HomeMy WebLinkAboutCity Council Resolution 1984-323CITY OF PLYMOUTH
Pursuant to due call and notice tinereof, are ular meeting of the City Co-imil of
the City of Plymouth, Minnesota, was held on the I day of May , 1984.
The following members were present: Mayor Davenport. Councilmembers Moen. Neils,
Schneider and Crain
The following members were absent: none
Counci_lmember Moen introduced eche following Resolution and moved its
adoptions
RESOLUTION NO. 84- 323
APPROVING MIXED PLANNED UNIT DEVELOPMENT PRELIMINARY PLAN/PLAT AND CONDITIONAL USE
PERMIT FOR LUNDGREN BROTHERS CONSTRUCTION COMPANY FOR THE CITY OF MINNEAPOLIS FOR
PARKERS LAKE DEVELOPMENT - STAGE B: THE PARKERS LAKE NORTH PROPERTY (82066) (MPUD
83-1)
WHEREAS, Lundgren Brothers Construction Company for the City of Minneapolis has re-
quested approval of a Mixed Planned Unit Development Preliminary Plan/Plat,
Conditional Use Permit, and Rezoning for Parkers Lake Development - Stage Bs The
Parkers Lake North Property, for developmend of residential, neighborhood convenience
center, and industrial parcels on 270 acres located between Vicksburg lane and
Niagara Lane, and south of County Road 6 in Sections 28 and 331 and,
WHEREAS, the Planning Commission has reviewed the request at a duly called Public
Hearing and recommends approval;
NOM, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUfiMO
MINNESOTA, that it should and hereby does approve the Residential Planned Unit Devel-
opment Preliminary Plan/Plat and Conditional Use Permit for Lundgren Brothers
Construction Company for the City of Minneapolis for Parkers Lake Development - Stage
B: The Parkers Lake North Property located between Vicksburg Lane and Niagara Lane,
In the northeast quarter of Section 29, subject to the following conditions:
1. Compliance with the City Engineer's Memorandum.
2. Removal of all dead or dying trees from the property at the owner's
expense.
3. No Building Permits shall be issued until a contract has been awarded for
sewer and water.
4. Satisfaction of park dedication requirements with appropriate credits
according to verified acreages and costs per the Dedication Policy in
effect at the time of filing the Final Plat and in amordanee with the
agreement approved under Resolution No. 83-292, as amended by Resolution
No. 84-261.
' 5. Street names shall comply with the City Street Naming System.
6. Compliance with Policy Resolution No. 79-80 regarding minimum floor eleva-
tions for new structures in subdivisions adjacent to, or containing any
open storm water drainage facility.
PLEASE SEE PAGE TWO
b
Page two
Resolution No,. 84- 323
7. Rezoning shall be finalized with filing of the initial Final Plat.
8. No Building Permits shall be issued until Final Plats for phases are filed
and recorded with Hennepin County.
9. Yard setbacks shall be per approved final plans.
10. Appropriate legal documents regarding Homeowner Association documents,
covenants and restrictions as approved by the City Attorney, shall be filed
with the Final Plats.
11. The maximum number of units for each of the development areas designated on
the approved PUD Plan shall be the number of units designated for each area
on the Plan; programs for low and moderate income housing will be subject
to change during the period for development of a project of this scope;
therefore, specific additional density credits for subsidized housing must
await the advent of firm development proposals and be considered at that
time. It must be demonstrated that the subsidized units are mixed and
Integrated with, rather than concentrated and isolated from the market rate
units.
12. The approved number of dwelling units for Stage B is 1,153, based upon the
. assignment of seven bonus points for the entire MPUD which has a maximum
total of 1,529 units, as follows:
a) Size of project (4)
b) Mix of housing (1)
c) Affirmative design (2)
13. The developer will provide copies of the approved overall PUD Plan and its
conditions as an addendum to their purchase agreements.
14. Development of Stage B: The Parkers Lake North Property - Parkers Lake MPUD
shall comply with applicable portions of Resolution Nos. 83-134/83-292, as
amended by Resolution No. 84-261.
15. Staging of the development shall be in accordance with utility availability
as approved by the City Engineer.
16. The Final Plan/Plat application shall include details regarding the number
of private drive access points to Areas M, CH, and L; transition design
elements; and, conformance with the Engineer's recommendation regarding the
design of 9th Avenue North and Shenandoah Lane; and, the future use of
0utlot J.
17. The proposed sidewalks are to be public, and no credit is to be applied
toward park dedication requirements. The sidewalks shall be constructed at
. the same time the public roadways are installed.
PLEASE SEE PAGE THREE
0 Page three
Resolution No. 84- 323
18. Road alignment from Niagara Lane to be re-evaluated, with consideration
given to the potential circulation of industrial traffic through the
residential areas.
19. Modification of design for Area S, so that lot sizes are comparable to the
lots in the neighborhood to the south, and to the west, and are adequate so
building can occur without substantial variances.
20. Completion of the required Environmental Impact Statement (EIS) review
process prior to approval of final plat, development plans, and issuance of
any permits for physical development, including site grading.
The notion for adoption of the foregoing Resolution was duly seconded by
Councilmember Schneider , and upon vote being taken thereon, the
Schneider and Crain
followingvoted against or abstained: nogg
Whereupon the Resolution was declared dufy—passed and pt .