Loading...
HomeMy WebLinkAboutCity Council Resolution 1999-457CITY OF PLYMOUTH RESOLUTION NO. 99-457 APPROVING PRELIMINARY LAYOUT COUNTY ROAD 101 HIGHWAY 55 TO COUNTY ROAD 24 CITY PROJECT NO. 9005 WHEREAS, Hennepin County has prepared and is presenting a preliminary layout (Layout No. 2) County Project No. 8911 showing the proposed improvement of County Road 101 from Highway 55 to County Road 24; and WHEREAS, the City is desirous of the completion of County Road 101 improvements within the City of Plymouth and has the proposed project in the City's Capital Improvement Program for the year 2000; and NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA: That said layout (Layout No. 2) be in all things approved and that Hennepin County is hereby authorized by the City to proceed with final design and to acquire all rights-of-way, permits and/or easements required for said improvements in accordance with said layout with the following additions or issues to be addressed: 1. That the length of turn lanes continue to be reviewed and if possible shortened during the final design process if not necessary for projected traffic volumes. This includes the necessity of the right turn lanes for both eastbound and westbound County Road 24 at County Road 101. 2. Install berms where possible to mitigate impacts on adjacent properties if the adjacent property owners will grant the necessary construction access at no additional cost to the project. 3. The project is to have a landscaping plan, including possible screening fences, prepared by the City after roadway construction is substantially completed. The County and City shall share equally in the implementation of the landscaping plan with a maximum budget of 2% of construction costs. Adjacent property owners shall be involved in the plan preparation. Replacement trees shall be as large as possible. 4. The County shall continue to work with City staff in order that there is future connection for the frontage road shown as part of the City's Transportation Plan which extends westerly between Medina Road and Highway 55. C:ADoc=cnts and Settingsubaird\Local Settings\Temp\CCR 1999-457_59656ACCR 1999-457.doc 5. Retaining walls and/or tree walls shall be used where feasible to retain specimen trees. 6. Adequate water quality treatment for the added impervious surface shall be provided. 7. Environmental impacts and proposed mitigation that are addressed in the Environmental Assessment Worksheet (EAW), including noise, shall be considered with the final design. 8. During final design if several specimen trees could be avoided by a slight alignment shift, this should be considered. 9. The County shall continue to work with City staff in order that additional access from County Road 101 might be provided for the commercial property at the southeast corner of the Highway 55 intersection. 10. Advance flashing beacons to provide warning of the pedestrian crosswalk at Medina Road shall be considered. 11. There shall be a study session with the City Council to review the final plans before right-of-way acquisition is started and before approval of final design. 12. Consideration shall be given to reducing the width of the center median in areas where substantial trees or existing vegetation could be avoided. FURTHER, that the City will not be using Tax Increment Financing (TIF) for any portion of its share of the project cost. BE IT FURTHER RESOLVED that the City will adopt a "No Parking" resolution as part of the final plan approval for the roadway. Adopted by the City Council on October 19, 1999. C:ADoc=cnts and Settingsubaird\Local Settings\Temp\CCR 1999-457_59656ACCR 1999-457.doc