HomeMy WebLinkAboutPark and Recreation Advisory Commission Packet 09-08-1994Regular Meeting of the Park and Recreation Advisory Commission
September 8, 1994, 7•.30 p.m. (note later starting time)
AGENDA
1. Call to Order
2. Approval of Minutes
3. Visitor Presentations
a. Athletic Associations
b. Staff
c. Others
4. Report on Past Council Action
a. Award bid accessible playground
b. Reject bid Seven Ponds/Heather Run Park
c. Approved sale of property at Zachary & County Road 9
d. Approved sale of Luce Line Trail
5. Unfinished Business
a. Study of unique open spaces update
b. Accessible playground update
c. 1994 trait construction projects update
d. Seven Ponds neighborhood park update
e. West Medicine Lake City Park update
f. Playfield/highschool update
6. New Business
a. Review and discussion of park/trail plan and CIP
b. Discuss council resolution no. 94-507
C.
7. Commission Presentation
8. Staff Communication
NRPA Congress Oct. 12-15, Minneapolis
9. Adjourn
Next Regular Meeting - October 13
Minutes of the Park and Recreation Advisory Commission Meeting
July 14, 1994
Page 21
Present: Chair Anderson, Commissioners Bildsoe, Johnson, Mikula, Priebe (observing),
Wahl, Willegalle; staff Blank and Pederson
Absent: Commissioner Fiemann
1. CALL TO ORDER
Chair Anderson called the July meeting to order at 7:10 p.m. in the Council Conference
Room.
2. APPROVAL OF MINUTES
A motion was made by Commissioner Willegalle and seconded by Commissioner Wahl to
approve the minutes of the June meeting as presented. The motion carried with all ayes.
3. VISITOR PRESENTATIONS
a. Athletic Associations. None were present.
b. Staff. None were present.
c. Others. None were present.
4. PAST COUNCIL ACTION
a. Council approved the master plan for West Medicine Lake City Park. A soils analysis
consultant and survey work consultant will be hired as soon as possible to begin their
respective tasks. Director Blank briefly discussed the letter received from residents who
oppose the location of the tennis and basketball courts. He shared with commissioners a
copy of his written response to these residents and indicated that when the design
consultant begins the more detailed work on the location of these particular facilities, the
residents will be invited to come in and discuss their concerns. Commissioner Johnson
commented that the individual who wrote the letter objecting to the location of the
basketball court has a son who frequently plays basketball at Commissioner Johnson's
residence.
b. Council approved the master plan for Seven Ponds neighborhood park. Excess fill from
another development has been delivered to this site, which will reduce some of the
construction costs. Director Blank hopes to have bids from contractors in by August 1
with Council awarding the construction contract on August 15. Work could then begin
on or about September 1. Staff is meeting with a resident who is next to one of the
proposed trail entrances.
c. Council officially approved the 1994-98 CIP at a recent meeting. Many projects that
were part of the 1994 capital improvements budget were delayed, but will now be able
to get underway.
d. Council awarded the construction contract for the accessible playground to Earl F.
Andersen and Associates. Director Blank said it will take approximately six weeks to
build the playground and about another six weeks to install it. This is one of the largest
playground manufacturers in the country, and this particular play structure will be a
major feature in their next catalog.
5. UNFINISHED BUSINESS
a. Study of unique open spaces. Director Blank explained that the Open Space Committee
has been meeting every other week for the past several months reviewing several sites
and attempting to prioritize them for preservation and possible acquisition. There are
two sites at the present time that are proposed for development in the immediate future.
Both sites have been ranked high for preservation, and the Open Space Committee has
made a recommendation that both of these sites be acquired. One is the Daniel
Development site, located near Cardinal Ridge in the northeast corner of Plymouth.
The City currently owns a large parcel adjacent to this site which has been identified as
a future neighborhood park. Director Blank stated that Council has directed him to
negotiate the possible purchase of additional land here, because the developer has
indicated a willingness to sell some of the property to the city. The other site is adjacent
to French Park and is owned by Mission Partnership. Commissioner Wahl stated that
Hennepin Parks has indicated that if this site is acquired, they will accept the property as
part of French Park and will manage it, if the City will help to acquire it. Director
Blank indicated that negotiations to acquire this site have begun with the hiring of an
appraiser to determine the value of the property. The owner of the property and the city
are sharing the cost of the appraisal.
Some residents from Cardinal Ridge were present on behalf of acquiring additional
property from Daniel Development. Robert Hammer was concerned about a July 31
deadline that was given to the City by the developer to acquire the property or else
development would begin. Another resident commented that she thought the deadline
had been relaxed, once it became apparent that the developer and the city were
discussing the possible acquisition of some of the property. Carla Novak, another
Cardinal Ridge resident, commented on the natural features of the area and stated that it
was one of the things that attracted her to the area in the first place. She encouraged the
City to acquire the property. Ken Wendinger, also from Cardinal Ridge, commented
that these are prime wetlands, a valuable asset to the city and should be preserved.
The following motion was made by Commissioner Wahl and seconded by Commissioner
Johnson based on a recommendation made by the Open Space Committee at their
meeting just prior to the PRAC meeting: WHEREAS, SITES #4 AND #7 ARE
HIGHLY RANKED AND ARE UNDER THE THREAT OF DEVELOPMENT, AND
WHEREAS SITES #4 AND #7 EACH HAVE THEIR OWN UNIQUE NATURAL
FEATURES, IT IS RECOMMENDED THAT THE CITY COUNCIL PURSUE THE
ACQUISITION OF AS MUCH OR ALL OF BOTH SITES AS IS ECONOMICALLY
FEASIBLE. The motion carried with all ayes.
Commissioner Wahl asked for PRAC's indulgence to modify this motion if necessary
before forwarding it to the City Council, if it had not been properly interpreted from the
earlier Open Space meeting.
Chair Anderson commented that the work of the Open Space Committee isn't finished at
this time and that they will continue to meet on a regular basis. They still plan to
present some sort of master plan to the Park Commission and City Council on the
overall ranking of the individual sites.
Commissioner Bildsoe asked if money had been set aside for the acquisition of these
properties. Director Blank commented that the 1994 CIP has allocated $250,000 for
this purpose.
Commissioner Mikula urged both PRAC and the Open Space Committee to give strong
consideration to the larger parcels when considering which sites to preserve.
b. Accessible playground update. Director Blank discussed the awarding of the
construction contract and indicated that actual construction is about 12 weeks away.
Commissioner Wahl commented on the severity of the parking problem at Plymouth
Creek Park and how it will get worse after the accessible playground is installed,
because many of the parking stalls will be assigned to the handicapped. Director Blank
said the parking problem will be alleviated somewhat by different scheduling of one of
the soccer fields.
c. 1994 trail construction proiects. Feasibility reports are being done by Strgar-Roscoe-
Fausch. Commissioner Johnson asked if our trails are smooth enough to accommodate
in-line skaters since this is such a popular activity. Director Blank responded that the
City has a budget for overlaying trails with one-half inch of asphalt to make them
smoother. This is done on a trail by trail basis only as trails need to be resurfaced.
Director Blank commented that due to the increasing popularity of this activity, PRAC
should discuss at a future meeting the possibility of paving a hockey rink for the purpose
of in-line skating and roller -hockey.
d. Seven Ponds neighborhood park update. Discussed earlier under Item 4b.
6. NEW BUSINESS
There was no new business to discuss.
7. COMMISSION PRESENTATION
Commissioner Wahl made a motion thanking Commissioner Mikula for her commitment
and dedication to PRAC. This was her last meeting. She is moving to California in
August.
Commissioner Willegalle asked how the concerts were going at Parkers Lake. He
wondered if there had been any complaints of noise. Director Blank said the concerts are
well attended, and he has not had any negative comments.
