Loading...
HomeMy WebLinkAboutCity Council Ordinance 1975-15CITY OF PLYMOUTH ORDINANCE 75-15 AN ORDINANCE AMENDING CHAPTER II, SECTION 17 OF THE CITY CODE THE CITY COUPiCIL OF THE CITY OF PLYMOUTH DOES HEREBY ORDAIN AS FOLLOWS: Section 1. Chapter II, Section 17 of the City Code is hereby amended to read: "17 Permit Fees. 17.01. Purpose. It is declared to be desirable to have all fees for permits set out in this section of the City Code in order that both the public and municipal officials may more readily ascertain the amount and nature of said fees. Whenever other chapters and sections of the City Code are in conflict with this section, the fees set out herein shall be deemed to be those chargeable with respect to any particular activity. 17.02. Fees. The following fees are established as required by the various chapters and sections of the City Code pertaining to the issuance of permits and shall be collected by the City Manager, or by those acting pursuant to his dire tion, before the issuance by him of any permit. A. Building Permit Fees. (1) A fee for each building permit shall be naid to the bui'Ading official as se- -- below: Fee $5.00 $5.00 for the first $500.00 plus $1.00 for each add'1 $100.00 or fraction thereof $20.00 for the first $2,000.00 plus $4.00 for each addll $1,000.00 or fraction there+ $112.00 for the first $25,000.00 plus $3.00 for each add'1 $1,000.00 or fraction therei $187.00 for the first $50,000 plus $2.00 for each add'1 $1,000.00 or fraction there4 $287.00 for the first $100,000.00 plus $1.50 for each add'1 $1,000.00 or fraction therei $847.00 for the first $500,000.00 plus $1.00 for each add11. -'; $1,000.00 or fraction therei Total Valuation $1.00 to $500.00 $501.00 to $2,000.00 $2,001.00 to $25,000.00 $25,001.00 to $50,000-00 $50,001.00 to $100,000.00 $100,001.00 to $500,000.00 $500,001.00 and up (2) The determination of value or valuation under any of the provisions of this Code shall be made by the Building Official. The valuation to be used in computing the permit fees shall be the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating air conditioning, elevators, fire -extinguishing systems and any other permanent work or permanent equipment (3) Where work for which a permit is required by this Code is started or proceeded with prior to obtaining.; said permit, the fees above specified shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of this Code in the execution of the work nor from any other penalties prescribed herein. (4) If, in the opinion of the Building Official, a plan check is required, a fee shall be charged equivalent to one-half of the applicable building permit fee. B. Plumbing Permit Fees. (1) $20.00 for first ten (10) fixtures plus an additional $1.50 for each plumbing fixture in excess of ten (10). (2) $5.00 for installing, altering, replacement or extension of a water conditionin.r unit or other single fixture. (3) Failure to pay the above permit fees prior to the w. commencement of an installation shall result in the payment of a double charge. C. Electrical Inspection Fees. (1) Payment of fees. All City Electrical inspection fees are due and payable at or before commencement of the installation and shall be forwarded wi,.h the request for inspection. (2) Fee Schedule. Fees shall be paid according to the following schedule: (a) Minimum fee for each separate inspection of an installation, replacement, alteration or repair . . . . . . . . . . . . . . . $4,.'0;[ (b) Services, change of services, temporary services, additions, alterations, or repairs shall be computed separately. 0 to and including 60 ampere capacity $4 5;C 61 to and including 100 ampere capacity. .:$6.QC 101 to and including ?1?0 ampere capacity. For each additional 103 ampere capacity or fraction thereof . . . . . . . . . . . . $3.6t (c) Circuits, installations of, additions, alterations or repairs of each circuit or sub -feeder shall be computed separately including circuits fed from -2- sub -feeders and including the equipment served, except as provided for in items (i) through (iv). 