Loading...
HomeMy WebLinkAboutCity Council Resolution 1996-166F RESOLUTION NO. 96-166 REDUCING REQUIRED F'INANCiAL GUARANTEE F'ORSTER PRESERVE PLAT 2 (940M WHEREAS, in accordance with the development contract dated September 22, 1994, JANCO, Inc,, developer of Forster Preserve Plat 2 (94057), has agreed to install certain improvements for said development; and WHEREAS, the developer has completed a portion of the street, utility and site grading as noted below; and WHEREAS, the developer has requested a reduction of the required financial guarantee to reflect the completed work; NOW, THEREFORE, BE IT HEREBY RGCOI VED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA; that the financial guarantee requirements are reduced as follows: ITEM ORIGINAL AMIZUN NEW AMOUNT Street Construction $172,230 $501000 Sanitary Sewer 113.200 -0- Watermain 93,725 -0- Storm Sewer 58,145 -0- Boulevard and Drainage Swale Sod 91800 7,400 Mitigation Pond Construction -0- -0- Sediment Pond Construction 51460 11100 Street Signs (I x 200) 1,400 -0- Site Grading and Drainage Improvements 134,800 -0- Park and Trail Improvements -0- -0• Setting Iron Monuments 3,800 -0- Design, Administration, Inspection, .ls-Builts 71.107 _7.626 TOTAL $663,667 $65,520 That the fingtuial gua,antee required for the above items be reduced as detailed above from $157,779 to $65,520 to reflect the completed work. Performance Bond No. 400 )M 2519 originally provided in thu amount of $690,942 (460,628 x 150%) as the required financial guarantee for this project was previously reduced to $236,669 (157,779 x 150%) and is hereby reduced to $98,280 ($6.5,320 x 150%). p:1RH tl1B k\' l.M Nti1 W 01 TH R.901.\R R4N1}7, lX1l' • • RESOLUTION NO. 96-166 JORSTER PRESERVE PLAT 2 (94057) Pace Two FURTHER BE IT RESOLVED that the financial guarantee requirements for the following items per Section 8.1 of the approved development contract be reduced as follows: FV Maintenance of Erosion and Sediment Control Plan Street Sweeping and Storm Sewer Cleaning (See Grading Permit No. 62328 for the required financial guarantees) Cash: Financial Guarantee No. 400 JV 3364: ORIGINAL NEW AMOUNT IM $11000 $1,000 $309000 $22,650 FURTHER BE IT RESOLVED that the sanitary sewer, watentnain, and storm sewer construction is accepted for continual maintenance as of March 20, 1996 subject to the Two Year Guarantee by the Developer per the required Maintenance Bond. No. JR3107. Adopted by the City Council on March 20, 1996. UABH01bU V LMIfMWW 7%X%S01A%X"W7,17M' •