8. STAFF COMMUNICATION
Director Blank introduced David Priebe, who is replacing Lynn Mikula on the Park
Commission. Mr. Priebe will begin officially in September.
Director Blank announced that he would like to cancel the August meeting if possible,
because he will be on vacation the week of the regular meeting.
Possible items for discussion on future agendas include:
Reviewing the trail system plan for possible changes, etc. If changes are
recommended, a public hearing would have to be held by the Planning
Commission.
Studying the items ranked high in the survey done last year by the Minnesota
Center for Survey research.
The 1995-99 CIP.
The possibility of acquiring park land for the Amberwoods area neighborhood park.
After deciding to keep their privately owned park, some of the residents now want
the City to provide them with a new neighborhood park. Related to this, the
Greenwood PTO has indicated their interest in the City upgrading the playground
structure at Greenwood Elementary.
The Wayzata School Board has now purchased 130 acres for their new high school
site. Thirty acres are remaining for the City to acquire for purposes of the 9th
playfield. Director Blank stated that the School District will not proceed with the
actual design of the school until after the November election. They will be asking
for excess tax levy in November and if the voters don't approve, the school will not
be constructed. If the tax levy is approved, and the school construction begins, it
will take approximately two years to complete. The school is scheduled to open in
the fall of '97. The associated 30 acres that the City intends to purchase would be
used for an adult sports complex. Upon completion of that playfield, all the adult
games that have been scheduled at Zachary Playfield would be moved to this new
facility, and the Zachary complex would be turned over to youth athletics.
9. ADJOURNMENT
The meeting adjourned at 8:05 p.m.
F SrRGARROSCOE-FAUSCH, INC.
CONSULTING ENGINEERS & PLANNERS
TRANSPORTATION CIVIL STRUCTURAL ENVIRONMENTAL PARKING
August 17, 1994
Mr. Fred G. Moore, P.E.
Director of Public Works
CITY OF PLYMOUTH I'
3400 Plymouth Boulevard
Plymouth, Minnesota 55447-1482
RE: PRELIMINARY ENGINEERING REPORT
1994 TRAIL IMPROVEMENTS
CITY PROJECT NO. 417
Dear Mr. Moore:
r
RECEEIIVEO
AU6 2 1 1994
SRF No. 0942080
As requested, we have prepared the following Preliminary Engineering Report which
addresses five segments of trail to be considered for construction in 1994. The report
discusses each trail segment separately and presents any appropriate options for
construction and estimated costs for each.
PROJECT DESCRIPTION (Figure 1)
The 1994 Trail Improvement Project consists of the following proposed segments of trail
throughout the City of Plymouth. The estimated cost is shown for each segment.
Segment Description EstimatedCost
1 - Parkers Lake North (Vicksburg Lane to Niagara Lane) $ 51,300
2 - South of 27th Avenue --along north side of $ 21,600
City public works property
3 - Northwest Boulevard --west side from 42nd Place $ 34,000
to 44th Avenue
4 - Northwest Boulevard --west side from 54th Avenue $, 72,800
to 56th Avenue
5 - County Road 47 --both sides from Annapolis Lane $172,600
to Northwest Boulevard
TOTAL ESTIMATED COST $352,300
Suite 150, One Carlson Parkway North, Minneapolis, Minnesota 55447-4443
612) 475-0010 FAX (612) 475-2429
SRFSTRGAR-ROSCOE-FAUSCRINC.
covsm me LNG[ NURs & PU4NM
aM"f , Q' • Se • G --W • F -i -z
Suite 150, One Carlson Parkway North
Minneapolis, NN 55447
612) 475-0010
CITY OF PLYMOUTH
1994 PLYMOUTH TRAIL STUDY
CITY PROJ. NO. 417
FIGURE 1
PROJECT LOCATION
SRF NO. 0942080
EXP413.XLS
Expenses for 7 PondslHeather Run Park Project
413 918194
Item Item # Quantity Unit Price With Tax Total Cost
Super Scoop Wheel Chair Accessible 100030 1 5435.00 463.28 463.28
Super Scoop 100029 1 5430.00 457.95 457.95
Motor Cycle Spring Rider 100013 15516.00 549.54 549.54
Car Spring Rider 100017 1 5546.00 581.49 5581.49
Basketball assem. chain notitwin rim fan board 100073 2 898.00 956.37 1,912.74
Shipping Charges for the above items 1 75.00 75.00
Subtotal 54,040.00
Quality Bike Rack 10' single brown permanent 6900P 1 314.00 334.41 334.41
Shipping 63.00 83.00
Subtotal 417.41
Backstop 20'X12' 1 875.00
Wetland delineation - Svohode & Assoc., Inc. 903.54
Wood Fiber & Installation 14,411.75
Trail Excavation 2,800.00
Trail Surfacing 14,900.00
Benches 770.00
Hydroseeding 1,278.00
Grass Seed 395.00
Estimated Expenses
36,333.29
Concrete Curb 5,000.00
Hard Court 3,000.00
Pour in Place Rubber Surface 1,804.00
Split Rail Fence 300.00
Play Equipment Structures & Swings 45,000.00
Picnic Shelter Iron Mountain Forge 868 -SI 1 2,000.00
Sand Play Surface 12" depth 430.00
Tap Soil 1,000.00
Special Plantings 2,500.00
Sod 2,600.00
Total Estimated Casts 63,634.00
Total Actual and Estimated Project Expenses to
Date
104,424.70
Page 1
CITY OF PLYMOUTH
0 13,313- 15,428
REVENUE - ESTIMATED AND ACTUAL
0 96,618 0
AS OF 09/02/94
TOTAL NEIGHBORHOOD 0 109,931 0
ESTIMATED RECEIPTS RECEIPTS UNCOLLECTED RECEIPTS
ACCOUNT DESCRIPTION REVENUE YTD MTD REVENUE LTD
PARK DEDICATION FUNDS
FUND 218
CITY AND COMMUNITY PARKS
461.00 INTEREST ON INVESTM 0 50,346 0 50,346- 64,253
502.00 CONTRIB FROM PRIVAT 0 225,442 0 225,442- 207,921
503.00 FROM OTHER PRIVATE 0 6,300 0 6,300- 0
553.00 MISC REVENUE 0 124 0 124- 0
TOTAL CITY AND COMMUNITY 0 282,212 0 282,212- 272,174
FUND 219
N
461.00 INTEREST ON INVESTM 0 13,313 0 13,313- 15,428
502.00 CONTRIB FROM PRIVAT 0 96,618 0 96,618- 89,109
TOTAL NEIGHBORHOOD 0 109,931 0 109,931- 104,537
TOTAL PARK DEDICATION 0 392,143 0 392,143- 376,711
Park Dedication Fee Study
Proposal: Set fee structure to insure sufficient funding for park improvements and land acquisition to the year 2005.
Option 1 projects current park dedication fee of $945 to increase to $995 in 1995 and increase thereafter by the rate of property
value growth rate. ,
Option 2 increases the current rate to $1250 (the current maximum) over 3 years, (plus property value growth) and thereafter
increases are at the rate of property value growth.
Option 3 generates the most income by increasing the current rate to the maximum rate of $1250 (plus increases in property value
during that time) over one year, thereafter increases are at the rate of property value growth.
Assumptions: Total park dedication and acquisition expense in today's dollars are estimated at $11.3 million ($15.5 million
total less $4.2 TIF and funds).
Park expenses are expected to occur on a even basis over 10 years. Expenses are inflated at the rate of inflation (2.5%),
compounded yearly.
Based on historical trends for the past 10 years, property values are expected to increase at 4.5% per year
Three scenarios for growth are examined: low growth (550 housing starts per year), medium growth (650 starts) and high
growth). Rates of growth have little impact on total revenue, compounded, by the year 2005, but would effect available
funding needs before 2005.
Total available acres remaining for development are 800 residential within MUSA line, 650 commercial, and 2000 acres
outside the MUSA line.
