NW.INV=1001.9 J L sw.wv=1001.7 LL \ \ \ \ I II o I 1 a \IM -1005.4 NE.INV=1001.6 J \ \ \ NW.INV-1001.6 / J � 13975 S-1 SURVEY FOR: WESTAR DEVELOPMENT CORPORATION PROPERTY ADDRESS: 4465 Vicksburg Lane North, Plymouth, Minnesota. LEGAL DESCRIPTION: The North 209 feet of the East 280 feet of the North 1/2 of the Northeast 1/4 of the Northeast 1/4 of Section 17, Township 118 North, Range 22, West of the 5th Principal Meridian, according to the United States Government Survey thereof and situated in Hennepin County, Minnesota. Doc. No. 4002166. And The North 225 feet of the East 308 feet of the North 1/2 of the Northeast 1/4 of the Northeast 1/4 of Section 17, Township 118, North Range 22, West of the 5th Principal Meridian, according to the United States Government Survey thereof and situated in Hennepin County, Minnesota, except, that land previously conveyed February 26, 1973 by document number HCR 4002166. Subject to restrictions, reservations, and easements of record, if any. Doc. No. 4137553. And Outlot A and Outlot B, FAWN CREEK, according to the recorded plat thereof on file and of record in the office of the County Recorder in and for Hennepin County, Minnesota. Doc. No. 5720076 CERTIFICATION: I hereby certify that this is a true and correct representation of a survey of the boundaries of the land above described and of the location of all buildings, if any, thereon, and all visible encroachments, if any, from or on said land. Dated: March 31, 2015 by: NOTES: Anderson Engineering of Minnesota, LLC laz Jack Bolke Minnesota License No. 20281 1. The horizontal datum and basis of bearings is the Hennepin County Coordinate System. 2. The vertical datum is NAVD 88. The site benchmark is the top nut of hydrant located at the southwest corner of the described property. Elevation = 1011.45 feet. 3. The area of the property described hereon is 72,053 square feet or 1.6541 acres, less the street easements is 58,551 square feet or 1.3441 acres. 4' The location and extent of underground utilities, if shown, are based upon above ground evidence. There is no guarantee as to the accuracy or the completeness of this information. The size and location should be considered approximate. Additional underground utilities may be present. Verification of the existence and location of all utilities should be obtained from the utility owners prior to any planning or design. In accordance with Minnesota Statute, the location of utilities shall be confirmed prior to any demolition or construction. 5. The tree information shown hereon was collected during the field survey by non -forestry trained Anderson Engineering of Minnesota survey personnel. Tree sizes are estimates and locations are accurate to plus or minus three feet. 6. No title work was furnished for the preparation of this survey to verify the legal description or the existence of any easements or encumbrances. LEGEND El AIR CONDITIONER CULVERT �D CLEAN OUT cB CATCH BASIN Qo CONTROL POINT 0 COMMUNICATION JUNCTION BOX TR ELECTRIC BOX EIEM ELECTRIC METER \G GAS VALVE GO GAS METER o GUARD POST HYDRANT X HANDICAP PARKING ❑ �_ HANDHOLE ELECTRIC T LIGHT POLE \ MANHOLE 0 FOUND MONUMENT O SET MONUMENT O POWER POLE \ SANITARY MANHOLE \ STORM MANHOLE Aw SIGN SOIL BORING O STOP BOX ® WATER VALVE ® ROOF DRAIN CONIFEROUS TREE 0 DECIDUOUS TREE GAS UE I TEL CU x FENCE GAS MAIN OVERHEAD WIRES SANITARY SEWER STORM SEWER 0 20 40 60 UNDERGROUND ELECTRIC WATER MAIN SCALE IN FEET TELEPHONE FIBER OPTIC ANDERSON {IIIIIIIIIIIIIIIIIIIIIIII /■1 I�IIIIIIIIIIII ENGINEERING ENGINEERING ARCHITECTURE 9 LAND SURVEYING ENVIRONMENTAL SERVICES e LANDSCAPE ARCHITECTURE Anderson Engineering of Minnesota, LLC 136051st Avenue North Suite 100 Plymouth, MN 55441 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com rvIc%-rlLl + i c+111117N111117-NI c%1 1rrT n r% r- a Paoe4 "^1%J 1 IIV%I VVIV VI 1 MVV / %Jun V G I VI IGG 1 G %J F_ J - I U Ln i U I 0 0 x I °J co w ° M z - Q -7 ch Ln ::::) I- LnLn U Jm Q CD W �l� Q 0) J � x X / N CD N 0 i� x (n Ln r� � m Q � U I w Q Ln I� r7 xQ) x —1016— ; '010 UE UE YE — rwif. II v 1016•• .._.—.;_.._.._.._.._/. /•— —\� i I / / ��— BITUMIN0USI DRI E ,°,,\ i C 0 f C E T E 'N\ x _ _ _ _— — — — — — — % /� — /� o GARAGE to REMAIN I I I �1 A __7076 I / / / / 70 / GAS �AS GAS z G x LOT 1 / / ,' 's� � I SII _ F.B. F.F. 1016.50 R I � I �I II = / / ,/ �, °� ��I GAR. = 1014.50 / / / s I 3 \ x� 10 EXIST to REMAIN \ , F.F.E. = 1018.0 I i •' I / I'� II ,I V I II \� '0 4 I II / I 3 \LOT 2 1013 1013 l o op l I // �' \ 3 ._.._.._.._.._.._.._.._..z._..I I I I m x1014.5 0�� I I o 11 I 013 N i II cn x �� x �o •' — 1111 �I N LU T: —10, I / II 0 JL I IliII LOT 3 III 0z III / � `<�<�-� SIDE L.O. 4- X /F.F. = 1016.50 13— � / GAR. = 1014.50 \ � � I I i I CB 01,2- ___/z 01 ` x /0- 1011 A, '� � .•• << � III I � 1010 X I --1-- °� o / � <RCP _ n �01%/ "l' 1009 ' ❑���s�- _ °'� S 1010 X -- _ II I X — �< \ - -100800 \ s«36•• -1008.3 EXISTING E.O.F. vo' 0 0000 0 ,CB \o I I I I r \ CB i \ /1 � C ,moo / L \ \ \ ^O \ \ \ \ I I I I I C7 \ \ d \ L 1b \ \CB WIRE MESH REINFORCEMENT (OPTIONAL) ENGINEERING FABRIC METAL OR WOOD POST OR STAKE 'I I FABRIC ANCHORAGE TRENCH BACKFILL WITH TAMPED NATURAL SOIL DIRECTION RUNOFFFLOW r ��.<.:.: �� ;ry; 8 1NE}{•1y11N1MfjFl 6 INCH MINIMUM NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES. TYPICAL INSTALLATION FOR SILT FENCE (SECTION 6.3, MPCA'S "BEST MANAGEMENT PRACTICES") RON 1" TO 2" WASHED ROCK ROCK CONSTRUCTION ENTRANCE NOT TO SCALE SAND FILTER BED 0 10 20 40 SCALE IN FEET LEGEND ST -4 So BORING LOCATION 1067 EXISTING CONTOUR 1067 PROPOSED CONTOUR CURB & GUTTER — SF ❑ SILT FENCE .---------- EROSION CONTROL — 810 ROLL 4.1% DRAINAGE ARROW 4012.3 PROPOSED SPOT ELEVATION EROSION CONTROL — INLET AFTER TRIBUTARY PROTECTION TREE TO BE REMOVED (REFER TO SHEET C-5) U) w O M a STORM WATER POLLUTION PREVENTION PLAN I- SCHEDULE OF INSTALLATION & MAINTENANCE ITEM INSTALLATION INSPECTION & MAINTENANCE REMOVAL INSPECT & MAINT. AFTER AFTER TRIBUTARY SILT FENCE PRIOR TO COMMENCEMENT EACH RUN—OFF EVENT. DRAINAGE AREA IS OF EARTHWORK OPERATIONS. REMOVE SEDIMENTS AS RESTORED. REQUIRED. ROCK CONST. PRIOR TO COMMENCEMENT INSPECT REGULARLY. PRIOR TO PAVING. ENTRANCE OF EARTHWORK OPERATIONS. MAINTAIN AS NEEDED. SEED & AFTER FINAL GRADING INSPECT & MAINTAIN NO REMOVAL MULCH OPERATIONS. AFTER HEAVY RAINS. NECESSARY. REPLACE WASH—OUT AREAS IMMEDIATELY. INLET UPON INLET CONSTRUCTION. WHEN 1/3 CAPACITY OF AFTER TRIBUTARY PROTECTION BMP IS REACHED AREAS ARE FULLY RESTORED NOTE: CONTRACTOR IS RESPONSIBLE FOR INSTALLATION, MAINTENANCE AND REMOVAL OF ALL APPLICABLE EROSION & SEDIMENT CONTROL ITEMS. GRADING NOTES 1. ALL CONSTRUCTION SHALL COMPLY WITH RECOMMENDATIONS OF THE SOIL ENGINEER UNLESS DIRECTED OTHERWISE. 2. ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST CITY OF PLYMOUTH ENGINEERING STANDARDS AND THE 2014 EDITION OF MNDOT STANDARD CONSTRUCTION SPECIFICATIONS (INCLUDING SUPPLEMENTS) UNLESS DIRECTED OTHERWISE. 3. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE MUNICIPAL, WATERSHED DISTRICT, COUNTY, MPCA, DEPT. OF HEALTH, AND MNDOT PERMITS. 4. THE LOCATION AND TYPE OF EXISTING UTILITIES SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION ONLY. THE INFORMATION IS NOT WARRANTED TO BE ACCURATE OR COMPLETE. THE CONTRACTOR, IN COOPERATION WITH THE APPROPRIATE UTILITY COMPANY OR MUNICIPALITY, IS RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF ALL UNDERGROUND UTILITIES. 