Loading...
HomeMy WebLinkAboutCity Council Resolution 1994-711• RZWIA TION NO.94.711 R®UCING DZVSLOPR UM BOND SUGAR IM -IA 3RD ADDITION 00" WBB AAS, in socordance with the development contract dated Jane 7, 19949 Bupne It. FaebugA Darlene R Fbrbagd, Matin N. Hamad, and Janice B. Buslad, developer of Supr Ri11s 3rd Addition (94044), bu speed to install certain improvemeou for aid deve4meot; and WUtBAS, the &vdoW has completed a portion of the street, utility and site pading as holed below; and Wi18RBAS, the developer has requested a redtrcdon of the development bond to reflect the completed Wodc; NOW, 7HBREFORE, BE rT HEREBY RESOLVED BY THE CITY COUNCIL OF TIM CITY OF PLYMOUTH, M NMOTA; that the bonding requirements aro reduced as follows: That the letter of credit required for the above items be reduced u detailed above from $262,869 to $48,983 to reflect the completed work. Letter of Credit No. 10913 may be reduced accordingly. ORIaNAL AMOUNT NEW AM Street Construction (Excluding City Projects $170,687 $349137 30B and 310) Sanitary Sewer 560169 -0- Watennain (Including costs for difference 64,735 -0- between B' and 12' watermain) Storm Sewer 53,617 -0- Boulevard and Dminap Swale Sod 69800 6,100 Ndpdon Pond Construction 10,000 -0- Sediment Pond Construction 130000 4 Stmet Signs (4 x 200) 100 BOB Site Grading and Drainage Improvements 156,000 4 Fark and Trail Improvements -0- 4 Setting Iron Monuments 26000 20000 Duip, Administration, Inspection, As-BuUu AM _3,W TOTAL $622,505 549,985 That the letter of credit required for the above items be reduced u detailed above from $262,869 to $48,983 to reflect the completed work. Letter of Credit No. 10913 may be reduced accordingly. • RnOLUTION NO. 94. 711 =AR BMiS 3RD ADDITION 00" P60TWO FURMM BE IT RIMMVED dot the boaft requinmeots far the fbDowiog ilea$$ per Section 8.1 of the sppsoved daveiopomw cootw be iedwed u follows: •O� btaintenuoe of Brodon and Sediment Control Plea Street bm9ft and Storm Seaver CluoioS Cash: Letter of Cmdit No. 10912: • toIlk�- $1,000 :11000 $14,300 $14,300 FURTIOR BE TT RBSOLVBD that the sanitary sewer, watumain, and Koem sewer constmction is accepted for continual maintenance u of November 7, 1994 subject to the Two Year Gwcsntee by the Developer per Mainteoanoe Bond No. 34-71230. adopted by the City Council on November 7, 1994