Loading...
HomeMy WebLinkAboutCity Council Resolution 1997-144RESOLUTION NO. 97. 144 REDUCING REQUIRED FINANCIAL GUARANTEE BASS LAKE ESTATES 3RD ADDITION (9S0* WSBRBAS9 in accordance with the development contract dated July 31, 1995. Prime Builders, Inc., developer of Ban Iain Bstates 3rd Addition (95065). has agreed to install certain impmvemeab for said development; rad WHERBAS, the developer bus completed a portion of the street, utility and aite grading as notrd below; and wlidMAS, the developer has requested a reduction of the required financial guarantee to reflect the completed work; i• �� • 1 I I- 1 1 I- .1 _.II 1 1. .1� ♦.I 1 1 That the raqubed financial guarantee fbr the above items be reduced as detailed above from $11,063 to $5,936 to reflect the completed work. Letter of Credit No. 1738 -995 -DI may be reduced accordingly. �•Qa.reM.ulono�o�wNn�aw�+umolvoneu�.00c ORIGINAL ' NW IM AMnLIDI� dMQTIr1T Strep CuasuuWon $229890 $-0- Sanitary Sewer 119583 4 watermain 25,108 4 storm sewer -)- .0 - Boulevard and Drainage Swale sod 2,400 2,400 Mitigation Pond Construction -0- 4 Sediment Pond Construction 4 -o- Street Signa (1 x 200) 200 200 site Onding and Drainage Impsovements 81500 19700 Park and Trail Improvements 4 -0- 4setting settingIron Monuments 19000 19000 Design, Admmist atton, Inspection, Aa-Builts $,6M .06 TOTAL $800183 6.59936 That the raqubed financial guarantee fbr the above items be reduced as detailed above from $11,063 to $5,936 to reflect the completed work. Letter of Credit No. 1738 -995 -DI may be reduced accordingly. �•Qa.reM.ulono�o�wNn�aw�+umolvoneu�.00c RESOLUTION NO. 97- iaa BASS LAIC ESTATES 3RD ADDITION (95065] Page Two FURTER BE IT RESOLVED that the fmancial 8uaraatee requirements for the folk wing items per Section 8.1 of the approved dewelopwieat contract be reduced as follows: Y � Maint m= of Erasion and Sadlmeat Control Plan Street $weeping and Storm Sewer Ciesnins Cash: Letter of Credit No. 1738 -99S -LS: FlAki(filh,090ho sl,000 sl,000 s8,3oo s8.3oo FURTHER BE IT RESOLVED that the street construction is accepted for condm al mabftmnoe ss of March So 1997 subject to the two year gummme by the Developer per Maintenance Bond No. 018- 888018. Adopted by the City Council on March S. 1997.