Recommendation: Increase the park dedication fee to the maxim over a three year period. This will mitigate the increase
over a•period of time and will insure maximum coverage of proposed expenditures.
Park Dedication Surplus (Deficit)
Revenues less Expense year 2005
Option 1 Option 2 Option 3
Option 1 projects current park dedication fee of $945 to increase to $995 in 1995 and increase
thereafter by the rate of inflation.
Option 2 increases the current rate to $1250 (the current maximum) over 3 years, (plus inflation) and thereafter
increases are at the rate of inflation
Option 3 generates the most income by increasing the current rate to the maximum rate of $1250 by the year 1995, (plus inflation),
thereafter, increases are at the rate of inflation. Tmt l F[sYrY1E g t etfis;4 ;,:i
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005
Option 1 $ 1,764,458 $ 2,731,886 $ 3,759,928 $ 4,851,609 $ 6,010,097 $ 7,238,706 $ 8,540,902 $ 9,586,121 $ 10,130,184 $ 10,695,459 $ 10,962,846
Option 2 $ 1,834,420 $ 2,946,672 $ 4,199,558 $ 5,531,581 $ 6,946,741 $ 8,449,223 $ 10,043,410 $ 11,294,502 $ 11,881,275 $ 12,490,328 $ 12,802,586
Option 3 $ 1,975,025 $ 3,167,761 $ 4,436,644 $ 5,785,536 $ 7,218,478 $ 8,739,702 $10,353,637 $ 11,620,514 $12,215,437 $12,832,843 $ 13,153,664
Park Dedication Fees
Cumulative Revenues
14,000,000
12,G00,000
10 000 000
y r
s7ugsr
e
8,000.000
FOption 1
Option 2
6000000 DOption 3
4,000,000
2 oo9 ooa
F' Option 3
1995 OPtion 2
1996
1997 i1998
1999
2000 OPtion 1
2001
2002
2003 —
2004
2005
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005
Option 1 $ 1,764,458 $ 2,731,886 $ 3,759,928 $ 4,851,609 $ 6,010,097 $ 7,238,706 $ 8,540,902 $ 9,586,121 $ 10,130,184 $ 10,695,459 $ 10,962,846
Option 2 $ 1,834,420 $ 2,946,672 $ 4,199,558 $ 5,531,581 $ 6,946,741 $ 8,449,223 $ 10,043,410 $ 11,294,502 $ 11,881,275 $ 12,490,328 $ 12,802,586
Option 3 $ 1,975,025 $ 3,167,761 $ 4,436,644 $ 5,785,536 $ 7,218,478 $ 8,739,702 $10,353,637 $ 11,620,514 $12,215,437 $12,832,843 $ 13,153,664
Cummulative
Option 1 projects current park dedication fee of $945 to increase to $995 in 1995 and increase
thereafter by the rate of inflation.
8/26/94 PARKREV2.XLS Option -1
City Plymouth
Park Dedication Projections
Property inflation 4.5%
OPTION 1: Assumptions Inflation rate 2.5%
Units per acre 2
Potential Units 5600
Commercial Acres 650 times $ 3,750.00
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 Total Surplus
Deficit)
Per Unit: $ 940 982 1,027 1,073 1,121 1,171 $ 1,224 1,279 1,337 1,397 1,460 1,525
Scenario 1: Low end, higher interest rates slow housing starts 550 Housing Start Per Year
550 550 550 550 550 550 550 550 550 550 100
Cummulative Units 1,100 1,650 2,200 2,750 3,300 3,850 4,400 4,950 5,500 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential $ 517,000 540,265 564,577 589,983 616,532 644,276 $ 673,268 703,566 735,226 768,311 145,979
Cummulative Revenues 1,569,878 2,429,791 3,343,011 4,312,173 5,340,034 $ 6,429,478 7,583,523 8,805,323 10,098,178 10,808,632 11,078,848 2,321,927)
Scenario 2: Likely trend, based on previous 5 year history 650 Housing Start Per Year
650 650 650 650 650 650 650 650 400
Cummulative Units 1,300 1,950 2,600 3,250 3,900 4,550 5,200 5,600 5,600 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential $ 611,000 638,495 667,227 697,253 728,629 761,417 $ 795,681 831,487 534,710
Cummulative Revenues 1,764,458 2,731,886 3,759,928 4,861,609 6,010,097 $ 7,238,706 8,540,902 9,586,121 10,130,184 10,695,459 10,962,846 2,437,929)
Scenario 3: High end, faster growth then historical 750 Housing Start Per Year
750 750 750 750 750 750 750 350
Cummulative 1,500 2,250 3,000 3,750 4,500 5,250 5,600 5,600 5,600 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,0211
Residential $ 705,000
Cummulative Revenues
736,725
1,959,038
769,878
3,033,981
804,522
4,176,845
840,726
5,391,046
878,558 $
6,680,161 $
918,093
8,047,934
447,724
8,986,598 9,508,248 10,050,365 10,613,645 10,878,986 2,521,789)
Expenses $11,385,000
Prorated over 10 y 1,138,500 2,305,463 3,501,599 4,727,639 5,984,330 7,272,438 8,592,749 9,946,068 11,333,220 12,755,050 13,073,926 13,400,775
Cummulative
Option 1 projects current park dedication fee of $945 to increase to $995 in 1995 and increase
thereafter by the rate of inflation.
8/26/94 PARKREV2.XLS Option -1
Cummulative
Option 2 increases the current rate to $1250 (the current maximum) over 3 years, (plus inflation) and thereafter
increases are at the rate of inflation
8/26/94 PARKREV2.XLS Option -2
City of Plymouth
Park Dedication Projection
Property inflation 4.5%
OPTION 2: Assumptions Inflation rate 2.5%
Units per acre 2
Potential Units 5600
Commercial Acre 650 times 3,750.00
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 Total Surplus
Deficit)
Per Unit: $ 940 1,090 1,247 1,410 1,474 1,540 1,609 1,682 1,758 1,837 1,919 $ 2,006
Scenario 1: Low end, higher interest rates slow housing starts 550 Housing Start Per Year
550 550 550 550 550 550 550 550 550 550 100
Cummulative Units 1,100 1,650 2,200 2,750 3,300 3,850 4,400 4,950 5,500 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential 517,000 599,464 685,639 775,692 810,599 847,076 885,194 925,028 966,654 1,010,153 191,929
CummulativeRevenues 1,629,077 2,611,533 3,715,006 4,887,534 6,132,578 7,453,762 8,854,876 10,339,887 11,912,948 12,714,722 13,032,590 368,185)
Scenario 2: Likely trend, based on previous 5 year history 650 Housing Start Per Year
650 650 650 650 650 650 650 650 400
Cummulative Units 1,300 1,950 2,600 3,250 3,900 4,550 5,200 5,600 5,600 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential 611,000 708,458 810,301 916,727 957,980 1,001,089 1,046,138 1,093,214 703,021
Cummulative Revenues 1,834,420 2,946,672 4,199,558 5,531,581 6,946,741 8,449,223 10,043,410 11,294,502 11,681,275 12,490,328 12,802,586 598,189)
Scenario 3: High and, faster growth then historical 750 Housing Start Per Year
750 750 750 750 750 750 750 350
Cummulative 1,500 2,250 3,000 3,750 4,500 5,250 5,600 5,600 5,600 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential 705,000 817,451 934,963 1,057,762 1,105,362 1,155,103 1,207,083 588,654