5. SPOT ELEVATIONS IN STREETS ARE GUTTER GRADES UNLESS OTHERWISE NOTED. 6. IN ALL NON—PAVE AREAS OF DISTURBANCE, PROVIDE 6 INCHES OF TOPSOIL OR ORGANIC MATTER TO BE SPREAD AND INCORPORATED INTO THE UNDERLYING SOIL DURING FINAL SITE TREATMENT. I: I I: I� LINE TRENCH WITH GEOTEXTILE SEPARATOR FABRIC VARIES — SEE PLAN SOD OR MNDOT 270 SEED MIX + + + + + + + + + + + + + + + + + + + + + + +++++++++++++++++++++++++ 30" SAND FILTER BED IL- � 6" THICK 50-50 SAND & TOPSOIL MIX 24" THICK CLEAN MASON'S SAND (ASTM C-33) WITH 5%-7% BY WGT. IRON FILINGS. FOR BEST EFFECTIVENESS, FILINGS SHOULD BE 90% ELEMENTAL IRON I I WITH FILING SIZE SIMILAR TO THE SAND (0.02"-0.04"). EVENLY DISTRIBUTE IRON THROUGHOUT THE SAND BED. IF ROTO—TILLING, SEVERAL PASSES WILL BE REQUIRED. 5 DESIGNED: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR COMM. NO. I PLOTTED: UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER �'ANDERSON Anderson Engineering of Minnesota, LLC A VO N LE A PLACE ADDITION D I TI 0 N P R E LI M I N A R Y 4 IRS UNDER THE LAWS OF THE STATE OF MINNESOTA. 139 75 5/18/2015 3 136051st Avenue North DRAWN: ENGINEERING WESTAR DEV. CORP. GRADING & EROSION 2 PRINT NAME: ROBERT L. SWANSON, P.E. _I Suite 100 AWING NO. CJA Plymouth, MN 55441 1 5/15/15 PER D.R.C. /CITY COMMENTS CHECKED BY: SIGNATURE: ENGINEERING • ARCHITECTURE LAND SURVEYING 763-412-4000 (o) 763-412-4090 (f) PLYMOUTH, MN CONTROL PLAN C-3 N0. DATE DESCRIPTION OF REVISIONS xxx DATE: APRIL 17, 2015 LICENSE # 24094 ENVIRONMENTAL SERVICES • LANDSCAPE ARCHITECTURE www.ae-mn.com Page 5 U I I r` 0-) r� C� / �o I z D = I Ln O V) �U Lnz Q � U/ U 0 Jm Q c) CD w l� Q 0) r2 rx x / N CD N o / i� ur r� C) s� M W Q LC) CD 0Q) :> x -1/2" WATER SERVICE, CONNECT TO EXIST @ D&U ESMT., CONNECT SANITARY SERVICE TO EXISTING AT EXISTING CLEANOUT RELOCATED HYDRANT & - NEW 6" GATE VALVE (2) WATER SERVICE LINES W/CURB STOP TYPICAL, AT D&U ESMT. LINE (2) SAN. SERVICE LINES, EXTEND TO D&U ESMT. LINE (TYPICAL) NEW SAN. MH, RIM = 1011.20 8" INV. = 994.89 REMOVE (3) CURB STOPS & REMOVE EXISTING SERVICE LINES SALVAGE & RELOCATE HYDRANT REMOVE SAN. MH, CONNECT TO EXIST. & EXTEND 8" SAN. TO NEW SAN. MH CONNECT TO 6" G.V. AND EXTEND 6" WATER TO RELOCATED HYDRANT \ J ABANDON UG ELECT. LINE ----- --7 � LOT 1 ./ x X I I / / I I —r — — --T I I/ r I I X - UE . . -**- . - I J GAS GAS I� 41 LOT 2 7F / � I / < < <—� < / SAND FILTER ...... TRENCH V 40 <\c h 0. xL x I V coN�RFrf J= ` 6" \/ 1009.9 IN=99 9 E.INV=992.9 S.INV=992.9 / \ RIM V-991 0 -E.IN V=991.8 \rte N.INV=991.7 << \ S.INV=991.7 «- S «- CONNECT TO EXISTING 6" DRAINTILE STUB RIM 1005.4 N wv=1003 s CB �p S.INV=1003.5 r°O CB RIM=1005.4 NW_INV=1001.9 J L SW.INV=1001.7 �GQ L CB RIM=1005.4 J NE.INV=1001 6 NW.INV-1001.6 \ \ SOA RIM -1008.0 «- E.INV-1004.1 «36° RCP W.INV-1004.0 REMOVE EXIST. SAN. SERVICE LINES (3) -1-000 LOT 3 I I I /-XL / « cB «- o SAND FILTER TRENCH WITH 4" DRAINTILE (TYP.) PER DETAIL LEGEND GAS GAS GAS V II OHW OHw OHw V11 II III II II UE UE UE UNDERGROUND ELEC. III III II TEL TEL TEL TELEPHONE IIIII l II CATV CABLE TV G DRAWING N0. C-4 III II II COMMUNICATION/FO 1 I I ° ° o° EX. WATER MAIN 0 III IIICB » EX. STORM RIM=1011.8 > > EX. SANITARY N E. N V=1005.3 PROPOSED SAN. MH x X s IINV=10051 ° III SF El << RI x'0.1 I I I II 1 N .INV 1005 P PROPOSED CURB STOP -------- N INV=1005 �_ j EROSION CONTROL/INLET > s INV=100 p i I II ---------- IIf n I I III II PROPERTY LINE III II c I II LEGEND GAS GAS GAS EX. GAS EX. LIGHT OHW OHw OHw OVHD ELEC. cB EX. CB UE UE UE UNDERGROUND ELEC. OO EX. STORM MH TEL TEL TEL TELEPHONE OS EX. SANITARY MH CATV CABLE TV G DRAWING N0. C-4 SANITARY CLEANOUT CU COMMUNICATION/FO 1 EX. HYDRANT ° ° o° EX. WATER MAIN 0 EX. GATE VALVE » EX. STORM EX. CURB STOP > > EX. SANITARY ® PROPOSED SAN. MH x X EX. FENCE ° PROPOSED HYDRANT SF El SILT FENCE ® PROPOSED GATE VALVE 1 WATER MAIN 0 PROPOSED CURB STOP -------- WATER SERVICE �_ j EROSION CONTROL/INLET > SANITARY SEWER Oa EX. DECID. TREE ---------- SANITARY SERVICE EX. CONIF. TREE PROPERTY LINE X REMOVED TREE — — -- — -- DRAINAGE & UTILITY ESMT. DRAINAGE FLOW — — — — — — — — — — — — — — — — BLDG. SETBACK x1011.5 SPOT ELEVATION 8.8% PROPOSED BLDG. PAD DRAINAGE GRADE SAND FILTER TRENCH 12" W/4" DRAINTILE 8c SOCK SAND FILTER TRENCH 24" (BEHIND ALL NEW CURB) SAND FILTER BED 0 10 20 40 SCALE IN FEET GRAVEL BASE SUBGRADE� N 2" MAX a CURB SAND FILTER TRENCH FIN. GRADE (TURF) 50/50 SAND & TOPSOIL MIX TO INTERCEPT SURFACE RUNOFF CLEAN SAND WITH IRON FILINGS FOR TREATMENT OF STORMWATER NUTRIENTS TRENCH WILL BE LINED WITH FILTER FABRIC 4" PERFORATED PIPE W/SOCK 5 DESIGNED: R S 0 �'ANDERSON _I ENGINEERING ENGINEERING • ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE Anderson Engineering of Minnesota, LLC 136051st Avenue North Suite 100 Plymouth, MN 55441 763-412-40001 763-412-4090 (f) www.ae-mn.com A VO N LE A PLACE ADDITION D I TI 0 N WESTAR DEV. CORP. PLYMOUTH MN PRELIMINARY SITE UTILITY PLAN COMM. NO. 13I I PLOTTED: 5/18/2015 4 3 a ° 0 G DRAWING N0. C-4 d G 1 d ° ° ° o° CHECKED BY: xxx 0 ° DESCRIPTION OF REVISIONS 0 0 O ° a0 ® O ° ° O ea Oa 12" 24" SAND FILTER TRENCH FIN. GRADE (TURF) 50/50 SAND & TOPSOIL MIX TO INTERCEPT SURFACE RUNOFF CLEAN SAND WITH IRON FILINGS FOR TREATMENT OF STORMWATER NUTRIENTS TRENCH WILL BE LINED WITH FILTER FABRIC 4" PERFORATED PIPE W/SOCK 5 DESIGNED: R S I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINT NAME: ROBERT L. SWANSON, P.E. /� D SIGNATURE: 4-65 � DATE: APRIL 17, 2015 LICENSE # 24094 �'ANDERSON _I ENGINEERING ENGINEERING • ARCHITECTURE LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE Anderson Engineering of Minnesota, LLC 136051st Avenue North Suite 100 Plymouth, MN 55441 763-412-40001 763-412-4090 (f) www.ae-mn.com A VO N LE A PLACE ADDITION D I TI 0 N WESTAR DEV. CORP. PLYMOUTH MN PRELIMINARY SITE UTILITY PLAN COMM. NO. 13I I PLOTTED: 5/18/2015 4 3 DRAWN: CJA G DRAWING N0. C-4 2 1 5/15/15 PER D.R.C./CITY COMMENTS CHECKED BY: xxx N0. DATE DESCRIPTION OF REVISIONS Page 6 W U� zLn Q� M U y U U O M I N J Q w D Q Lnx r- N Cn N O (1) O CO O � m / U LO Cn O m Q U +� Tree Tag Li$t TAG # I S IZE I TREE & SPECIES REMARK NOTES TAG # SIZE TREE & SPECIES REMARK NOTES 955 14" Pine - Red (Pinus resinosa) CONIFEROUS TREE 9221 11" Spruce - Colorado (Picea pungens) PERCENT REMOVAL = 263/1308 956 10" Pine - Red (Pinus resinosa) 9222 13" Spruce - Colorado (Picea pungens) INCHES 957 10" Pine - Red (Pinus resinosa) 9226 7" Pine - Red (Pinus resinosa) 958 10" Pine - Red (Pinus resinosa) 9227 7" Pine - Red (Pinus resinosa) 959 8" Ash - Green (Fraxinus pennsylvanica) 9228 8" Pine - Red (Pinus resinosa) 961 7" Pine - Red (Pinus resinosa) 9229 8" Pine - Red (Pinus resinosa) 962 8" Pine - Red (Pinus resinosa) REMOVE 9230 8" Pine - Red (Pinus resinosa) 963 10" Pine - Red (Pinus resinosa) REMOVE 9231 11" Pine - Red (Pinus resinosa) 964 9" Pine - Red (Pinus resinosa) 9232 10" Pine - Red (Pinus resinosa) 965 8" Pine - Red (Pinus resinosa) REMOVE 9233 11" Pine - Red (Pinus resinosa) REMOVE 966 9" Pine - Red (Pinus resinosa) REMOVE 9234 12" Ash -Green (Fraxinus pennsylvanica) 967 7" Pine - Red (Pinus resinosa) REMOVE 9235 7" Pine - Red (Pinus resinosa) 968 11" Pine - Red (Pinus resinosa) REMOVE 9236 12" Pine - Red (Pinus resinosa) REMOVE 969 9" Pine - Red (Pinus resinosa) REMOVE 9237 8" Pine - Red (Pinus resinosa) 970 12" Pine - Red (Pinus resinosa) REMOVE 9238 10" Pine - Red (Pinus resinosa) REMOVE 971 16" Ash -Green (Fraxinus pennsylvanica) 9239 8" Pine - Red (Pinus resinosa) 972 18" Ash - Green (Fraxinus pennsylvanica) 9240 9" Pine - Red (Pinus resinosa) REMOVE 973 12" Elm - American (Ulmus americana) 9241 8" Pine - Red (Pinus resinosa) 974 15" Ash - Green (Fraxinus pennsylvanica) 9242 11" Pine - Red (Pinus resinosa) 975 10" Elm -American (Ulmus americana) 9243 15" Pine - Red (Pinus resinosa) REMOVE 976 9" Pine - Red (Pinus resinosa) REMOVE 9244 12" Pine - Red (Pinus resinosa) 977 1 10" Pine - Red (Pinus resinosa) REMOVE 9245 16" Pine - Red (Pinus resinosa) 978 8" Ash - Green (Fraxinus pennsylvanica) 9246 9" Pine - Red (Pinus resinosa) 979 8" Ash - Green (Fraxinus pennsylvanica) 9247 8" Spruce - Colorado (Picea pungens) 980 7" Fir- Balsam (Abies balsamea) 9248 8" Pine - Red (Pinus resinosa) 981 8" Pine - Red (Pinus resinosa) 9249 9" Pine - Red (Pinus resinosa) 982 7" Pine - Red (Pinus resinosa) 9250 9" Pine - Red (Pinus resinosa) 983 8" Pine - Red (Pinus resinosa) 9251 14" Pine - Red (Pinus resinosa) 984 9" Pine - Red (Pinus resinosa) 9252 12" Pine - Red (Pinus resinosa) REMOVE 985 12" Pine - Red (Pinus resinosa) 9253 9" Pine - Red (Pinus resinosa) REMOVE 986 13" Pine - Red (Pinus resinosa) 9254 7" Pine - Red (Pinus resinosa) REMOVE 987 10" Pine - Red (Pinus resinosa) 9255 13" Pine - Red (Pinus resinosa) REMOVE 988 8" Pine - Red (Pinus resinosa) 9256 9" Pine - Red (Pinus resinosa) REMOVE 989 12" Box Elder (Acer negundo) 9257 7" Pine - Red (Pinus resinosa) REMOVE 990 10" Fir- Balsam (Abies balsamea) 9258 12" Pine - Red (Pinus resinosa) REMOVE 991 17" Fir- Balsam (Abies balsamea) 9259 5" Pine - Red (Pinus resinosa) REMOVE 992 13" Spruce - Colorado (Picea pungens) REMOVED BY OTHERS 9260 1 7" Pine - Red (Pinus resinosa) REMOVE 993 13" Spruce - Colorado (Picea pungens) 9261 12" Ash -Green (Fraxinus pennsylvanica) REMOVE 994 16" Spruce - Colorado (Picea pungens) 9262 12" Apple (Malus spp.) 995 22" Spruce - Colorado (Picea pungens) 9263 4" Cedar- Eastern Red (Juniperus virginiana) 996 8" Spruce - Colorado (Picea pungens) 9264 4" Cedar- Eastern Red (Juniperus virginiana) 997 7" 1 Spruce - Colorado (Picea pungens) 9265 12" Spruce - Colorado (Picea pungens) 998 26" Spruce - Colorado (Picea pungens) REMOVED BY OTHERS 9266 12" Spruce - Colorado (Picea pungens) 999 17" Spruce - Colorado (Picea pungens) 9267 49" Maple -Silver (acer saccharinum) 1000 14" Spruce - Colorado (Picea pungens) 10361 8" Ash 9201 12" Spruce - Colorado (Picea pungens) REMOVED BY OTHERS 10362 6" Ash 9202 15" Spruce - Colorado (Picea pungens) 20255 10" Ash REMOVE 9203 22" Spruce - Colorado (Picea pungens) 20256 10" Ash REMOVE 9204 17" Spruce - Colorado (Picea pungens) 9205 21" Spruce - Colorado (Picea pungens) 9206 17" Spruce - Colorado (Picea pungens) 9207 22" Spruce - Colorado (Picea pungens) 9208 21" Spruce - Colorado (Picea pungens) 9209 20" Spruce - Colorado (Picea pungens) 9218 18" Spruce - Colorado (Picea pungens) 9219 14" Spruce - Colorado (Picea pungens) 9220 15" Spruce - Colorado (Picea ounaens) TREE PRESERVATION SUMMARY: LEGEND DESIGNED: RS TOTAL CALIPER INCHES = 1308 INCHES CF TREE PROTECTION FENCE REMOVED/DISTURBED = 263 INCHES '�I/z CONIFEROUS TREE 3 DECIDUOUS TREE PERCENT REMOVAL = 263/1308 = 20.10% DRAWING NO. C-5 2 1 TREE REMOVAL TABLE DOES NOT INCLUDE 51 -CALIPER INCHES NO. DATE (3 -TREES) REMOVED BY OTHERS. TN TREE REMOVED BY OTHERS 9234 NOTES: 1. TREES SHOWN TO BE PROTECTED SHALL BE DELINEATED WITH ORANGE TREE PROTECTION FENCING PRIOR TO ANY GRADING ACTIVITY. 2. WHENEVER POSSIBLE, PROTECTIVE FENCING SHALL BE PLACED TO ENCOMPASS OR PROTECT AREAS WITHIN THE DRIP LINE. 0 10 20 40 SCALE IN FEET 9229 i!Ii9218 \ 922211 s22o ' 922 921s — 779231 9230 9206 _.._.._..—.._.._.._.._..—.._.r_.._.._.._..— ._.._.._.. — T C O N C R E T E SHED GARAGE FLOOR S L A B / y ELEVATION=1016.8 FT \3�t x I 9233 0 9235 9236 9237 9238 X92139 ; � 9240 9241 �92 2 9243 9�4 x 9 45 i 247 x � 9248 92 9 . fro ,x . 11 9251 253 92578LiAIN 9256 9 -9258 9260-\ I, 0 0'92FJCONCRETE LOT 1 / / w R I ` _\� iz-c L0 T 2 6 9202 n CONCRETE C K 963 *10 9 cp 922 -+) 62 LOT 3 I *993 .b d A (920274 / 976 �. IN977 cr. / C 71 F i ' 5 ' ' 981 990 986 990 968 � �.. � 980 / _�988 ;\� 097 985 987 991 1036 - � 969 3 AD �978 98 983 �- 958 961 959 979 CB 010361 X__ gyms ME 98 6 0 II II II El I I II II II II II II II II 5 DESIGNED: RS I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR DULY LICENSED PROFESSIONAL ENGINEER UNDER TMY HE LAWS UNDER THE LAWS OF THE STATE OF MINNESOTA. MINNESOTA. PRINT NAME: ROBERT L. SWANSON, P.E. SIGNATURE: DATE: APRIL 17, 2015 24094 LICENSE # ® AN D E RSO N ENGINEERING • ARCHITECTURE • LAND SURVEYING ENVIRONMENTAL SERVICES LANDSCAPE ARCHITECTURE Anderson Engineering of Minnesota, LLC 13605 1St Avenue North Suite 100 , MN 55441 Plymouth, 763-412-4000 (o) 763-412-4090 (f) www.ae-mn.com AVON LEA PLACE ADDITION WESTAR DEV. CORP. PLYMOUTH MN ! PRELIMINARY TREE PRESERVATION PLAN COMM. NO. 13975 I PLOTTED: 5/18/2015 4 3 DRAWN:ENGINEERING CJA DRAWING NO. C-5 2 1 5/15/15 PER D.R.C./CITY COMMENTS CHECKED BY: xxx NO. DATE DESCRIPTION OF REVISIONS Page 7 CITY OF PLYMOUTH RESOLUTION No. 2015-199 A RESOLUTION APPROVING A PRELIMINARY PLAT FOR KENNETH (JIM) AND CORINNE GUDDAL FOR "AVONLEA PLACE" FOR PROPERTY LOCATED AT 4465 VICKSBURG LANE (2015032) WHEREAS, Kenneth (Jim) and Corinne Guddal have requested approval of a preliminary plat for roughly 1.63 acres of land presently legally described as follows: The North 225 feet of the East 308 feet of the North Half of the Northeast Quarter of the Northeast Quarter of Section 17, Township 118 North, Range 22, West of the 5t" Principal Meridian, according to the United States Government Survey thereof and situated in Hennepin County, Minnesota, subject to restrictions, reservations, and easements of record, if any. Doc. No. 4137553. AND Outlot A and Outlot B, Fawn Creek, according to the recorded plat thereof on file and of record in the office of the County Recorder in and for Hennepin County, Minnesota. Doc. No. 5720076. WHEREAS, the Planning Commission has reviewed said request at a duly called public hearing and recommends approval. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that it should and hereby does approve the request by Kenneth (Jim) and Corinne Guddal for a preliminary plat for Avonlea Place, subject to the following conditions: 1. A preliminary plat is approved for three single-family lots, in accordance with the plans received by the city on May 18, 2015, except as may be amended by this resolution. 2. Prior to commencement of grading operations, the developer shall install and request inspection of tree preservation fencing and silt fencing. 3. Prior to recording the final plat, the developer shall: a) Provide a separate ten -foot wide trail easement along the east side of those properties that abut Vicksburg Lane. b) Execute a development contract and provide the related financial guarantees and fees. c) Receive city approval of final construction plans. d) Pay the required park dedication fee for three dwelling units. 4. Prior to issuance of any building permits within the subdivision, the existing driveway connection to Vicksburg Lane shall be removed. Direct access to Vicksburg Lane shall be prohibited thereafter. Page 8 Res. 2015-199 File 2015032 Page 2 5. Construction access to Vicksburg Lane may be limited or restricted during the Vicksburg Lane reconstruction project. 