HomeMy WebLinkAboutCity Council Ordinance 2006-15CITY OF PLYMOUTH
HENNEPIN COUNTY, MINNESOTA
ORDINANCE NO. 2006-15
AN ORDINANCE AMENDING CHAPTER IV
OF THE PLYMOUTH CITY CODE
CONCERNING ELECTRICAL PERMITS AND INSPECTIONS
THE CITY OF PLYMOUTH, MINNESOTA ORDAINS:
SECTION 1. Section 403.03 of the Plymouth City Code is amended in its entirety to
provide:
403.03 Application, Administration and Enforcement. The application, administration,
and enforcement of the code shall be in accordance with Minnesota Rule Chapter 1300. The
code shall be enforced within the extra territorial limits permitted by Minnesota Statues, 16B.62,
subdivision I, when so established by this ordinance. The Building Inspection Division is the
code enforcement agency for the City of Plymouth, including electrical inspections and permits.
This code shall be enforced by the Minnesota Certified Building Official designated by the City,
of Plymouth to administer the code (Minnesota statute 16B.65) subdivision 1.
SECTION 2. Section 1015.21 of the Plymouth City Code is amended as follows:
1015.21 Other Permit Fees and Charges. The fees and charges for other activities requiring
a permit under this Code are set by this Subsection under the following headings:
jae of PermitFee or Charge
Search Requests
Return Check Fee
Moving
Massage Therapist Certification
Massage Therapy Center License
Sexually Oriented Business - Primary
On premises uses
Off premises uses
Investigation fee
$15
$15
$150 per building
$50 investigation fee,
$50 annual certification fee
$200 investigation fee (non refundable)
$25 licensing fee
$5,000 annual license fee
$1,000 annual license fee
Actual costs, not to exceed $3,000
Sexually Oriented Business - Accessory
Emptying contents of Individual
Sewage Disposal Systems into
Municipal Sanitary Sewer System
Signs Requiring Permits
Street Excavation
Duplicate Inspection Record Cards
Hood and Duct Cleaning
Grading Permit and
Plan Review Fees
Total Cubic Yards
50 cubic yards or less
51 to 100 cubic yards
101 to 1,000 cubic yards
No license fee
Current sewer usage volume charge
$10 per truck load minimum
$25 per every 32 square feet and fraction
thereof of surface area, up to and including
96 sq. ft. or $75 plus $5 per every 100 sq.
ft. and fraction thereof of surface area, over
96 sq. ft.
$30
$4
$50
GRADING PERMIT FEES'
Fee
1,001 to 10,000 cubic yards
10,001 to 100,000 cubic yards
100,001 cubic yards or more
$25.00
$39.00
$39.00 for the first 100 cubic yard
plus $18.50 for each additional 100
cubic yards or fraction thereof
$205.50 for the first 1,000 cubic
yards plus $15.50 for each
additional 1,000 cubic yards or
fraction thereof
$345.00 for the first 10,000 cubic
yards plus $70.00 for each
additional 10,000 cubic yards or
fraction thereof
$975.00 for the first 100,000 cubic
yards plus $38.75 for each
additional 10,000 cubic yards or
fraction thereof
Other Inspections and Fees
$50.00 per hour2
1. Inspection outside of normal business
hours
$50.00 per hour2
2. Reinspection fees assessed for each
inspection or reinspection when such
portion of work for which inspection is
called is not complete or when
corrections called for are not made.
Reinspection fees may be assessed
when the inspection record card is not
posted or otherwise available on the
work site, the approved plans are not
readily available to the inspector, for
failure to provide access on the date for
which inspection is requested, or for
deviating from plans requiring the
approval of the Building Official.
$50.00 per hour2
3. Inspections for which no fee is
specifically indicated (minimum charge
— one-half hour)
'The fee for a grading permit authorizing additional work to that under a valid permit shall be the
difference between the fee paid for the original permit and the fee shown for the entire project.