Cummulative Revenues 2,039,764 3,281,810 4,684,110 6,175,629 7,760,904 9,444,684 10,559,197 11,120,163 11,702,577 12,307,162 12,614,841 785,933)
Expenses 11,385,000
Prorated over 10 yr 1,138,500 2,305,463 3,501,599 4,727,639 5,984,330 7,272,438 8,592,749 9,946,068 11,333,220 12,755,050 13,073,926 13,400,775
Cummulative
Option 2 increases the current rate to $1250 (the current maximum) over 3 years, (plus inflation) and thereafter
increases are at the rate of inflation
8/26/94 PARKREV2.XLS Option -2
I
City of Plymouth
Park Dedication Projections
Scenario 1: Low end, higher interest rates slow housing starts
Property inflation 4.5%
OPTION 3: Assumptions Inflation rete 2.6%
Units per acre 2
550 550
Potential Units 5600
550 550
Commercial Acres 650 times $ 3,750.00
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 Total Surplus
1,100 1,650
Deficit)
Per Unit: $ 940 $ 1,306 $ 1,365 1,426 3 1,491 $ 1,558 S 1,628 $ 1,701 $ 1,778 $ 1,858 $ 1,941 $ 2,029
Scenario 1: Low end, higher interest rates slow housing starts 550 Housing Start Per Year
550 550 550 550 550 550 550 550, 550 550 100
CummulativeUnits 1,100 1,650 2,200 2,750 3,300 3,850 4,400 - 4,950 5,500 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential 517,000 718,438 750,767 784,552 819,857 856,750 895,304 935,593 977,694 1,021,690 194,121
CummulativeRevenues 1,748,050 2,798,608 3,915,617 5,102,419 6,362,510 7,699,552 9,117,375 10,619,990 12,211,590 13,023,022 13,348,597 $ 52,177)
Scenario 2: Likely trend, based on previous 5 year history 650 Housing Start Per Year
650 650 650 650 650 650 650 650 400
Cummulative Units 1,300 1,950 2,600 3,250 3,900 4,550 5,200 5,600 5,600 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential 611,000 849,063 887,270 927,197 968,921 1,012,523 1,058,086 1,105,700 711,050
Cummulative Revenues 1,975,025 3,167,761 4,436,644 5,785,536 7,218,478 8,739,702 10,353,637 11,620,514 12,215,437 12,832,843 13,153,664 $ 247,110)
Scenario 3: High end, faster growth then historical 750 Housing Start Per Year
750 750 750 750 750 750 750 350
Cummulative 1,500 2,250 3,000 3,750 4,500 5,250 5,600 5,600 5,600 5,600 5,600
Add: Commerical 243,750 249,844 256,090 262,492 269,054 275,781 282,675 289,742 296,986 304,410 312,021
Residential 705,000 979,688 1,023,773 1,059,843 1,117,985 1,158,296 1,220,669 595,377
Cummulative Revenues 2,202,000 3,536,913 4,957,671 6,468,654 8,074,446 91779,852 10,909,467 11,479,190 12,070,580 12,584,365 13,001,474 $ 399,301)
Expenses 11,385,000
Prorated over 10 K 1,138,500 2,305,463 3,501,599 4,727,639 5,984,330 7,272,438 8,592,749 91946,068 :, 11,333,220 12,755,050 13,073,926 13,400,775
Cummulative
Option 3 generates the most income by increasing the current rate to the maximum rate of $1250 over one
year, thereafter increases are at the rate of inflation.
8/26/94 PARKREV2.XLS Option_3
City of Plymouth
1994 -1998 Capital Improvements Program
Park Projects
Project Park Year Park Dedication Park Dedication
Neighborhood RISA State/Count Tax Increment Community Impn' Other Funding Total Other Funding Sources Noes
Number Project Playliields
Trails Parks Funding Federal Financing Fund (CIF) ` Sources
from ClF250,000 250,000 Grant
1 Acquisition of open SPace 1994 50,000 135,000 I-II2A/CD$G Funds
2 Constma Accessible Playground 1994 20,000 65,000
1,276,000
3 Land Acquisidon--Ninth Playfield 1994 1,716,000 200,000
4 Replace i playgrounds in Nborhood Parks 1994 1 200,000
10,000
5 Gleason Lake Elcm--School Playground 1991 1200,00010,000
6Tails 1994 100,000 100,000
120,000
7 Smen Ponds Neighborhood Park Dovd. 1994 120,000 60,000
8 Cardinal Ridge Nborhood Park --Lund Acq 1994 60,0 00
36,000
9 Contract Payment--KSE Park 1994 36,000
435,000 435,000
10 Wert Medicine Lake Park Land 199.1
455,000 100,000 435,000 250,000 50,000 2,662,000
Subtotal 1,372,000
1,565,000 7,565,000
10 West Medicine Lake Park Road 1995 200.000
6 Trails
1995100,000 100,000
250,000
3 Ninth Playfield Development 1995 250,000 38,000
9 Final Contract Paymrnt-KSE Park 1995 38,000 7$5,000
8 Cardinal Ridge Nborhood Park Develop- 1995 185,000
140,000
12 Tenth Playfield Acquis mn 1995 140,000
490,000 223,000 100,000 0 1,565,000 0 0 2,378,000
Subtotal
6 Trails 1996 200,000 100,000
99,000
300,000
99,000 Park Replacement Fund
11 Park Replacement Rork 1996 100,000
4 Playground Equipment Replacement (3) 1996 100,000 0001 1
3 Ninth Playfield Development 1996 500,000
50,000
550,000
10 West M1tedicine Lake Park Development 1996 500,000 140,000
12 Tenth Playfield Acquisition 1996 140,000
1,340,000 100,000 100,000 50,000 0 0 99,000 1,689,000
Subtotal
5 hails 1997 200,000 100,000
300,000
175,000
7 Neighborhood Park Development 1997 175,000
207,000 207,000 Pazk Replacement Fund
Il Park Replacement Work 1997 140,000
12 Tenth Playfield Acquisition 1997 140,000
340,000 175,000 100,000 0 0 0 207,000 822,000
Subtotal
6 Trails 1998 200, 000 100,000
383,000
300,000
383,000 Park Replacement Fund
71 Park Replacement Work 1998
0 100,000
363,000 683,000
Subtotal
200,000
3,742,000 953,000 500,000 50,000 2,000,000 250,000 739,000 8,234,000
Total
Within the next five years, do you feel the City of Plymouth should build and operate the
following new facilities for Plymouth residents?
FACILITIES YES,
EVENIF
IT RAISES
TAXES
YES, ONLY
IF IT
DOESN'T
RAISE
TAXES
TOTAL OF
YES
RESPNS.
NO,
FACILITIES
SHOULD NOT
BE BUILT
Walking/biking trails 25% 1 39% 64% 19% 45
Nature preserve 24% 33% 57% 20% 37
Outdoor pool 19% 28% 47% 32% 15
Indoor pool 19% 25% 44% 37% 7
Teen center 19% 32% 51% 24% 27
Public golfcourse 15% 29% 44% 39% 5
Children's playground 15% 34% 49% 26% 23
Senior center 13% 34% 47% 24% 23
Indoor ice arena 12% 24% 36% 42% 6
Healthifitness facility 11% 30% 41% 36% 5
Open play areas for
non-scheduled activities 9% 37% 46% 27% 19
Outdoor tennis courts 9% 33% 42% 31% 11
Public gvrn space 8% 24% 1 32% 42% 10
Public swim. beaches 8% 33% 41% 33% 8
Indoor tennis courts 7% 19% 26% 51% 25
Baseball/softball 6% 32% 38% 32% 6
Indoor racquet/sport
courts 5% 20% 25% 49% 24
Outdoor soccer fields 5% 34% 39% 32% 7
Meeting rooms 5% 21% 26% 45% 19
Other 4% 14% 18% 26% 8
Indoor soccer area 3% 14% 17% 58% 41
Skateboard facility 3% 23% 26% 48% 22
July 18,1994
Mr.Joe Matson
WAYZATA Public Schools
17305 19th Ave. No.