6. The sidewalk requirement for the new cul-de-sac street is hereby waived because there are no sidewalks in the area. 7. Standard Conditions: a. No building permits shall be issued until the final plat is filed and recorded with Hennepin County. b. Development standards and setbacks for this plat shall comply with the RSF-2 zoning standards. No variances are granted or implied. c. Any signage shall require separate permits and shall comply with the city's sign regulations. d. Submit fire flow calculations with the final plat application. e. Compliance with the city's tree preservation regulations. f. Removal of all hazardous trees at the owner's expense. g. No trees shall be planted in the boulevard. h. This approval shall expire one year after the date of approval, unless the property owner or applicant has applied for final plat approval, or unless the applicant, with the consent of the landowner, has received prior approval from the city to extend the expiration date for up to one additional year, as regulated under section 510 of city code. ADOPTED by the City Council this 23rd day of June, 2015. STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on June 23, 2015 with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk Page 9 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION APPROVING ONE-YEAR EXTENSION OF THE PRELIMINARY PLAT APPROVAL FOR "AVONLEA PLACE" (2015032) WHEREAS, Svetlana Gulova has requested a one-year extension of the preliminary plat approval that was granted for property located at 4465 Vicksburg Lane and legally described as follows: The North 225 feet of the East 308 feet of the North Half of the Northeast Quarter of the Northeast Quarter of Section 17, Township 118 North, Range 22, West of the 5th Principal Meridian, according to the United States Government Survey thereof and situated in Hennepin County, Minnesota, subject to restrictions, reservations, and easements of record, if any. Doc. No. 4137553. :►D Outlot A and Outlot B, Fawn Creek, according to the recorded plat thereof on file and of record in the office of the County Recorder in and for Hennepin County, Minnesota. Doc. No. 5720076. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that it should and does approve the request by Svetlana Gulova for a one-year extension of the preliminary plat approval granted for Avonlea Place, subject to the following conditions: 1. A one-year extension of the preliminary plat is hereby granted, subject to the conditions listed in Resolution No. 2015-199 approved on June 23, 2015, as previously administratively extended. 2. The preliminary plat approval shall now expire on June 23, 2019, unless the final plat is applied for by that date or an additional extension is granted. APPROVED by the City Council on this 12th day of June, 2018. Page 10 Resolution 2018- (2015032) Page 2 STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on June 12, 2018, with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk Page 11 rp)City of Plymouth Adding Quality to Life To: REGULAR COUNCIL MEETING Prepared by: June 12, 2018 Reviewed by: Item: Agenda 7 m O l Number: Dave Callister, City Manager Mike Payne, Assistant City Engineer Michael Thompson, Director of Public Works Public Improvement and Special Assessment Hearing and Award of Contract for the Troy Lane Reconstruction Project (ST180002) 1. ACTION REQUESTED: Adopt attached resolutions ordering the improvement, adopting the assessment roll, and awarding the contract for the Troy Lane Reconstruction Project (ST180002). 2. BACKGROUND: On April 24, 2018, the City Council approved the plans and specifications, ordered advertisement of bids, and set June 12, 2018 as the date for the Public Improvement and Special Assessment Hearing for the Troy Lane Reconstruction Project (ST18002). In accordance with state statute, notice of the proposed improvement hearing and assessment hearing has been sent to all affected property owners and has been posted in the City's designated newspaper. Reconstruction of Troy Lane between 54th Avenue and County Road 47 is included in the 2018-2022 Capital Improvement Program (CIP) with construction scheduled in 2018. The project would include reconstruction of Troy Lane from roughly 56th Place to approximately 375 feet south of County Road 47. Troy Lane would be upgraded from its existing two lane rural section to a two lane urban section with curb and gutter that would include a trail on the east side of the road and storm sewer. This street is considered a local roadway; therefore the typical 28 foot wide street is proposed. The proposed 10 foot wide bituminous trail would connect 56th Place to 59th Avenue, but not to County Road 47 as this could create a safety concern as pedestrians may be encouraged to cross at this intersection, which has high speeds and poor sightlines. Instead, this trail connection is planned when County Road 47 is reconstructed. The existing 36 inch corrugated metal pipe (CMP) creek culvert that occasionally overtops in large rain events will be replaced with two 3 foot by 6 foot concrete box culverts to reduce roadway flooding. The proposed improvements would connect to a roughly 375 foot long section of Troy Lane immediately south of County Road 47 that was realigned and reconstructed in 2017 with the development of The Fields at Meadow Ridge Subdivision. The remaining unreconstructed section of Troy Lane south of 56th Place will be evaluated for reconstruction and realignment as the surrounding area develops. Troy Lane is proposed to be open to local traffic only during the project. All of the developments on the east side of Troy Lane, with the exception of the Preserve at Meadow Ridge have access to the recently reconstructed Peony Lane. The planned Greenway West development on the west side of Troy Lane is Page 1 currently under construction. The preliminary plat for the Greenway North has been submitted and could potentially be under construction later this fall if approved. The Troy Lane reconstruction project will coordinate with the adjacent developments to provide access. On April 23, 2018 bids were publically opened for this project. A total of six bids were received as follows: Contractor Total Base Bid GMH Asphalt Corporation $821,107.64 C.S. McCrossan $893,648.62 Minger Construction $898,591.80 Midwest Civil Constructors $908,940.90 Landwehr Construction $938,200.46 Bituminous Roadways $1,270,716.45 Engineers Estimate $1,122,381.15 They City's consulting engineer, Bolton & Menk has reviewed the information submitted by GMH Asphalt Corporation of Chaska, Minnesota to comply with the bidder qualification criteria policy, and finds the information acceptable. This company has completed similar projects in Plymouth such as the Sagamore Street Reconstruction Project and the East Parkers Lake Street Reconstruction Project. They have also completed similar jobs in Chanhassen, Brooklyn Park, Golden Valley, Minnetonka and other metro cities in that time frame. GMH is the contractor on the current Kilmer Park Street Reconstruction Project. Engineering staff feels that GMH Asphalt Corporation is capable of constructing the Troy Lane Reconstruction Project in accordance with the approved plans and specifications. Bolton & Menk has submitted the attached letter recommending award of the project to GMH Asphalt Corporation. As stated above, the City Council has set June 12, 2018 as the date for the assessment hearing for the project. The current assessment policy assesses 40% of the project cost for total street reconstruction. Typical street reconstruction