Loading...
HomeMy WebLinkAboutCity Council Resolution 1992-239CITY OF PLYMOUTH RESOLUTION NO. 92-239 RECEIVING PRELIMINARY ENGINEERING REPORT AND ORDERING PLANS AND SPECIFICATIONS NORTHWEST BOULEVARD (FUTURE COUNTY ROAD 61) 54TH AVENUE TO SCHMIDT LAKE ROAD CITY PROJECT NO. 205 WHEREAS, the City of Plymouth, as part of the 1992 Capital Improvements Program, is proposing improvements to Northwest Boulevard by providing a 52 foot wide urban section with concrete curb and gutter, an 8 foot wide bituminous trail, and a grade separated crossing of the street at the Soo Line Railroad, along with utilities; and WHEREAS, a Preliminary Engineering Report was ordered as part of the 1992 Capital Improvements Program; and WHEREAS, the report for the improvements of Northwest Boulevard has been prepared and is being received by the Council on April 20, 1992; and NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA: 1. Such improvement is hereby ordered as proposed in accordance with the Preliminary Engineering Report dated April, 1992. 2. Strgar-Roscoe-Fausch. Inc. is designated as engineer for the improvement. They shall prepare plans and specifications for the making of such improvement. Adopted by the City Council on April 20, 1992