2 O the total hourly cost to the City, whichever is the greatest. The cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
GRADING PLAN REVIEW FEES
Total Cubic Yards
50 cubic yards or less
51 to 100 cubic yards
101 to 1,000 cubic yards
1,001 to 10,000 cubic yards
10,001 to 100,000 cubic yards
100,001 to 200,000 cubic yards
Fee
No fee
$25.00
$39.00
$52.25
$52.25 for the first 10,000 cubic
yards plus $26.00 for each additional
10,000 cubic yards or fraction thereof
$286.25 for the first 100,000 cubic
yards plus $14.00 for each additional
10,000 cubic yards or fraction thereof
200,001 cubic yards or more
Other Fees
1. Additional plan review required by
changes, additions or revisions to
approved plans (minimum charge —
one-half hour)
*Or the total hourly cost to the City,
whichever is greatest. This cost shall
include supervisors, overhead,
equipment, hourly wages, and fringe
benefits of the employees involved.
Bow and Arrow Deer Hunting Permit
$426.25 for the first 200,000 cubic
yards plus $7.75 for each additional
10,000 cubic yards or fraction thereof
$50.00*
$10
(Ord. 94-20, 11107194; Ord. 95-21, 04104195; Ord. 96-31, 12111196,- Ord. 96-32, 12/18/96; Ord.
98-7, 03/18/97; Ord. 98-39, 11/18/98; Ord. 2003-22, 07/1112003; Ord. 2004-31, 11/23/2004;
Ord. 2005-35, 1112912005; Ord. 2006-03, 01 /10/06)
SECTION 3. Add Section 1015.31 as follows:
1015.31 Electrical Permit, Plan Review, and Inspection Fees. Electrical permit procedures
and fees are as follows. It shall be unlawful for any person to perform work subject to the Building
Code for which a permit is required without first obtaining a permit therefore from the City; such
permits shall be issued by the City only to persons licensed as electrical contractors by the State and
registered as such with the City, or to persons making application to do any such work wholly
within a residence owned and occupied by the applicant, or who owns and will occupy the structure
as a residence upon completions of construction, to whom the permit is to be issued and who shall
be charged the following as permit fees:
(a) Residential Permits (One and Two -Family Dwellings)
(1) Complete wiring on new construction $125.00 per unit
(2) Upgraded electrical services and sub -panels $ 30.00
(3) Wiring of additions, remodeling and rewiring $ 40.00 1" Room + $7.00 each
additional room
(4) Minor work only (furnace wiring, saver switches,
garages, air conditioning, etc.) $ 30.00
(b) Multi -Family Permits
(1) Complete wiring on new construction
(2) Additions, remodeling and rewiring
Permit based on job cost as follows:
$0-$50,000
$50,001 and over
$ 50.00 per unit for first 12
units, $ 30.00 per unit
thereafter
$2.5% of value, ($40.00
minimum fee)
$1,250 for first $50,000 plus
.0075 of remaining balance
(c) Non Residential Permits
(1) Permit based on job cost as follows:
$0-$50,000 $2.5% of value, ($40.00
minimum fee)
$50,001 and over $1,250 for first $50,000 plus
.0075 of remaining balance
(d) Other
(1)
Temporary service during construction
$ 30.00 (0-100 amps)
$ 50.00 (100+ amps)
(2)
Elevators and/or moving stairs
$ 25.00 per unit
(3)
Swimming pools and hot tubs
$ 50.00 each
(4)
Alarm system (120 volts only)
$ 40.00
(5)
Sign wiring
$ 30.00 per sign
(6)
Lighting fixture retrofit/replacement
$ 20.00 + $.50 per fixture
(7)
Exterior pole/building lighting
$ 30.00 + $1.00 per fixture
(8)
Additional inspections
$ 30.00 each
(9)
Plan Check Fees — There shall be a plan check fee of .0015 of the job cost when
value of work exceeds $50,000
SECTION 4. This ordinance shall be effective immediately upon its passage.
ADOPTED by the City Council of the City of Plymouth, Minnesota this 27th day of June,
f►11•
FRA WIRY 0 W�i � APA lux
A TEST:
!Sandra R. Paulson, City Clerk