projects assess properties on each side of the street, therefore, properties are essentially assessed for half of the roadway costs. Since the properties on the east side of the road do no have direct access and aren't typically assessed under City policy, the proposed assessments for the Troy Lane Reconstruction project were calculated based on half of the roadway costs and buildable area following the assessment policy. The costs to install the bituminous trail and two box culverts are not proposed to be assessed. The below table shows the estimated assessment based on the Engineer's cost estimate and the proposed assessment, based on the lowest responsible bid received. The City had a third party prepare a letter report detailing the special benefit that could be received from this project and the proposed assessments were substantiated. Many of the properties proposed to be assessed are a part of the Greenway West and Greenway North developments. PID Estimated Assessment Proposed Assessment 6-118-22-21-0009 $19,173.10 $16,798.84 6-118-22-24-0002 $8,177.44 $7,164.81 6-118-22-24-0003 $24,670.92 $21,615.86 6-118-22-24-0004 $47,031.83 $41,207.76 6-118-22-24-0005 $31,000.35 $27,161.50 6-118-22-24-0006 $36,267.18 $31,776.12 6-118-22-31-0006 $8,316.04 $7,286.24 6-118-22-31-0007 $12,381.66 $10,848.41 6-118-22-31-0008 $17,556.09 $15,382.07 Page 2 Property owners would have four different options to pay for their assessment. Option one is full payment by October 31, 2018 without any interest. Option two is full payoff between the dates of November 1, 2018 and November 15, 2019. Interest on this option will accrue for the entire year regardless of when the balance is paid off. Option three is a partial prepayment by October 31, 2018 and the remaining balance to follow the standard assessment term for option four. Finally, option four is payment over the standard assessment term. The property owners adjacent to the project have been notified of the proposed project and an open house was held on January 31, 2018. All private utility companies have been notified of this potential project and their facilities have been shown on the proposed construction plans, according to the location notes in the record drawings provided to the City by each company. Additionally, a meeting was held on March 1 with the utility companies to discuss the utilities within the project area. If the project is awarded by Council, construction is expected to start in late June or July and be completed at the end of October. 3. BUDGET IMPACT: The Troy Lane Reconstruction Project is included in the 2018 — 2022 CIP at an estimated cost of $1,450,000.00. The total estimated project cost is $1,039,483.03 as detailed in the below table: Estimated Project Cost Street Reconstruction $684,655.29 Trail $62,140.35 Box Culverts $74,312.00 5% Engineering, Administrative, & Contingency $41,055.39 Consulting Engineer $177,320.00 Total Estimated Cost $1,039,483.03 Funding would come from the Street Reconstruction Fund ($860,241.42) and special assessments ($179,241.61). 4. ATTACHMENTS: Project Location and Assessment Map Bid Tabulation Award Recommendation Letter Assessment Roll Resolutions Page 3 $16,798.84 Harvest) 59TH AVE N $31,776.12 Meadow Ridge Elementary $21,615.86 $7,164.81 N $41,207.76 $27,161.50 ~ y< SSTK cla N 57TH AVE N z The Meadows $10,848.41 z (Future Park) $15,382.07 W z STTy 4LFN 56TH PL N ) . $7,286.24 1 Plymouth 56THAVEN / 1 Minnetonka x 2 C O V I j LAND LN N er Q�EENS O 56TH CT N C� 2018 Street IFz ,Ny Reconstruction z �1 - Troy Lane - ST180002 (6)) J.—Iry, 2018 IPS 1 AVE N 0 440 Feet Projects ,1 PlCity of ymouth THISREPR ESE NTS A COMPILATIONOFINFORMATIONANO LATA FROM CITY C6JNTY, STATE ANO OTHER SOIIRCEBTHAT NAS NOT BEEN FIELD VERI FIED_NEORMATIO—B ULDBEFFLDYEAIFFDAN CotiFARECWF--RIDMIAi SOl1RCE CGCOWNTS. Page 4 ABSTRACT OF BIDS TROY LANE RECONSTRUCTION CITY OF PLYMOUTH, MINNESOTA BMI PROJECT NO 015.115271 H:VPLYMVC15115271% Plans-Specsl8 Bid Ta6ulationl 115271 Bid Adstmctxls P:;:w' I Page 5 1 2 3 4 5 6 GMH ASPHALT C.S. McCROSSAN MINGER CONSTRUCTION MIDWEST CIVIL LANDWEHR BITUMINOUS ROADWAYS Chaska, MN Maple Grove, MN Jordan, MN Shakopee, MN St. Cloud, Mn Mendota Heights, MN ITEM APPROX, UNIT UNIT UNIT UNIT UNIT UNIT NO. BID ITEM QUAN. UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1 MOBILIZATION 1 LUMP SUM $40,000,00 $40,000.00 $41,000.00 $41,000.00 $43,000.00 $43,000.00 $42,500.00 $42,500.00 $78,000.00 $78,000.00 $50,000.00 $50,000.00 2 CLEARING 3 TREE $536.00 $1,608.00 $600.00 $1,800.00 $245.00 $735.00 $500.00 $1,500.00 $255.00 $765.00 $548.00 $1,644.00 3 GRUBBING 3 TREE $536.00 $1,608.00 $600.00 $1,800.00 $256.00 $768.00 $500.00 $1,500.00 $266.00 $798.00 $573.00 $1,719.00 4 REMOVE PIPE SEWER (STORM) 90 LIN FT $3,17 $285.30 $15.00 $1,350.00 $18.35 $1,651.50 $6,00 $540.00 $15.00 $1,350.00 $13.40 $1,206.00 5 REMOVE STRUCTURE (STORM) 6 EACH $281.33 $1,687.98 $345.00 $2,070.00 $183.50 $1,101.00 $35.00 $210.00 $115.00 $690.00 $347.00 $2,082.00 6 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 336 SQ FT $3.00 $1,008.00 $1.20 $403.20 $0.65 $218.40 $1.50 $504.00 $2.00 $672.00 $1.50 $504.00 7 REMOVE BITUMINOUS PAVEMENT 5,370 SO YD $3.20 $17,184.00 $0.75 $4,027.50 $4.25 $22,822.50 $5.50 $29,535.00 $4.00 $21,480.00 $5.40 $28,998.00 8 REMOVE CONCRETE DRIVEWAT PAVEMENT 303 SO FT $1.50 $454.50 $1.30 $393.90 $1.90 $575.70 $1,50 $454.50 $2.00 $606.00 $1.10 $333.30 9 REMOVE CONCRETE WALK 210 SQ FT $1.00 $210.00 $1.30 $273.00 $1.50 $315.00 $1.50 $315.00 $2.25 $472.50 $1.40 $294.00 10 SALVAGE SIGN TYPE C 5 EACH $31.70 $158.50 $55.00 $275.00 $33.40 $167.00 $30.00 $150.00 $57.00 $285.00 $33.10 $165.50 11 SALVAGE CASTING 2 EACH $200.00 $400.00 $155.00 $310.00 $154.00 $308.00 $150.00 $300.00 $115.00 $230.00 $256.00 $512.00 12 COMMON EXCAVATION (EV) (P) 4,385 CU YD $2625 $115,106.25 $20.00 $87,700.00 $18.75 $82,218.75 $18.00 $78,930.00 $17.00 $74,545.00 $30.00 $131,550.00 13 COMMON BORROW (CV) 1,300 CU YD $11.50 $14,950.00 $8.00 $10,400.00 $6.75 $8,775.00 $16.50 $21,450.00 $6.00 $7,800.00 $30.00 $39,000.00 14 SUBGRADE EXCAVATION (EV) 1,100 CU YD $14.70 $16,170.00 $20.00 $22,000.00 $22.00 $24,200.00 $15.00 $16,500.00 $16.00 $17,600.00 $30.00 $33,000.00 15 SELECT GRANULAR BORROW (CV) 3,292 CU YD $16.70 $54,976.40 $16.00 $52,672.00 $27.00 $88,884.00 $17.50 $57,610.00 $26.30 $86,579.60 $45.00 $148,140.00 16 SUBGRADE PREPARATION (P) 6,577 SQ YD $0.75 $4,932.75 $1.00 $6.577.00 $1.25 $6,221.25 $1.00 $6,577.00 $2.40 $15,784.80 $1.60 $10,523.20 17 GEOTEXTILE FABRIC, TYPE V 6,577 SQ YD $1.50 $9,855.50 $2.10 $13,611.70 $0.45 $2,959.65 $1.00 $6,577.00 $1.50 $9,865.50 $1.30 $8,550.10 18 AGGREGATE SURFACING CLASS 5 (DRIVEWAY) 40 TON $30.00 $1,200.00 $35.00 $1,400,00 $30.50 $1,220.00 $24.00 $960.00 $41.00 $1,640.00 $30.00 $1,200.00 19 AGGREGATE BASE CLASS 5 (P) 1,461 CU YD $6.85 $10,007.85 $35.00 $51,135.00 $33.00 $48,213.00 $33.50 $48,943.50 $33.65 $49,162.65 $45.00 $65,745.00 20 TYPE SP 9.5 WEARING COURE MIX (3,C) 464 TON $88.75 $41,180.00 $68.00 $31,552.00 $84.55 $39,231.20 $76.00 $35,264.00 $84.00 $38,976.00 $85.00 $39,440.00 21 TYPE SP 12.5 NON WEAR COURSE MIXTURE (3,C) 774 TON $73.65 $57,005.10 $60.00 $46,440.00 $79.00 $61,146.00 $71.00 $54,954.00 $80.00 $61,920.00 $75.00 $58,050.00 22 12" RC PIPE APRON WI TRASH GUARD 2 EACH $1,287.00 $2,574.00 $1,300.00 $2,600.00 $1,130.50 $2,261.00 $1,200.00 $2,400.00 $988.00 $1,976.00 $1,09800 $2,196.00 23 24" RC PIPE APRON WI