Loading...
HomeMy WebLinkAboutCity Council Ordinance 2007-06CITY OF PLYMOUTH HENNEPIN COUNTY, MINNESOTA ORDINANCE NO. 2007-06 AN ORDINANCE AMENDING CHAPTERS 5, 7, AND 10, OF THE PLYMOUTH CITY CODE CONCERNING LICENSE AND PERMIT FEES THE CITY OF PLYMOUTH, MINNESOTA ORDAINS: SECTION 1. Section 1015 of the Plymouth City Code is hereby amended as follows: Section 1015 - Permit Procedures and Fees 1015.01. Permits Required. It is unlawful to conduct any activity in the City for which a permit is required by any provision of this Code without first obtaining the permit from the City in the manner provided in this Section. 1015.03. Application for Permit. Application for a permit is made to the City Manager on forms furnished by the City. The application shall contain information as to location, nature, extent and costs of the proposed structure, work, installation, activity, or other purpose, and other information which the Building Official or other duly authorized persons may require under this Code. The application shall contain a declaration that the facts and representations therein made are true and correct, which statement shall be subscribed to by the person or persons, or officers or agents of a corporation, applying for the permit. (Ord. 2003-22, 07/22/2003) 1015.05. Granting of Permits. Upon payment to the City by the applicant of the required fee for any permit, and upon approval of the appropriate inspector, the permit shall be issued, except where City Council approval is required, in which case the appropriate officer may issue the permit only after approval is granted by the City Council. 1015.07. Payment of Fees. Subdivision 1. Payment. The permit fee and other fees and charges set forth in this Code shall be collected by the City before the issuance of any permit, and the City Clerk, Building Official, or other persons authorized to issue a permit for which the payment of a fee is.required under the provisions of this Code may not issue a permit until the fee has been paid. Subd. 2. Double Fees. If a person begins work of any kind for which a permit from the City is required without having secured the necessary permit therefore, either previous to or on the date of commencement of such work, he or she shall, when subsequently securing such permit, pay double the fee provided for the permit, and is subject to the penalty provisions of this Code. (Ord. 2003-22, 07/2212003) Subd. 3. Refunds. Application fees may not be refunded unless the application is withdrawn prior to its referral to the Planning Commission by the City Clerk or the City Council. All refunds are subject to a 20% service charge. 1015.09. Permit Fees. The fees and charges for the various permits required by this Code are set forth in this Subsection. 1015.11. General Rule. Subdivision 1. Building, Fire Protection, Fire Alarm System Permit and Plan Review Fees. Building, fire protection, and fire alarm system permit and plan review fees are those set forth in Subdivision 2. Subd.2. Fees. (a) Plan Review Fees. Plan review fees required by this Section shall be: 65% of the permit fee set forth in subparagraph (b) below. (Ord. 2003-22, 07/22/2003; Ord. 2004-31, 11/23/2004) 25% of the permit fee for similar plans built from a master plan. The Building Official shall determine whether the plan is substantially similar to the master plan. For building permits, similar plans built from a master plan shall be in accordance with the provisions set forth in the Minnesota State Building Code (Ord. 2003-22, 07/22/2003; Ord. 2004-31, 11 /23/2004) (b) Permit Fees. The following schedule of permit fees shall remain effective until revoked by action of the City Council. Total Valuation Fee $1.00 to $500.00 $25 $501.00 to $2,000.00 $25 for the first $500.00 plus $3.25 for each additional $100.00 or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 $73.75 for the first $2,000.00 plus $14.75 each additional $1,000.00 or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $413 for the first $25,000.00 plus $10.75 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $681.75 for the first $50,000.00 plus $7.