0 to and including 30 ampere circuit capacity . $1.50 31 to and including 100 ampere circuit capacity. $3.00 For each additional 100 ampere circuit capacity or fraction thereof . . . . . . . . . $1,00 (i) In addition to the above fees: (aa) A charge of $.50 will be made for each street lighting standard. (bb) A charge of $1.00 will be made for each traffic signal standard. Circuits originating within the standard will not be used when computing the fee. (ii) In addition to the above fees all trans- formers and generators for light, heat and power shall be computed separately, at $2.00 per unit plus 10t per K V A up to and including 100 K V A. 101 K V A and over at 5t per K V A. (iii) In addition to the above fees (except on dwellings) remote control, signal circuits and circuits of less than 50 volts shall be computed at $2.00 per each ten openings or devices of each system plus $.50 for each additional ten or fraction thereof. (iv) In addition to the above fees all trans- formers for signs and outline lighting shall be computed at $2.00 for the first 500 V A or fraction thereof per unit,_ plus $.20 for each additional 100 V A or fraction thereof. (d) For the review of plans and specifications -of proposed installations, there shall be a minimum fee of $30.00 up to and including $30,000.00 of electrical estimate, plus 1/10 of 1% on any amount in excess of $30,000.00 to be paid by persons or firms requesting the review. (e) When reinspection is necessary to determine whether unsafe conditions have been corrected and such conditions are not the subject of an appeal pending before the City of any court, a reinspection fee of not to exceed the original' unit fee, or $5.00, whichever is less, may be assessed, in writing by the inspector. (f) For inspections not covered herein, or for. requested special inspections or services, an inspection fee of $5.00 may be assessed in writing by the inspector. This section is also applicable of empty conduits and such other jobs as determined by the -Inspector. y (g) For inspection of transient projects including but not limited to Carnivals and Circuses the inspection fees shall be computed as follows: Power supply units - according to - item C(2)(b) of the Fee Schedule. A like fee will be required on power supply units at each engagement during the season, except that a fee of $8.00 per hour will be charged for additional time spent by the inspector, if the power supply is not ready for inspection at the time and date specified on the request for inspection as required by law. Rides, Devices, or Concessions: Shall be inspected at their first appearance of the season and the inspection fee shall be $3.00 per unit. (h) For purposes of interpretation the most recently published edition of the National Electrical Code shall be prima facie evidence of the definitions, interpretations and scope of words and terms used herein. D. Heating, Air Conditioning, Ventilation and Refrigeration Fees: (1) For the installation of any central heating and/or air conditioning system, the fee shall be l% of the estimated cost. The minimum fee shall be $20.00 for any such central system. (2) For additional alterations, or repairs to any central system, the permit fee shall be 1% of the estimated cost. The minimum permit fee shall be $5.00. (3) For each appliance or piece of equipment regulated by the Code, but not classed in other appliance categories or for which no other fee is listed in this Code, the fee shall be 1% of the estimated cost. The minimum permit fee shall be $5.00. Water and Sanitary Sewer Permit Fees: (1) Residential Water Service Meter Fee $15.00 plus cost of meter (2) Commercial Water Service Meter Fee $25.00 plus cost o£ meter (3) For larger size connections $25.00 plus cost of meter" in relatiai to its siz (4) Water turn-off/turn-on charge $15,00 (5) Curb box adjustment: Residential $25.00 Commercial $50.00 (6) Private Fire Hydrant Inspection Fee $25.00 each per` year (7) RPincnantiAn Pa= -tin nn (8) Water turn -on after repair $10.00 1_F" (9) Temporary Water Service Connection $15.00 plus cos' of water -u, and $100.01 deposit required (10) Water Meter Testing: 5/8" to 2" meters $15.00 3" meters $50.00 4" meters $50.00 6" meters $100.00 (11) Residential Sewer Connection $15.00 (12) Commercial/Industrial Sewer $25.00 Connection (13) Commercial/Industrial Water Pressure and/or Conductivity Test $15.00 (14) Violation of Chapter VITT, Section 9.25 $5.00 for each of violate Section 2. Effective Date. This ordinance shall become effective upon its passage and publication. Adopted by the City Council of the City of Plymouth this 1st day of December 1975. Mayor ATTEST: v C k z S