Plymouth, Minnesota
55447
Dear Mr. Matson,
We have a home located on Urbandale Lane behind Greenwood school in Bridlewood Fames. We are on
a cul-de-sac that is a dead end. Recently,we have had numerous people during the past several months
using ouryard as the means to get from other neighborhoods to and from the school. We have been
upset and angry because these people with dogs, children on bikes,buggies and wagons have been using
our yard as a walkway. Every weekend it seems we are assisting these people find their destination by
usingour yard as the path backhome or to the school grounds. Last weekend we helped a poor
distraught grandfather find his way back home while he was taking his granddaughter for a walk in
a buggy while visiting his relatives. We've even had people pass through the yard at late night hours.
In the spring we have many children walling through our yard as they go on their way to and from
school
The problem is that there is no complete path for these people to walk on. We have a paved asphalt
path that leads to the school property from our development but it is not finished as yet. The school
portion needs to be completed onthe schoolproperty. We understand the remaining path is to be paved
by the school district. We think paving a path would be very helpful for our situation but, more
important it would provide a safe means of walking space to and from school for our children. The
children walk in the field which has rocks, branches and debris on the ground and it is also wet and
muddy at times, an unsafe environment. Many residents in our development have stressed a concern that
they would like for their children to walk to school but not until there is a safe way to go. The school
district could save transportation dollars by making this a walking area but, only if there is a
completed path for the students to follow.
We hope that this path can be a reality and that it be completed soon. The residents of Bridlewood
Farms and Saddlebrookare in need of this path. We would appreciate this path being completed soon
for our privacy but more concerning for the safety of our children and our neighbor's children. We would
appreciate your response on this issue. Thank you.
n
Panda i L iMkegatndethLichtenberg3670LaneNorth
Plymouth, Minn. 55446
cc Mr.EricBlank - CityofPlymouth )
Peter & Cathy Davis
17240 33rd Avenue North
Plymouth, NIN 55447
Mr. Dan Faulkner
City Engineer
Plymouth City Center
3400 Plymouth Blvd.
Plymouth, MN 55447
June 14, 1994
Dear Mr. Faulkner,
I would like to request that the City of Plymouth install a sidewalk along Medina Road
Residents on Holly Lane are stranded on their no -outlet street. Children must walk or ride,
their bikes on Medina Road in order to access play equipment at the local elementary
school or eventually the new neighborhood park. For any exercise, area residents must
walk, ride or skate along Medina road.
The speed limit along Medina Road is 40 mph, however, cars frequently speed along this
route (including school busses and construction trucks). Because of the curves and
landscaping along Medina Road, in addition to the early morning and late afternoon sun
which blinds drivers, cars cannot see pedestrians. There have been many instances when I
have been forced off the curb onto the muddy berm because of reckless drivers. Other
drivers merely do not wish to exercise caution by switching lanes and instead remain in the
lane closest to the curb as they pass me. This hazard is magnified during the winter when
the snow and ice make the road narrow and slippery.
While the neighborhood streets do not have sidewalks, drivers know to proceed with
caution because their own children may be playing in the street. Drivers on Medina,
however, are not accustomed to driving cautiously, while those same children are on the
road.
A sidewalk along Medina Road, from County Road 24 to the Plymouth/Medina city limit
would provide safe access to the park and elementary school for residents of Seven Ponds,
Heather Run, Bridlewood and Saddlebrook.
Sincerely,
Cathy Dal is
August 12, 1994
Ms. Cathy Davis
17240 33rd Ave. N.
Plymouth, MN 55447
SUBJECT: REQUEST FOR SIDEWALK ALONG MEDINA ROAD
Dear Ms. Davis:
I am responding to your June 14, 1994 letter to me requesting the City of Plymouth to install a
sidewalk along Medina Road from, County Road 24 to the Medina City limits. I apologize for
this lengthy delay in my response. For your information, the City has a Comprehensive Trail
and Sidewalk System Plan which is handled by the City's Park and Recreation Department.
The plan does not provide for any type of trail system along Medina Road from County Road
24 to the Medina City limits. A bituminous trail is indicated on the plan along County Road
24, a portion of which will be constructed with the current County Road 24 Improvement
Project. The plan also calls for a bituminous trail along County Highway 101, a portion of
which has recently been constructed along the east side adjacent to the Heather Run
Development north of County Road 24 to near Medina Road.
While there is not a city or private trail system for residents such as yourself along Holly
Lane, there is now at least a local road nearby, i.e., Jewel Lane and 32nd Avenue which will
get you to the County Highway 101 trail. If you still have concerns and you wish to pursue
your request further, I suggest you contact Eric Blank, Parks and Recreation Director as your
request would entail a Comprehensive Plan change to the adopted Trail Plan.
If you have further questions, please contact me at 550-5071.
Sincerely,
Uezl t (yl 4Zu 0
Daniel L. Faulkner, P.E.
City Engineer
cc: Fred G. Moore, Director of Public Works
Eric Blank, Parks and Recreation
We Listen • We Solve • We Care
3400 PLYMOUTH BOULEVARD • PLYMOUTH, MINNESOTA 55447 • TELEPHONE (612) 550-5000
August 4, 1994
Eric Blank
Director of Park & Recreation
City of Plymouth
3400 Plymouth Boulevard
Plymouth, MN 55447
Dear Mr. Blank,
The residents of Holly Creek I development would like to request that a trail/path be
added to the South side of Old Rockford Road from Fountain Lane to Dunkirk Lane.
This trail/path would provide the following:
1) It would provide a safe place for the school children to stand while waiting
for the school bus. The Director of Transportation for the Wayzata Schools
will not allow the school bus to enter the cul-de-sac on Fountain Lane.
Therefore, the children stand on the corner of Old Rockford Road and
Fountain Lane in the street. The current 50 mph speed on Old Rockford
Road makes the children's safety a very important issue.
2) This trail/path would also provide a safe access to pedestrians attempting
to get other neighborhood developments and city trails.
The enclosed page is a list of the residents in Holly Creek I development. All residents
of the development have expressed their concern by signing the attached petition.
Your prompt response to this issue would be greatly appreciated as the 1994/1995 school
year is about to begin.
Resident Signature
Andy & Dana Cossette
4330 Fountain Lane N. ) /
Open Lot
4320 Fountain Lane N.
Jim & Judie Hohn
4310 Fountain Lane N. I `
Bill & Ann
f '
4300 Fountain Lane N.
Paul & Jennifer Blackley
4280 Fountfain>Lane N.
l l
i
Tim & Tammy Laudner (
4270 Fountain Lane N.
Michael & Kathy Gulli
4265 Fountain Lane N.
Bernie ke,4,e
4275 Fountain Lane N.
Gary & Sheila Langer
4285 Fountain Lane N.
John &Rose Miller' ( . I,
7%
4305 Fountain Lane N. G
Jeff & Mary Orton \ i n
tJ
4315 Fountain Lane N. : i' 1 (' U
Dick & MaryKay Ward
4325 Fountain Lane N.
Jeff & Jill Siewert
4335 Fountain Lane N.
a)wt
CCC"'t -
Steve & Sarah Berg n n ,,
4345 Fountain Lane N.C
Jf'
August 20, 1994
Mr. Eric Blank
Director of Parks and Recreation
City of Plymouth
Dear Eric:
I am again excited about the trail between the
Plymouth Creek School area and the Fernbrook park.
The new resurfacing is wonderful and the entire area
is such a great place for all of us in this heavily
trafficed area to walk, bike, rollerblade etc.
This morning my husband and I walked the 3.4 miles
from our door through this trail and back. Although
it was only 8 a.m. we encountered seven of our
neighbors on this trail. Beyond that there were many
other people enjoying the early morning stroll or
power walking through the tunnels to the park.
I don't know whether you are aware or not, but on the
Saturday morning in June when we had our annual
Plymouth Creek cleanup day a group of our volunteer
workers swept and hosed out the tunnel under County
road #9. Consequently, this section of the path has
been very clean and accessible all summer. We really
do enjoy this trail and on behalf of the residents of
Plymouth Creek townhomes I wish to say again, "Thank
you".