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $1,056.75 for the first $100,000.00 plus $6 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 $3,456.75 for the first $500,000.00 plus $5 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $5,956.75 for the first $1,000,000.00 plus $4 for each additional $1,000.00 or fraction thereof. Other Inspections and Fees: 1. Inspections outside of normal business hours $50 per hour* (minimum charge - two hours) 2. Reinspection fees assessed $50 per hour* for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. Reinspection fees may be assessed when the inspection record card is not posted or otherwise available on the work site, the approved plans are not readily available to the inspector for failure to provide access on the date for which inspection is requested, or for deviating from plans requiring the approval of the Building Official. 3. Inspections for which no fee is specifically indicated $50 per hour* (minimum charge - one-half hour) 4. Additional plan review required by changes, additions $50 per hour* or revisions to plans (minimum charge - one-half hour) For use of outside consultants for plan checking and Actual costs** inspections, or both * Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. ** Actual costs include administrative and overhead costs. (Ord. 95-34, 06/06/95; Ord. 95-35, 06/06/95; Ord. 98-39, 11118198,- Ord. 2003-22, 07/22/2003; Ord. 2004-31, 11/23/2004) 1015.13. Plumbing. Plumbing permit procedures and fees are as follows. It shall be unlawful for any person to perform work subject to the Building Code for which a permit is required without first obtaining a permit therefore from the City; such permits shall be issued by the City only to persons licensed as plumbers by the State and registered as such with the City or to persons making application to do any such work wholly within a residence owned and occupied by the applicant to whom the permit is to be issued and who shall be charged the following as permit fees: (a) Base minimum permit fee (In addition to other fees set forth in (b) to (d) below (b) Each fixture (c) Yard sprinkler (d) Each permit for alteration or repair of existing plumbing and for other plumbing work not included above thereof $15 Residential $20 Commercial $8 $20 $8 for the first $100 or fraction thereof in estimated cost; $3 for each additional $100 in estimated cost or fraction (e) Water softener $15 per each (Ord. 98-7, 03/18/97, Ord. 98-39, 11118198,- Ord. 2003-22, 07/22/2003; Ord. 2005-35, 11/29/2005) 1015.15. (Repealed, Ord. No. 79-4, Sec. 1) 1015.17. Heating, Air Conditioning, Ventilation, and Refrigeration Fees. (a) For the installation of any central heating and/or air conditioning system, the fee shall be 1.5% of the estimated cost. The minimum fee shall be $100 for any such central system. (b) For additional alterations or repairs to any central system, the permit fee shall be 1.5% of the estimated cost. The minimum permit fee shall be $40. (c) For each appliance or piece of equipment regulated by the Code, but not classed in other appliance categories or for which no other fee is listed in this Code, the fee shall be 1.5% of the estimated cost. The minimum permit fee shall be $40. (Ord. 94-20,11107194; Ord. 98-39,11118198; Ord. 2005-25,1112912005) 1015.19. Water and Sanitary Sewer Permit Fees. Water and sanitary sewer permit fees are as follows: (a) Residential Water Connection or $30 plus cost of meter Disconnection (b) ' Commercial Water Connection or $40 plus cost of meter Disconnection (c) For larger size connections $35 plus cost of meter in relation to its size (d) Water turn-off/turn-on charge (Ord. 94-20, 11/07/94; Ord. 96-32, 12/18/96; Ord. 98-7, 03/18/98; Ord. 99-27, 11102199; Ord. 2005-35, 11 /29/2005) 1) During regular business hours $30 2) Outside regular business hours $45 (e) Curb box adjustment: Residential $35 Commercial $70 (f) Industrial, Commercial, Public and Institutional Property Private Fire Hydrant Inspection Fee $35 per year each (g) Reinspection Fee $15 (h) Temporary Water Service Connection $20 plus cost of water used and $100 deposit required (i) Water Meter Testing: 5/8" to 2" meters $25 3" meters $150 4" meters $150 6" meters or larger $150 (j) Residential Sewer Connection or $30 Disconnection (k) Commercial/Industrial Sewer $40 Connection or Disconnection (1) Commercial/Industrial Water $20 Pressure and/or Conductivity Test (m) Violation of Water Sprinkling Ban $100 for each day of violation of Section 720.41 (Ord. 94-20, 11/07/94; Ord. 96-32, 