HomeMy WebLinkAboutCity Council Resolution 2017-010 C ITY OF P LYMOUTH R ESOLUTION N O. 2017-010 R ESOLUTION A PPROVING W ORK O RDERS N O. 7 THROUGH 20 FOR V ICKSBURG L ANE R ECONSTRUCTION AND E XPANSION P ROJECT (16001) WHEREAS, Work Order No. 7 is to replace a water service; and WHEREAS, Work Order No. 8 is for additional sanitary sewer work; and WHEREAS, Work Order No. 9 is for the installation of new fire hydrants; and WHEREAS, Work Order No. 10 is to replace conduit for irrigation under 60th Avenue; and WHEREAS, Work Order No. 11 is for channel excavation from two flared end sections to the receiving water body; and WHEREAS, Work Order No. 12 is for replacement of subgrade soils that became saturated during testing; and WHEREAS, Work Order No. 13 is for stabilization of the trail in an area of poor soils and connection of an existing sump discharge into the street draintile system; and WHEREAS, Work Order No. 14 is for the installation of guardrail on Bridge No. 27B99; and WHEREAS, Work Order No. 15 is to provide material to match the existing material at all gravel driveways impacted on the project; and WHEREAS, Work Order No. 16 is to install landscape rock behind the existing large modular block retaining walls; and WHEREAS, Work Order No. 17 is for modifications to the traffic control plan; and WHEREAS, Work Order No. 18 is to raise the elevation of an existing hydrant to match the new grade; and WHEREAS, Work Order No. 19 is to adjust the location of APS pushbuttons, install an additional APS push button, and to replace three EVP detectors; and WHEREAS, Work Order No. 20 is to stain the large modular block retaining wall from project 15001 (Vicksburg Lane Reconstruction and Expansion Project). NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA that Work Orders No. 7 through 20 in the total amount of $67,448.23 are approved. APPROVED by the City Council on this 10th day of January, 2017.