Sincerely,
7)
Mary Merry
28 August 1994
Eric Blank
Plymouth Park & Recreation
3400 Plymouth Blvd.
Plymouth, MN 55447
Dear Eric:
Thank you for keeping me informed about the potential sand volleyball courts to be added to
the Parker's Lake Park area for outdoor useage in 1995. After examining the lakefront grounds, 1
intend to make recommendations for two possible sites of their placement. Please refer to the
rough sketch for reference, with location preferences marked as Site A and B, respectively.
In each case, I recommend that the following be considered in the construction of courts:
dual -court system
level fields of play
quality, abundant volleyball sand that should be
replenished periodically
sturdy posts with durable nets
referee stations
Aestically, Site A is my preferred choice. It is close to existing playground and picnic areas,
has a good view of the lake, and requires minimal leveling of the existing terrain. It does,
however, have a limited expanse of area. Adequate margins from obstructions should be
allocated as safety zones for players. I envision site A as creating a lot of viewing and playing
interest. Its proximity to the already mentioned park activities would be convenient for families
and groups.
Site B is an acceptable spot for a dual -court system. It consists of a large expansive area
which is readily visible from the main roads and would make good use of the current
underutilized ground. Upon inspection, the ground would require considerable leveling, however,
and is also remote from the other park activities. Building the courts on Site B may not draw
much park interest from potential on -lookers. Site B would be a very attractive site if the city
decided to construct a sand volleyball "complex" of multiple courts and other ammenities to spur
involvement in an increasingly popular sport. Perhaps a complex is nct in the city plans now but
proper placement of courts at site B should allow for such future expansion.
As I live in the Parker's Lake area and have an interest in playing sand volleyball, I would like
to see these courts become a reality. My recommendations on court construction is based on
playing experience at the East Medicine Lake beach courts. City leagues and other opportunities
for organized open play at Parker's Lake would be greatly appreciated.
Sincerely,
Thomas A. Mollen
931-5626/473-0066
P62oeO5-C) WK -644 t,. ire
C-ouNTL(
V ouI,.cLf Mi -t, COL)(Lr S tTcS
P—O Ali 1
iFk. rM49t(t L4
AvtpjS,- ti Lt
Qq'aGL6ZriJ(r l,o"S
6Y
j tI
W t79
P x 6:a -s LAK -6
I I I D resentPlan to City Council &
I
School Board
1 I ! I I 1 1 1
1 18 Prlaaent IOltiallaartOa'-AnChman Find,nga l I I l Ill l 1 1 1 I I I I
I I Gini i;; s i/;,,: •..,.iiii,o; CamPrenangile Plan I I I I I I
f 1 I I I'JI I I I I I I I 1 I I11! 1 1 1 1/%/
Planning ,am: aa]Pn Pablic Haaring Ra.Cnmo Planl I I I
IIII IIII
I IGIII III IIII
G cy aunt.] Aparoval o
pompranensaveI
Plan I ! I 1 !
I ' I I
1 1 1 1 I I I I 11 1 1 1 I l
GPmPlenl ' nsiaaRlanAe:•iew - NetraPalitan Gounci] I I I
Fraoa r environmental Assessment
WorkI
site== -t IIE95V] I I I 1
E_P
Gdmmantl
PermoIII
11;11111':' " " '
II III III IIII IIII111IDecisionon :vesd ..=ar ESS.
II I I : I I I I 1;/ ,•: I I I I I I I I I I I I
Wetlands Permit from Corps of Enginaers%,/%
I11 1 1 I 1 I 1 1 I I I I I I I 1 I I 1 I I f i I I I I
lnnireei Saarte Permit no ... aad dy PGA
Elm Creek ShO,aline Permit from CNA
M' maetinea (ml 1—h Ad: (
I! I. I I I I I I I I I I I I I I I
R ld]ng Permixr//i'/ j! I I I I I I I
I I I I I I I Star
I
Site Grading far Hign Scnooli] ! I I
I I
I
III
Ea tanl]SM1 TamoPrary GonatructiPn 4.m' c .'.a..' RPatl
11 1 I 1 V I I I 1 I I I I I I I 1 I I I11r,/; is//, / // / /i / TrarfiC Study dY SRF IIIIIIII I I
Slid, aa"a
I I I I! I I"I I I I 1 I I -I I I I I I I I I I I III 1 1 1 1 •i. I" I.
Cone's act Peonv La aPidae Over Railroad TraCks
i III
IIII III III Ilii III III III IIII III IIII
I !II IIII 111 III 1111 III III III IIII III IIII
I III 1111 111 III IIII III III III IIII III IIII
1111 1111 III III IIII III III III IIII III IIII
1111 IIII III 111 III! III III III IIII III !III
1111 IIII iii III 1111`!11 III III IIII III IIII
I III IIII III III IIII III III III IIII III IIII
III
IIII III III IIII III III III IIII III Ilii
I I I:'II III !(! IIII III III III IIII III 1111
J I:JESC
III Hill 111 111 IIII
III III IIII III 111,1111
III 11!11111 111 1111!111
III III IIII III liljl!li
III 111'!111 III Illillll
111 111 1111 III 111 1111
III III 1111.111 111 1111
111 111 1111 111 III 1111
III III 1111 III 111 Ill
III Ill Hill III 111 lilt
III IIIIIIII 111 Ill Iill I
III 111 1111 111 111 1111
III III Hill ill III 1111
III Ill !III III 111 Illi
111 111 !III 111 111 1111
Ill 111 111! 111 III 1111
111 III 1111 III III !111
III Ill IIII III III 1111
f i t _!_1. 1-..- i.I-L• --I I"I I S L I ".I_I_
Trunk Sewer 43on9 Coin [Y PPan/////j/i%//%;:i%%%%i,%%-/•''
Lateral 3awzr clang Peony Lane .////// // .%/// iii'% i' :% j'e/•j;
III Till III III IIII 111 III IIII II
111 IIII III III IIII III III Ilii II
III III! III III IIII 111 III IIII it
III IIII III III IIII III III lilt II
III IIII III III IIII III III IIII II
III IIIIIII I!I IIII III III 111.1111
RUN DATE aazECBy
MEMO
CITY OF PLYMOUTH
3400 PLYMOUTH BOULEVARD, PLYMOUTH, MINNESOTA 55447
DATE: August 31, 1994
TO: Michael Stulberg, Planning Commission
Donald Anderson, Park and Recreation Advisory Commission
Almon Bock, Financial Advisory Committee
Chuck Ulmer, Board of Zoning Adjustments and Appeals
Mary McKee, Water Quality Committee
Chairperson, Human Rights Commission
FROM: Laurie Ahrens, City Clerk X/
SUBJECT: CITY COUNCIL RESOLUTION 94-507
Attached is a copy of Resolution No. 94-507 which was adopted by the Plymouth City
Council on August 29, 1994. I would appreciate you sharing this resolution with
members of your commission or committee at your next meeting.
The resolution indicates that each committee/commission shall submit an annual work
plan to the City Council for approval. In order to give you time to formulate the initial
plan, the first work plan should be submitted to the City Council by January 1, 1995.
The other items in the resolution are effective immediately.
During discussion of this resolution, every member of the City Council applauded the
efforts and time commitment put forth by Plymouth committee/commission members.
This resolution was proposed as a means to maximize the efforts and talents of
commission/committee members, as well as ensure that the focus and activities of
commissions/committees are consistent with the City Council's goals and objectives.