TRASH GUARD 1 EACH $1,709.00 $1,709.00 $2,000.00 $2,000.00 $1,943.00 $1,943.00 $1,700.00 $1,700.00 $1,433.00 $1,433.00 $1,626.00 $1,626.00 24 6" PERF PVC PIPE DRAIN 2.785 LIN FT $9.00 $25,065.00 $15.50 $43,167.50 $8.65 $24,090.25 $9.00 $25,065.00 $8.70 $24,229.50 $22.00 $61,270.00 25 6" PVC PIPE DRAIN CLEANOUT 15 EACH $250.00 $3,750.00 $375.00 $5,625.00 $256.00 $3,840.00 $150.00 $2,250.00 $285.00 $4,275.00 $252.00 $3,780.00 26 12" RC PIPE SEWER DESIGN 3006 CLASS V 1,131 LIN FT $31.65 $35,796.15 $37.00 $41,847.00 $40.40 $45,692.40 $46.00 $52,026.00 $38.25 $43,260.75 $49.30 $55,758.30 27 24" RC PIPE SEWER DESIGN 3006 CLASS III 158 LIN FT $45.89 $7,250.62 $54.50 $8,611.00 $55.00 $8,690.00 $65.00 $10,270.00 $53.50 $8,453.00 $66.60 $10,522.80 $601.00 $5,493.14 $700.00 $6,398.00 $904.00 $8,262.56 $670.00 $6,123.80 $570.00 $5,209.80 $908.00 $8,299.12 28 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4020-60 9.14 LIN FT 29 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4020-48 68.35 LIN FT $377.00 $25,767.95 $395.00 $26,998.25 $424.00 $28,980.40 $350.00 $23,922.50 $342.00 $23,375.70 $603.00 $41,215.05 30 CONSTRUCT DRAINAGE STRUCTURE DESIGN 2'x T 15. B7 LIN FT $357.00 $5,665,59 $270.00 $4,284.90 $467.00 $7,411.29 $340.00 $5,395.80 $282.00 $4,475.34 $491.00 $7,792.17 31 6 X 3 PRECAST CONCRETE BOX CULVERT 104 LIN FT $605.00 $62,920.00 $900.00 $93,600.00 $508.00 $52,832.00 $845.00 $87,880.00 $544.00 $56,576.00 $972.00 $101,088.00 32 6 X 3 PRECAST CONCRETE BOX CULVERT END SECTION 4 EACH $2,848.00 $11,392.00 $4,000.00 $16,000.00 $5,500.00 $22,000.00 $8,300.00 $33,200.00 $5,520.00 $22,080.00 $3,636.00 $14,544.00 33 12" PRESERVER 1 EACH $791.00 $791.00 $4,000.00 $4,000.00 $3,897.00 $3,897.00 $4,000.00 $4,000.00 $700.00 $700.00 $2,764.00 $2,764.00 34 48" BAFFLE 2 EACH $5,486.00 $10,972.00 $6,000.00 $12,000.00 $3,505.50 $7,011.00 $5,500.00 $11,000.00 $5,230.00 $10,460.00 $4,386.00 $8,772.00 35 RANDOM RIPRAP CLASS III 57.40 TON $63.30 $3,633.42 $100.00 $5,740.00 $63.00 $3,616.20 $60.00 $3,444.00 $67.00 $3,845.80 $146.00 $8,380.40 36 RANDOM RIPRAP CLASS IV 238 TON $68.60 $16.326.80 $90.00 $21.420.00 $65.00 $15,470.00 $60.00 $14.260.00 $67.00 $15,946.00 19146.00 $34,748.00 H:VPLYMVC15115271% Plans-Specsl8 Bid Ta6ulationl 115271 Bid Adstmctxls P:;:w' I Page 5 ITEM NO. BID ITEM 37 CASTING ASSEMBLY (STORM) 38 ADJUST VALVE BOX 39 ADJUST CURB STOP 40 6" GATE VALVE AND BOX 41 DUCTILE IRON FITTINGS 42 6" PVC C900 DR25 WATERMAIN 43 12" X 6" WET TAP 44 6" PVC SDR 26 SERVICE PIPE 45 CONNECT TO EXISTING SANITARY SEWER 46 4" POLYSTYRENE INSULATION 47 ADJUST FRAME & RING CASTING (STORM) 48 ADJUST FRAME & RING CASTING (SANITARY) 49 6" CONCRETE DRIVEWAY (COLORED) 50 3" BITUMINOUS DRIVEWAY 51 3" BITUMINOUS TRAIL 52 CONCRETE CURB & GUTTER DESIGN B618 53 6" CONCRETE WALK (PEO RAMPS) 54 TRUNCATED DOMES 55 TRAFFIC CONTROL 56 INSTALL SIGN TYPE C 57 SALVAGE & INSTALL LIGHT POLE 58 SILT FENCE, TYPE MS 59 DITCH CHECK - BIOLOG 60 STORM DRAIN INLET PROTECTION 61 STABILIZED CONSTRUCTION EXIT 62 RAPID STABILIZATION (METHOD 3) 63 EROSION CONTROL SUPERVISOR 64 TOPSOIL BORROW (CV) 65 EROSION CONTROL BLANKET CAT. 3 W1 SEED MIX 25-131 66 EROSION CONTROL BLANKET CAT, 3 WI SEED MIX 35-221 67 EROSION CONTROL BLANKET CAT, 3 W1 SEED MIX 33-261 68 HYDROMULCH W1 SEED MIX 25-151 69 4" SOLID LINE WHITE -PAINT 70 4" DOUBLE SOLID LINE YELLOW -PAINT DENOTES ERROR ON ORIGINAL BID APPROX UNIT 4UAN. UNIT PRICE MN Maple 19 EACH $723.00 4 EACH $280.00 1 EACH $100.00 1 EACH $1,547.00 16 LBS $10.55 MN Maple AMOUNT UNIT PRICE $13,737.00 $1,100.00 $1,120.00 $400.00 $100.00 $400.00 $1,547.00 $1,500.00 $168.80 $20,00 60 1 70 1 15 2 4 306 336 14,695 3,808 1,225 120 1 5 2 2,940 260 27 2 500 1 150 1,873 1,170 716 334 3,413 1,835 LIN FT EACH LIN FT EACH SQ YD EACH EACH SQ FT SQ FT SQ FT LW FT SO FT SQ FT LUMP SUM EACH EACH LEN FT LIN FT EACH EACH SQ YD LUMP SUM CU YD SQ YD SQ YD SO YD SQ YD LIN FT LIN FT TOTAL SID: $23.21 $1,392.60 $85.00 $3,270.00 $3,270.00 $5,000.00 $31.65 $2,215.50 $43.50 $1,266.00 $1,266.00 $2,000.00 $38.00 $570-00 $28.00 $400.00 $800.00 $700.00 $635.00 $2,540-00 $700.00 $15.30 $4,681.80 $15.00 $3.30 $1,108.80 $5.40 $2.65 $38,941.75 $2.50 $15,25 $58,072.00 $15.50 $9.00 $11,025.00 $9.40 $58.00 $6,960.00 $45.00 $28,600,00 $28,600.00 $6,000.00 $264.00 $1,320.00 $270.00 $2,000.00 $4,000.00 $5,000.00 $2.05 $6,027.00 $2.70 $2.64 $686.40 $2.70 $100.00 $2,700.00 $380.00 $750.00 $1,500.00 $1,300.00 $0.27 $135.00 $2.20 $6,128.00 $6,128.00 $2,000.00 $30.00 $4,500.00 $35.00 $1.32 $2,472.36 $2.00 $1.32 $1,544.40 $2.20 $1.32 $945.12 $2.20 $1.32 $440.88 $2.20 $0.21 $716.73 $0.35 $0.42 $770,70 $821,107.64 $0.75 MN Jordan, MN Shak AMOUNT UNIT PRICE AMOUNT UNIT PRICE $20,900.00 $941.00 $17,879.00 $720.00 $1,600.00 $184.00 $736.00 $530.00 $400.00 $184.00 $184.00 $180.00 $1,500.00 $2,200.00 $2,200.00 $1,850.00 $320.00 $95.50 $1,528.00 $17.00 $5.100.00 $45.00 $2.700.00 $84.00 $2,000.00 St_ Cloud, Mn $3,363.00 $420.00 UNIT $19.40 $1,400.00 $600.00 $315.50 $2,800.00 $600.00 $315.50 $4.590.00 $14.00 $14.30 $1,814.40 41,146.00 $4.65 36,737.50 55,168.00 $2.60 59,024.00 18,865.00 $14.75 11,515.00 $6,942.00 $15.40 $5,400.00 $5,562.50 $57.85 $6,000.00 $1,390.00 $5,562.50 $1,350.00 22,028.00 $278.00 10,000.00 $4.851.00 $11,014.00 $7,938.00 $2.244.00 $1.65 $702.00 $4.25 $2.80 10,260.00 $4.10 $156.00 $2,600.00 $0.20 $1,400.00 $1,100.00 $0.44 $0.30 $2,000.00 $0.40 $5,000.00 $5,250.00 $0.88 $37.00 $3,746.00 $1.40 $2,574.00 98.591.80 $1.40 $1,575.20 $1.40 $734.80 $1.40 $1,194.551 $0.20 $1,376.25 $0.45 93.648.65 $3,363.00 St_ Cloud, Mn $780.00 $291.00 UNIT $48.00 $631.00 $600.00 $1,262.00 PRICE $600.00 $4,375.80 AMOUNT $14.00 $1,562.40 $4.30 41,146.00 $17,480. $2.60 55,168.00 $480.00 $13.25 18,865.00 $180.00 $14.25 $6,942.00 $172.00 $52.00 $5,562.50 $1,516.00 $10,000.00 $1,390.00 $1,878. $250.00 22,028.00 $128.00 $4,800.00 $4.851.00 $5.040.00 $2.10 MN St_ Cloud, Mn Mendota Heights, MN 2,400.00 UNIT $1,200.0 UNIT $17.00 AMOUNT PRICE AMOUNT PRICE AMOUNT $13,680.00 $760.00 $14,440.00 $920.00 $17,480. $2,120.00 $120.00 $480.00 $266.00 $1.064. $180.00 $220.00 $220.00 $172.00 $172. $1,850.00 $1,516.00 $1,516.00 $1,876.00 $1,878. $272.00 $8.00 $128.00 $14.20 $227. $5.040.00 $37.40 $2.244.00 $44.10 $2,646. 1,200.00 $300.00 $600.0 2,400.00 $300.00 $1,200.0 4,284.00 $17.00 $5,202.0 1,444.80 $4.85 $1,629.6 8,207.00 $3.18 $46,730.1 0,456.00 $15.20 $57,881.6 7,456.25 $17.50 $21,437.5 1,250.00 $228.00 $1,1 9,600.00 $11,925.00 $23,8 5.174.00 $2.00 $5.E $2,800.00 $1,500.00 $3,000.00 $80 $1,800.00 $2 $150.00 $2.45 $1,225.00 $5,50 $2.40 $1 $5,000.00 $10,000.00 $107000.00 $95,21] $2,500.00 $2 $5,550.00 $33.00 $4,950.00 $20,00 $50.00 $7 $2,622.20 $1.95 $3,652.35 $6,70 $1.90 $2 $1,638.00 $2.15 $2,515.50 $3,51 $2.00 $2 $1,002.40 $2.30 $1,646.80 $9,75 $2.10 $1 $467.60 $4.25 $1,419.50 $1,71 $4.10 $1 $682.60 $0.20 $682.60 $0.44 $1 $825.75 $0.40 $734.00 $0.88 $1 98.591.80 590-8.940.90 $938 $1,656.00 $1,65 $57.50 $80 $492.00 $98 $492.00 $1,96 $18.00 $5,50 $3.60 $1,21] $1.75 $25,71 $25.00 $95,21] $18.00 $22,05 $66.20 $7,94 20,000.00 $20,00 $1,379.00 $6,89 10,500.00 $21,00 $2.30 $6,70 $4.10 $1,06 $271.00 $7,31 $1,757.00 $3,51 $2.70 $1,35 $2,365.00 $2,36 $65A0 $9,75 $2.00 $3,74 $2.20 $2,57 $2.40 $1,71 $4.50 $1,50 $0.22 $75 Yi H:TLYMIC15115271V6_Plans-Spat G_Bid Tabulaticr1115271 Bid Abstrad.xls Page? Page 6 p BOLTON & MENK Real People. Real Solutions. May 24, 2018 City of Plymouth Atm: Mike Payne, PE 3400 Plymouth Boulevard Plymouth, MN 55447 