12/18/96; Ord. 98-7, 03/18/98; Ord. 99-27, 11102199; Ord. 2005-35, 11 /29/2005) 1015.21. Other Permit Fees and Charges. The fees and charges for other activities requiring a permit under this Code are set by this Subsection under the following headings: Type of Permit Search Requests Return Check Fee Moving Massage Therapist Certification Massage Therapy Center License Sexually Oriented Business - Primary On premises uses Off premises uses Investigation fee Sexually Oriented Business - Accessory Emptying contents of Individual Sewage Disposal Systems into Municipal Sanitary Sewer System Signs Requiring Permits Fee or Charge $15 $15 $150 per building $50 investigation fee, $50 annual certification fee $200 investigation fee (non refundable) $25 licensing fee $5,000 annual license fee $1,000 annual license fee Actual costs, not to exceed $3,000 No license fee Current sewer usage volume charge $10 per truck load minimum $25 per every 32 square feet and fraction thereof of surface area, up Street Excavation Duplicate Inspection Record Cards Hood and Duct Total Cubic Yards 50 cubic yards or less 51 to 100 cubic yards 101 to 1,000 cubic yards to and including 96 sq. ft. or $75 plus $5 per every 100 sq. ft. and fraction thereof of surface area, over 96 sq. ft. $30 $4 $50 GRADING PERMIT FEES} Fee 1,001 to 10,000 cubic yards 10,001 to 100,000 cubic yards 100,001 cubic yards or more $25 $39 $39 for the first 100 cubic yard plus $18.50 for each additional 100 cubic yards or fraction thereof $205.50 for the first 1,000 cubic yards plus $15.50 for each additional 1,000 cubic yards or fraction thereof $345 for the first 10,000 cubic yards plus $70.00 for each additional 10,000 cubic yards or fraction thereof $975 for the first 100,000 cubic yards plus $38.75 for each additional 10,000 cubic yards or fraction thereof Other Inspections and Fees Inspection outside of normal business hours 2. Reinspection fees assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. Reinspection fees may be assessed when the inspection record card is not posted or otherwise available on the work site, the approved plans are not readily available to the inspector, for failure to provide access on the date for which inspection is requested, or for deviating from plans requiring the approval of the Building Official. 3. Inspections for which no fee is specifically indicated (minimum charge — one-half hour) GRADING PLAN REVIEW FEES Total Cubic Yards 50 cubic yards or less 51 to 100 cubic yards 101 to 1,000 cubic yards 1,001 to 10,000 cubic yards 10,001 to 100,000 cubic yards 100,001 to 200,000 cubic yards Fee No fee $25 $39 $52.25 $52.25 for the first 10,000 cubic yards plus $26 for each additional 10,000 cubic yards or fraction thereof $286.25 for the first 100,000 cubic yards plus $14.00 for each additional 200,001 cubic yards or more Other Fees 1. Additional plan review required by changes, additions or revisions to approved plans (minimum charge — one-half hour) *Or the total hourly cost to the City, whichever is greatest. This cost shall include supervisors, overhead, equipment, hourly wages, and fringe benefits of the employees involved. Bow and Arrow Deer Hunting Permit 10,000 cubic yards or fraction thereof $426.25 for the first 200,000 cubic yards plus $7.75 for each additional 10,000 cubic yards or fraction thereof $50* $10 (Ord. 94-20, 11107194; Ord. 95-21, 04/04/95; Ord. 96-31, 12111196; Ord. 96-32, 12/18/96; Ord. 98-7, 03/18/97; Ord. 98-39,11118198, Ord. 2003-22, 07/11/2003; Ord. 2004-31, 1112312004; Ord. 2005-35, 1112912005; Ord. 2006-03, 01110106; Ord. 2006- 15, 06/27/2006) 1015.23. Zoning and Subdivision Fees: Special Provisions. Subdivision 1. Scope and Application. This Subsection applies to applications made pursuant to Chapter 5 (Subdivision Regulations) and Chapter 21 (Zoning Ordinance) of this Code. Subd. 2. Fees. (a) Conditional or Interim Use Permit Fee (b) Preliminary Plat Fee (c) Final Plat Fee (d) Rezoning Fee (Amending District Boundaries) (e) Zoning Ordinance Amendment Fee (Amending Ordinance Texi $400 for all new applications $35 for all renewals $25 per acre of land area to be platted, plus $10 per lot and outlot Minimum Fee: $400 $450 $700 $250 Site Plan $400 Site Plan Amendment $200 (g) Zoning Variance Fee $150 for single and two-family dwellings, all others $300 (i) Minor Subdivision Fee (j) Interim Home Occupation License Fee (k) Comprehensive Plan Amendment Fee (1) Administrative Permit Planned Unit (n) Planned Unit Development Final Plan (o) Planned Unit Development Amendment (p) Vacation Fee (Rights -of -Way $150 for each newly described parcel $100 for all new applications $35 for all renewals $500 $50 am $700 NO $150 $200 $450, plus $110 per new easement required or Easements) to be recorded (Ord. 96-32, 12/18/96; Ord. 98-39, 11/18/98; Ord. 2003-18, 06/10/2003; Ord. 2004-03, 0111312004; Ord. 2005-35, 11 /29/2005) Subd. 4. Proposed Development and Land Use Action Announcement Sign Fees. A base fee of $165 will be charged for the installation and removal by the City of signs announcing proposed developments and land use actions as required by Section 21022.01 of the Zoning Ordinance. This fee shall be in addition to the established planning application fee set forth in Subd. 2. The base fee will cover the cost of the installation of one development sign. For each additional sign required, an additional $50 fee shall be paid. (Ord. 98-39,11118198, Ord. 2003-18, 06/10/2003) 1015.25. (Section deleted by Ordinance No. 2004-31, 11/23/2004) 1015.27. Tanks Containing Flammable or Combustible Liquid or Gas: Fees. (a) For the installation, modification, removal, or abandonment or any under or above -ground tank, the permit fee shall be $50 per tank. (Ord. 98-7, 03/18/98) (Ord. 2003-22, 07/22/2003) 1015.29. Subdivision 1. Right-of-way Permit Procedures and Fees. Registration Fee $140 Excavation Permit Hole $160 Excavation Permit Hole New Development $80 Trench Base $125 (plus $.40 per lineal foot over 100 feet) or (plus $.20 per lineal foot over 100 feet new development) Obstruction Permit Fee $40 Permit Extension Fee $30 Delay Penalty ($10 additional for each day after three days) $60 (Ord. 2004-20, 09/13/2004) 1015.31 Electrical Permit, Plan Review, and Inspection Fees. Electrical permit procedures and fees are as follows. It shall be unlawful for any person to perform work subject to the Building Code for which a permit is required without first obtaining a permit therefore from the City; such permits shall be issued by the City only to persons licensed as electrical contractors by the State and registered as such with the City, or to persons making application to do any such work wholly within a residence owned and occupied by the applicant, or who owns and will occupy the structure as a residence upon completions of construction, to whom the permit is to be issued and who shall be charged the following as permit fees: (a) Residential Permits (One and Two -Family Dwellings) (1) Complete wiring on new construction $125 per unit (2) Upgraded electrical services and sub -panels $ 30 (3) Wiring of additions, remodeling and rewiring $ 401St Room + $7 each additional room (4) Minor work only (furnace wiring, saver switches, $ 30 garages, air conditioning, etc.) (b) Multi -Family Permits (1) Complete wiring on new construction $ 50 per unit for first 12 units, $30 per unit thereafter (2) Additions, remodeling and rewiring Permit based on job cost as follows: $0-$50,000 $2.5% of value, ($40 minimum fee) $50,001 and over $1,250 for first $50,000 plus .0075 of remaining balance (c) Non Residential Permits (1) Permit based on job cost as follows: $0-$50,000 $2.5% of value, ($40 minimum fee) $50,001 and over $1,250 for first $50,000 plus .0075 of remaining balance (d) Other (1) Temporary service during construction $30(0-100 amps) $50(100+ amps) (2) Elevators and/or moving stairs $ 25 per unit (3) Swimming pools and hot tubs $ 50 each (4) Alarm system (120 volts only) $ 40 (5) Sign wiring $ 30 per sign (6) Lighting fixture retrofit/replacement $ 20 + $.50 per fixture (7) Exterior pole/building lighting $ 30 + $1 per (8) Additional inspections (9) Plan Check Fees — There shall be cost when value of work exceeds $50,000 (Ord. 2006-15, 06/27/2006) fixture $ 30 each plan check fee of .0015 of the job k � �� � �4 ay,� F -�, i � � s � p �^� U y� F ., iW ✓ � �:.. r: �„ , T �pfl ' SECTION 8. This ordinance shall be effective immediately upon its passage, with the exception of Section 1015.20, which shall become effective for all utility billings mailed after April 1, 2007. ADOPTED by the City Council of the City of Plymouth, Minnesota this 13`h day of February, 2007. Kelli Slavik, Mayor