If you have any questions on this resolution, please feel free to contact City Manager
Dwight Johnson, Assistant Manager Kathy Lueckert, or me at 550-5010. Thank you.
cc: Mayor and City Council
City Manager
Department Directors
City of Plymouth
3400 Plymouth Boulevard "
Plymouth, Minnesota 55447
Res. No. 94-507
WHEREAS, the City Council desires to integrate the work of the City's boards,
committees, and commissions with the goals and objectives of the City Council; and
WHEREAS, the City Council seeks regular communication with its boards,
committees and commissions through approval of annual work plans and review of the
public communication and education efforts of boards, committees, and commissions; and
WHEREAS, the City Council seeks to manage the time commitment of committee
members and staff;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PLYMOUTH, MINNESOTA that the City's boards, committees, and
commissions shall follow these guidelines:
Each board, committee and commission shall submit an annual work plan to the City
Council for approval. The work plan will describe the issues and activities to be
undertaken during the period, and outline how the work plan supports the City Council's
goals and objectives. A quarterly update on the status of the work plan is encouraged.
Each board, committee, and commission will submit in advance to the City Council
information on any public event or activity, and any public communication, such as a press
release or information flyer.
Establish an annual review of the purpose, functions, mission, and need for continuation of
all boards, committees, and commissions not required by law, so that the time commitment
of both committee members and staff may be better managed. This will be accomplisehd
through an annual review at the appointment or reappointment of committee members on
January 31 of each year.
Each board, committee, and commission shall constantly search for possible cost
reductions, efficiency measures, and productivity enhancements and recommend these to
the Council for consideration.
BE IT FURTHER RESOLVED that staff is directed to forward a copy of this
resolution and report to the chair persons of all Plymouth boards, committees, and
commissions.
Adopted by the City Council on August 29, 1994.
1994 GOALS AND OBJECTIVES
1. Recommend Plymouth's Leisure Objectives
To evaluate development trends and population characteristics within the community, and
recommend both short and long-range objectives for leisure time facilities and programs,
including acquisition of land in anticipation of future development. This effort shall
involve collaboration with school districts, service clubs, and other community recreational
components to reduce unnecessary program duplication, provide appropriate facilities and
ensure consistency of City recreation policies and programs. To hold one in-house training
session focusing on future trends, ideas, etc.
2. Review Comprehensive Park, Trail and Facility Needs
To review and update as needed the Comprehensive Park and Trail System Plans, based on
actual land development as approved since the System plan was adopted in February, 1982.
This assessment shall include a review of the City's development patterns, trends and
citizen input including athletic associations, homeowner associations, schools, etc.
3. Plan the Recreation Programs
To carefully plan the City's recreation programs to ensure that they are responsive to the
citizens' needs and desires. Only those programs meeting continued public acceptance
should be offered. Use past program participants to help evaluate and develop new
program ideas.
4. Help Promote Plymouth's Athletic Groups
To develop a program of communication and coordination between the City's park and
recreation department and all athletic groups in an effort to better serve all portions of the
community, and to work toward developing one, unified Plymouth athletic association.
5. Recommend Park Usage Policies
To formulate and recommend to Council policies for appropriate use and maintenance of
park facilities and recreation programs.
6. Get Plymouth's Citizens Involved
To encourage community service organizations and citizens' groups to assist in the
development and/or maintenance of parks and recreation facilities. Maximum use of local
resources and talents will not only improve the total park system and recreation
programming, but will foster increased community pride.
7. Prepare the Parks CII'
To develop annually the park and recreation component to the City's five year capital
improvements program (CIP). The parks component should consider all capital
improvements, as evaluated by PRAC, and the sources of funding. Submission of this
component should be to the Department of Community Development, so that it may be
incorporated into the five-year CIP review of the Planning Commission.
1993 -7-
8. Update to Council
To meet annually with the Plymouth City Council and Planning Commission if warranted.
The meeting will be joint with full membership of all members invited. To deliver to the
Council presentations of current work and problems encountered. To solicit the Council's
reactions and advice.
9. Review Developer Plans
To coordinate throughout the year and meet with the Planning Commission when necessary
to review plans that are consistent to ensure that they comply with Plymouth's overall plans
for both parks and trails.
10. Legislation .
To review and recommend to the City Council suggestions with regard to any federal or
state legislation which may impact the City's ability to develop and maintain park and
recreation facilities and programs.
11. Parks Tour
To conduct a parks tour for PRAC, City Council, Planning Commission, City staff and
other interested citizens prior to the development and approval of the CIP.
12. Communicate with Other Park and Recreation Agencies
The Commission will strive to communicate and exchange information with commissioners
from other adjoining or overlapping park and recreation agencies such as New Hope,
Maple Grove and suburban Hennepin County parks.
13. Study of Open Space
To study Plymouth's open space areas, wetlands and woodlands, and to make
recommendations to the Council on those parcels to acquire in an effort to preserve this
land for future generations to enjoy.
1993 -8-
rp 1994 - 1995 City Council Goals and Objectives Work Plan
Maior Goals
i. Protection of the Environment Votes 3Q 94 4Q 94 1Q 95 2Q 95 3Q 95 4Q 95
1. Implement a Wetlands Protection Ordinance 11 D I A
2. Prepare a City-wide water quality plan 8 5 S5 5 S D/It
3. Consider acquisition of Open Space areas 7 S R A C C C C
4. Consider new tree preservation policies 6 5 A
L. Enhancement of Neighborhoods - of Votes 3Q 94 4Q 94 1Q 95 TQ-9-5T3—Q-9-5 4Q 95
1. Review thoroughfare guide plan to protect 7 S D/A
neighborhoods from excess traffic
8 C C C C C C
2. Implement rental housing inspection program 7 R A
3. Reemphasize neighborhoods in planning and 4 C C C C C C
development review
Ill. -Improve Citizen Participation W Ot Votes 3Q 91+14Q 941 1Q 95 2Q 95 3Q 95. 4Q'95
1. Review Environmental Assessment Worksheet 9 S/D A
procedures
8 C C C C C C
2. Increase notification Stan ands(hold more meetings 5
3. Im rove public financial and budget reports 4 C C C C C C
ll', Management of Development # of Votes I 3Q 9414Q 94 1Q 95 2Q 95 3Q 95 4Q 95
1. Adopt an Economic Development policy 1 8 D A
2. Prepare a Comprehensive Plan for Northwest Plymouth 1 5 5 - S I D I D I D EEi
i:.'.finaneial illanagement .- of Votes-. 3Q'94 4Q 94 1Q:95 2Q95.3Q95 4Q 95
1. No tax rate increase for 1995 10 A _
2. Improve financial forecasting and reporting 8 C C C C C C
3. Adopt a Capital Improvements Program w/timelines 7 LD D A
4. Protect taxpayers from waste fraud/abuse (sumps) 6 C C C C C C
1'l. lnteragenet- Relations # of VotesI 3Q 9414 94 IQ 95 2Q 95 3Q 95: 4Q 95
1. Formalize a Pymouth Legislative Agenda 7 D A D A
2. Lobby for improvements in highway corridors 6 C C C C C C
177. Capital Projects It of Votes I 3Q 94 4Q 94 1Q 95 2Q 95 3Q 95 4Q 95
1. City Center Expansion 1 7 A I C C C I C C
2. Acquisition and Development of Ninth Playfield 1 7 A I A I 5 I A
i'I/I. lmprare Citizen Con>idence in Cily 14 of Votes I 3Q 9414Q 911-1 1Q 95 2Q 9513Q 9514Q 95
1. Encourage innovation and customer service 1 6 C C I C I C C C
2. Maximize efficiency and effectiveness of council meetings 1 6 C C I C C C I C
Key:
A = Adopt and implement ordinance(policy(recommendation
C = Continuing projects or activities
D = Development of ordinance(policy
R = Recommendations to Council
5 = Conduct study; gather information
cIrgoals.xls
1994 - 1995 City Council Goals and Objectives Work Plan
Additional Goals
Protection of the Enriroament - # of Votes 3Q 94 4Q 94 1Q 95 2Q 95. 3Q 9514-Q 95
5. Examine water restriction policies 1 S 5 A
E. Steep Slope erosion controls 1 $ A
i. Maximize recycling efforts 1 1 5 1 R I A
If. Enhancement of Neighborhoods 14 of Votes 3Q 94 4Q94 1Q 95 2Q 95 3Q 95. 4Q 95
4. Reduce neighborhood nuisances 1 3 D A C C C C
5. Reducespeeding on residential streets 1 I III6. Increase involvement of police in nei hborhoods 0 C C C C C C
III. Improve C117,zen Pardelpation # Votes 3Q 94 4Q 94 1Q 95 2Q 95. 3Q 95 4Q 95
4. Review public hearing policies and practices 2 5 R I A
5. Conduct ward an business meetings 2 A D A
6. Promote wide and diverse participation 2 C C C C C C
7. Improve customer service 1 C C C C 5 A
8. Conduct neighborhood meetings for all publicimprovements O A C C C C C
IS' . Almiagement of Do velopiiment - of Votesl 3Q 94 4Q 94 1Q 95 2Q 95 3Q 9514Q 95
3. Review development policies: environment, trans ., housin 3 S S
4. Review MUSA line need 1 S 5 S SIR
5..13e-nredevelo ment studies. 1 1 .S - _S.