RE: Troy Lane Reconstruction - Award Recommendation Letter Honorable Mayor and City Council Members: 2638 Shadow Lane Suite 200 Chaska, MN 55318-1172 Ph: (9521448-8838 Fax: (9521448-8805 Bolton-Menk.com Bids were received for the above referenced project on May 24, 2018. Six bids were received and are tabulated below. The low bid was submitted by GMH Asphalt Company from Chaska, MN. CONTRACTOR TOTAL AMOUNT B[D GMH Asphalt $821,107.64 C.S. Mccrossan Construction $893,648.65 Minger Construction $898,591.80 Midwest Civil Constructors $908,940.90 Landwehr Construction $938,200.46 Bituminous Roadways $1,270,716.45 Evaluation of the bids indicates the bidding process was very competitive. The low bid submitted was 32% below the engineer's estimated amount of $1,200,000.00 and 35% below the high bid of $1,270,716.45. GMH Asphalt has successfully completed projects of this type in the past and thereby have shown themselves to be a responsible contractor. Based on the items above, we recommend the City award a contract in the amount of $821,107.64 to GMH Asphalt Co. Respectfully Submitted, BOLTON & MENK, INC. Joshua Eckstein, P.E. Cc: Dan Lonnes, Bolton & Menk Page 7 Troy Lane Reconstruction Project Assessment Roll ST180002 PID Owner 1 Owner 2 Address City, State, Zip Assessment 6-118-22-21-0009 GANG QIAN TING ZHANG 1719 RUPERT ST MCLEAN VA 22102 $ 16,798.84 6-118-22-24-0002 STANISLAV A SIDORENKO LARISSA N SIDORENKO 5915 TROY LN N PLYMOUTH MN 55446 $ 7,164.81 6-118-22-24-0003 JIM W BRENNAN CONNIE M BRENNAN 5905 TROY LN N PLYMOUTH, MN 55446 $ 21,615.86 6-118-22-24-0004 PULTE HOMES OF MN LLC 7500 FLYING CLOUD DR # 671 EDEN PRAIRIE MN 55344 $ 41,207.76 6-118-22-24-0005 PULTE HOMES OF MN LLC 7500 FLYING CLOUD DR # 67( EDEN PRAIRIE MN 55344 $ 27,161.50 6-118-22-24-0006 LAWNDALE 47 LLC 10850 OLD COUNTY RD 15 #: PLYMOUTH MN 55441 $ 31,776.12 6-118-22-31-0006 PULTE HOMES OF MN LLC 7500 FLYING CLOUD DR # 671 EDEN PRAIRIE MN 55344 $ 7,286.24 6-118-22-31-0007 JAY P NELSON JOAN C NELSON 5755 VAGABOND LN N PLYMOUTH, MN 55446 $ 10,848.41 6-118-22-31-0008 SETH I MIDURA JESSICA A MIDURA 5700 VAGABOND LN N PLYMOUTH MN 55446 $ 15,382.07 Page 8 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION ORDERING IMPROVEMENT FOR THE TROY LANE RECONSTRUCTION PROJECT (ST180002) WHEREAS, the City Council adopted a resolution on the 24th day of April, 2018, which fixed a date for a council hearing on the proposed improvement of Troy Lane 375 feet south of County Road 47 to 56th Place North by street reconstruction, installation of concrete curb and gutter, storm sewer, and all necessary appurtenances; and WHEREAS, a minimum ten days mailed notice and two weeks published notice of the hearing was given, and the hearing was held thereon the 12th day of June, 2018, at which all persons desiring to be heard will be given an opportunity to be heard thereon. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plymouth City Council of the City of Plymouth, Minnesota: 1. Such improvement is ordered as proposed in the Council resolution adopted June 12, 2018. 2. The City Council declares its official intent to reimburse itself for the costs of the improvement from the proceeds of the tax exempt bond or other sources as identified in the feasibility report. APPROVED by the City Council on this 12th day of June, 2018. Page 9 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION ADOPTING ASSESSMENTS FOR THE TROY LANE RECONSTRUCTION PROJECT (ST180002) Whereas, pursuant to proper notice duly given as required by law, the Council has met and heard and passed upon all objections to the proposed assessment for the improvement of Troy Lane 375 feet south of County Road 47 to 56th Place North by street reconstruction, installation of concrete curb and gutter, storm sewer, and all necessary appurtenances. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA: 1. Such proposed assessment, a copy of which is attached hereto and made a part hereof, is accepted and shall constitute the special assessment against the lands named therein, and each tract of land therein included is hereby found to be benefited by the proposed improvement in the amount of the assessment levied against it. 2. Such assessments between $0 and $5,000 shall be payable in equal annual installments extending over a period of 5 years, the first of the installments to be payable on or before the first Monday in January, 2019, and shall bear the interest rate of 3.22% per annum for a 5 year assessment period. Therefore, the first installment shall be added interest on the entire assessment from November 1, 2018 until December 31, 2019. To each subsequent installment when due shall be added interest for one year on all unpaid installments. 3. Such assessments between $5,001 and $10,000 shall be payable in equal annual installments extending over a period of 10 years, the first of the installments to be payable on or before the first Monday in January, 2019, and shall bear the interest rate of 3.54% per annum for a 10 year assessment period. Therefore, the first installment shall be added interest on the entire assessment from November 1, 2018 until December 31, 2019. To each subsequent installment when due shall be added interest for one year on all unpaid installments. 4. Such assessments over $10,000 shall be payable in equal annual installments extending over a period of 15 years, the first of the installments to be payable on or before the first Monday in January, 2019, and shall bear the interest rate of 3.8% per annum for a 15 year assessment period. Therefore, the first installment shall be added interest on the entire assessment from November 1, 2018 until December 31, 2019. To each subsequent installment when due shall be added interest for one year on all unpaid installments. 5. The owner of any property so assessed may, at any time prior to certification of the assessment to Hennepin County, pay the whole of the assessment on such property Page 10 with interest accrued to the date of payment to the City of Plymouth Finance Department, except that no interest shall be charged if the entire assessment was paid by October 31, 2018 and the property owner may at any time thereafter, pay the City of Plymouth Finance Department the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made by November 15 or interest will be charged through December 31 of the next succeeding year. The owner of any property so assessed may also, until October 31, 2018, make a partial payment of a least $100 to the City of Plymouth Finance Department. The remaining unpaid balance will be certified as the new assessment amount. The owner may also at any time prior to November 15, of any year, pay the remaining unpaid principal balance with interest accrued to November 15 of the year in which such prepayment is made. 6. The Clerk shall forthwith transmit a certified duplicate of this assessment to Hennepin County to be extended on the property tax lists of the County. Such assessments shall be collected and paid over in the same manner as other municipal taxes. The total cost of the improvement assessed by this resolution is $179,241.61. APPROVED by the City Council on this 12th day of June, 2018. STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on March 13, 2018 with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk Page 11 CITY OF PLYMOUTH RESOLUTION N0. 