1'. Financial Ara agement - - - - of Votes 3Q 94 4Q 94 1Q 95 2Q 95. 3Q 95 4Q 95
5. Outcome based budget 2 5 5 5 S A
6. Review assessment olicies for- ro' 2 SIR
4. Work with school district on projects o
7. Prepare long range plafor major funns s 1 C C C C C C
8. Consider storm water utility fee as funding for water quality 1
O-
5 5 A
9. Adopt long range plan for CIF 0
C
S__/_R_ A
10. Complete utility rate study O S SIR A
11. Protect essential services 0 C C C C C C
III.InterngenevRelationsI of Votes 3Q 94 (IQ 94 1Q 95 2Q 95. 3Q 95 4Q 95
3. Meet with officials of adjacent jurisdictions I C C C C C C
4. Work with school district on projects o C C C C C e
5. Increase leadership in organizations O- C C C C C C
6. Improve communication with comm. groups: youth /seniors O 1 C Ji C C C C C
1.77. Capita! Projeets - of Votes 3Q 94 4Q 94 1Q 95 2Q:95 3Q 95 4Q 95
3. County Road 9 Widening 2 R
4. Schmidt Lake Road 2 5/R
5. Trail Development 2 S A S A
6. New Water Tower 1 S A
7. West Medicine Lake Park 1 S S R A
8. County Road 9/County Road 24 O A A
177I. Improve Citizen Confidence in Citt' of Votes 3Q 94 4Q 94 1Q95 2Q 95 3Q 95 4Q 95
3. Maintain and improve morale 3 C C C C C C
4. Invest in employee training and development 2 S R A
5. Review consultant selection procedures 2 5 R/A
6. Upgrade technological capabilities 2 C C C C C C
7. Formalize strategic planning process 1 5 S S RIA
8. Uphold the Pro -Plymouth Pledge 0 C C C C C C
9. Match staffing and resources to city goals 0 SIR A SIR A
10. Foster open decision making at meetings 1 0:=-7CC C C C C
11. Foster communications throughout the organization 0 C C C C C C
Key
A = Adopt/implement/construct
C - Continuing projects or activities
D - Development of ordinance/policy
R - Recommendations to Council
5 - Conduct study/hold Informational meetings
drgoal2 As
City of Plymouth
Park and Recreation Department
3400 Plymouth Blvd.
Plymouth, Minnesota 55447
Dear Plymouth Park and Recreation Department,
We would like to commend you for the help you gave us with our U6/U8 Jamboree on
Saturday July 23rd.
The event was a total success. Everyone had an extraordinary time. You helped us to
assemble an unforgettable experience for 260 children, 8 years old and under. Not to
mention, their parents and siblings.
The fields were beautifully marked and you made everything we requested available.
When we had a problem with the electricity you were right out there to help, and the day
went on as planned.
We are grateful to Plymouth Park and Recreation for being there for us as usual.
Sincerely,
NBPAA) Wings Soccer Board
Ss/
August 25, 1994
Mr. Rick Busch
Plymouth Park
3400 Plymouth
Plymouth, MN
Dear Rick,
and Recreation
Blvd.
55447
On behalf of the Osseo / Maple Grove Athletic Association
OMGAA) we would like to thank -you for'the use of the Bass
Lake Playfields this past season. Geno and I also want to
express our heartfelt thanks, to you and your staff, for
the service and cooperation given to the Western Community
Senior Recreational Baseball League for their end of the
year tournament.
We are looking forward to working with Plymouth Park and
Recreation again next year.
Sincerely,
Geno Perrozzi
16/17 &18 year old
League Coordinator
gA
Bob Lien
Director
Traveling Baseball
cc: Terry Just, Maple Grove Park & Rec.
Jean Vestal, Maple Grove Park & Rec.
Ken Dalley, Chairman OMGAA
Scott Serbus, Vice -Chairman OMGAA
Parkers Lake Pavilion Calendar
SEPTEMBER -1994
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
7:30-10 BRIDGE
CLUB
4 5 6 7 8 9 10
LABOR DAY 10:45-11:30 FIT 10-3
HOLIDAY CHRISTOPHERSON
475-0898
6:30-7:30 BCW 4:30-7 Merz
475-0541
11 12 13 14 15 16 17
10:45-11:30 FIT ARTS
FESTIVAL
1-4 GORDY
SIMONS 6-10 SUNDBERG- ALL DAY
6:30-7:30 BCW CHELSEA MEWS 6:30-7:30 BCW 5-10 ARTS
476-0966 FESTIVAL SET-UP
18 19 20 21 22 23 24
9:30-11:30 SC 10:45-11:30 FFT 9:00 SENIOR 9:15-12:15 PD 8:30-1 PRESCHL
WALKERS MEET SPECIAL
1:30-4:30 CALVA
9443121
6:3-7:30 BCW
25 26 27 28 29 30
9:30-11:30 SC 10:45-11:30 FFT 9:15-12:15 PD
6:30-7:30 BCW 6:30-7:30 BCW
PLYMOUTH \\
1 M W N
SUNDAY, SEPTEMBER 185 1994
10:00 a.m. - 5:00 p.m.
Plymouth Creek Park, 3625 Fernbrook Lane
Featuring Olde Fashioned Family -Fun Including: -
Antique Cars from 1890 to 1931
Fiddle Contest
Story Telling,
Music by:
Angelo the Organ Grinder
The Plymouth Rockers
C" Notes Barber Shop Quartet
Demos of Olde Tyme Crafts & Skills
Food Vendors
Tour the Historical Society
Pictures taken with Antique Car
Come in Olde Fashioned Costume
The Best Costume will receive a FREE
photo with an antique carl
Schedule of Events:
10:00 a.m. -12:00 p.m. People's Choice Antique Car Judging
10:00 a.m. - 1:00 p.m. Angelo the Organ Grinder, The Mechanical Maestro
12:00 p.m. - 1:00 p.m. Open Mic Fiddle Demonstrations
12:00 p.m. - 3:00 p.m. Story Telling on the Hour
12:30 p.m. - 3:30 p.m. Olde Tyme Demonstrations on the Half Hour
1:00 P.M. The Fiddle Contest Begins
1:30 p.m. Performance by the Plymouth Rockers
1:30 p.m. Antique Car Parade & Awards Presentation
2:30 p.m. Performance by the "C" Notes Barber Shop Quartet
Admission: 2.00 Children 12 and under FREE
For more information call 550-5130 Event will be held rain or shine
Major Sponsors:
Plymouth Historical So
Plymouth Park & Recre
Sharon Anderson,
REALTOR, RE/MAX Resu
Superior Ford
Precision Graphics