2018 - RESOLUTION AWARDING CONTRACT FOR THE TROY LANE RECONSTRUCTION PROJECT (ST180002) WHEREAS, pursuant to an advertisement for bids for the Troy Lane Reconstruction Project, bids were received, opened and tabulated according to State law, and the following bids were received complying with the advertisement: Contractor Total Base Bid GMH Asphalt Corporation $821,107.64 C.S. McCrossan $893,648.62 Minger Construction $898,591.80 Midwest Civil Constructors $908,940.90 Landwehr Construction $938,200.46 Bituminous Roadways $1,270,716.45 Engineers Estimate $1,122,381.15 WHEREAS, it appears that GMH Asphalt Corporation, of Chaska, MN, is the lowest responsible bidder, complying with the minimum qualifications; and WHEREAS, the City Engineer recommends awarding the project to GMH Asphalt Corporation of Chaska, MN. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that the appropriate City Officials are authorized and directed to enter into the contract with GMH Asphalt Corporation of Chaska, MN, in the name of the City of Plymouth for the Troy Lane Reconstruction Project according to the plans and specifications therefore approved by the City Council and on file in the office of the City Engineer in the amount of $821,107.64. BE IT FURTHER RESOLVED, that the project would be funded from the following sources: assessments in the amount of $179,241.61 and the Street Reconstruction Fund in the amount of $860,241.42. APPROVED by the City Council on this 12th day of June, 2018. Page 12 MR) City of Plymouth Adding Qoofity to Life REGULAR COUNCIL MEETING June 12, 2018 Agenda 8001 Number: To: Dave Callister, City Manager Prepared by: Paul Buck, Forester Reviewed by: Diane Evans, Director of Parks and Recreation Item: Consider Emerald Ash Borer Management Plan Initiatives 1. ACTION REQUESTED: Adopt attached resolution approving new Emerald Ash Borer Management Plan initiatives in the amount of $81,850. 2. BACKGROUND: On January 25, 2011, Council adopted the Emerald Ash Borer (EAB) Management plan in preparation for this invasive insect. In early 2011, approximately 300 small or unhealthy park ash trees were pre-emptively removed. These trees were replaced during the fall of 2011 with 10 different varieties of trees. Spring of 2014, staff began EAB treatment of ash trees on boulevards and in park proper which were in good health and measuring greater than 15 inches in diameter. Ash trees are chemically treated every two years. In the fall of 2015, EAB was identified in six trees on the southeast corner of Medicine Lake. This past winter, 62 additional EAB infested ash trees were removed in the woods adjacent to the original Plymouth find. To lower the current ash tree population and slow the spread of the borer, staff proposes pre- emptive removal and replacement of boulevard and private property ash trees as follows. Boulevard Ash Trees Boulevard ash trees 5 inches or greater in diameter and not currently treated would be eligible for removal and replacement. To increase tree diversity and lessen the impact of future tree problems, up to 10 different species would be replanted. Property owners would pledge to water the new trees using a water bag for three years. If the abutting property owner does not want a new tree or is unwilling to water, the tree would be removed with no replacement. Residential Property Ash Trees As an incentive to remove untreated ash trees on private property, property owners would be offered replacement bare root trees in exchange for removal of ash trees 5 inches or greater in diameter. To increase tree diversity and lessen the impact of future tree problems, up to 10 different species would be offered. A maximum of four bare root trees per property would be eligible, with a maximum of 1,000 trees per year, on a first come, first served basis. Removal Page 1 verification would include a contractor invoice and/or time stamped before and after photo. As with the boulevard removal and replacement program, the goal is to replace lost canopy cover due to EAB while lessening the available ash population for infestation. 3. BUDGET IMPACT: Pre-emptive boulevard and private removals, would be funded from the Tree Preservation Fund (660-10-110-11092) which has a fund balance of over $700,000. The boulevard ash tree replacement: 437 $21,850 A "Managing Ash for EAB in Community Forests" grant through the Minnesota Department of Natural Resources (DNR) will be submitted and may cover the entire cost of the boulevard replacement trees. The private tree removal and replacement: The combined EAB projects (boulevard and private property) would cost $81,850 pending the determination of the "Managing Ash for EAB in Community Forests" grant from the DNR. 4. ATTACHMENTS: Map Resolution Page 2 2020 1,000 $30,000 2021 1,000 $30,000 Total 2,000 $60,000 The combined EAB projects (boulevard and private property) would cost $81,850 pending the determination of the "Managing Ash for EAB in Community Forests" grant from the DNR. 4. ATTACHMENTS: Map Resolution Page 2 EAB Removals since 2016 ' 25TH AVE N J.t 4 AW ir LU J O O LU t Q Park Assets r°� 0 35 70 City of File Path - M:IPIy_gislPrcjects1Park Assets.pmf Plymouth, Minnesota "S Fir, 23RD AVE N 140 210 I Feet Legend Date -of -Completion A 2016 jo 2018 THIS REPRESENTS A COMPILATION OF INFORMATION AND DATA FROM CITY, COUNTY, STATE AND OTHER SOURCES THAT HAS NOT BEEN FIELD VERIFIED. INFORMATION SHOULD BE FIELD VERIFIED AND COMPARED WITH ORINGIAL SOURCE DOCUMENTS. Page 3 T CITY OF PLYMOUTH RESOLUTION No. 2018 - RESOLUTION APPROVING EMERALD ASH BORER MANAGEMENT PLAN INITIATIVES WHEREAS, the City of Plymouth, adopted and approved an Emerald Ash Borer Management Plan by the City Council on January 1, 2011; and WHEREAS, the Parks and Forestry Division is currently treating approximately 900 large legacy ash trees in City parks and boulevards; and WHEREAS, the original infestation site has expanded in the last two years; and WHEREAS, to lower the current ash population, staff proposes two new initiatives, pre-emptive removal and replacement of boulevard ash trees and pre-emptive removal and replacement of private ash trees; and WHEREAS, boulevard ash trees 5 inches or greater in diameter and not currently treated would be eligible for removal and replacement from September 2018 — December 2019; and WHEREAS, an incentive to remove untreated ash trees on private property, property owners would be offered up to four replacement bare root trees in exchange for removal of ash trees 5 inches or greater in diameter from September 2018 — March 2020 on a first come, first served basis up to a 1,000 trees during the September — March removal date timeline; and WHEREAS, pre-emptive boulevard and private removals, would be funded from the Tree Preservation Fund (660-10-110-11092) which has a fund balance of over $700,000; and WHEREAS, a "Managing Ash for EAB in Community Forests" grant through the Minnesota Department of Natural Resources (DNR) will be submitted and may cover the entire cost of the boulevard replacement trees NOW, THEREFORE BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that two initiatives of incentivizing pre-emptive ash tree removals on boulevards and private property be added to the Emerald Ash Borer Management Plan is approved. The $81,850 cost of the program will be covered by the "Managing Ash for EAB in Community Forests" grant or from the Tree Preservation Fund (660-10-110-11092). APPROVED by the City Council on this 12th day of June, 2018. Page 4