Loading...
HomeMy WebLinkAboutCity Council Resolution 2008-132CITY OF PLYMOUTH RESOLUTION 2008-132 APPROVING A SITE PLAN AMENDMENT AND VARIANCE TO ALLOW AN 18,945 - SQUARE FOOT BUILDING EXPANSION AND FRONT YARD PARKING SETBACK FOR RBC TILE & STONE LOCATED AT 1820 BERKSHIRE LANE NORTH (2008012) WHEREAS, Rollin B. Child, Inc. has requested approval of a site plan amendment and variance for an 18,945 -square foot building expansion and front yard parking setback located at 1820 Berkshire Lane North, for property legally described as: That part of the South 281.50 feet of Lot 2, Block 4, Minneapolis Industrial Park 2"a Addition, lying West of a line drawn perpendicular to the South line of said Lot 2, and from a point therein distant 7.50 feet West of the Southeast corner of said Lot 2, Hennepin County, Minnesota. WHEREAS, the Planning Commission has reviewed the request at a duly called public meeting and recommends approval. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that it should and hereby does approve the request by Rollin B. Child, Inc. for a site plan amendment and variance, subject to the following conditions: 1. A site plan amendment is approved to allow constriction of an 18,945 -square foot one-story warehouse expansion, in accordance with the application materials received by the City on February 21, 2008, except as amended by this resolution. 2. A variance is approved to allow a 25 -foot front yard parking setback along Watertower Circle where 50 feet is required by the Zoning Ordinance, based on the finding that: a. The shape and existing conditions of the lot in association with the placement of the building and existing parking lot restrict the area for logical building expansion on the site. The industrial use of the property requires a large area for trick maneuvering. b. The conditions relating to the hardship are not generally applicable to other properties in the I-2 zoning district. The placement of the building and existing parking lot restrict the area for logical building expansion on the site. The industrial use of the property requires a large area for trick maneuvering. c. The purpose of the variance is not based exclusively upon a desire to increase the value or income potential of the parcel of land. The applicant is proposing the expansion to facilitate sustainability and growth of the company and improve the movement of traffic throughout the parking lot. Resolution 2008-132 File No. 2008012 Page 2 d. The hardship is caused by the Zoning Ordinance and has not been self-created. The building was constricted in 1966 and purchased by the applicant in 1987. e. Granting the variance will not be detrimental to the public welfare or injurious to other land or improvements in the neighborhood in which the parcel of land is located. f. The variance would allow a reasonable use of the land and would not be detrimental to the public welfare or injurious to other land in the neighborhood. The addition would not impair an adequate supply of light and air to adjacent property, endanger public safety, increase congestion of the public streets, increase the danger of fire or substantially diminish property values in the neighborhood. The requested should help to alleviate the congestion by containing trick movement on site rather than on the public street. g. The requested variance is the minimum action required to eliminate the hardship while giving the applicant opportunity to expand the growing company. 3. A separate 2radin2 permit is required prior to commencement of the project if the parking lot/2radin2 work is not done in conjunction with the building expansion. 4. A separate building permit is required prior to commencement of the project. 5. Prior to issuance of any building permits, the applicant shall: a. Sign all plan sheets. b. Complete a site improvement performance agreement and submit a financial guarantee pursuant to Section 21045.10 of the Zoning Ordinance. c. Submit a revised lighting plan in compliance with the maximum watts per square foot requirements of Section 21105.06 of the Zoning Ordinance. d. Submit a revised landscaping plan in compliance with the minimum tree requirements of Section 21130.03, Subd. 2 (c) of the Zoning Ordinance. e. Submit a revised Grading, Drainage, and Erosion Control Plan in compliance with the City's Erosion Control Policy: See Special Conditions. f. Obtain all appropriate permits from: 1) Bassett Creek Watershed District and 2) Pollution Control Agency (NPDES permit) g. Provide a Rain Garden Agreement: A rain garden maintenance agreement is required for two sump manholes and two rain gardens. h. Revise plans to show all of the exits from the new addition provided with paved access to the public way as required by the State Building Code. i. Revise plans to show B612 concrete curb and gutter in the parking lot. j. Revise plans to include the City of Plymouth's Engineering Guidelines & unmodified City Standard Detail Specifications dated March 2008 in the contract documents. k. Revise plans by placing this note on the plan: All storm sewers 12 inches and larger shall be inspected by the Engineering Division. Call 763-509-5500 a minimum of 48 hours in advance to schedule an inspection. Resolution 2008-132 File No. 2008012 Page 3 1. Revise plans by placing this note on the plan: All main line storm sewers 12 inches and larger shall be video inspected, and a video report shall be provided to the City. m. Revise plans by placing this note on the plan: High density polyethylene extruded (HDPE) adjusting rings are required for all strictures. n. Revise Utility note nine on page C2 to state: All Rip -Rap shall be Granite, and have filter fabric placed below the rock. No trash guards shall be installed on storm sewer flared end sections (FES) smaller than 24 inches in diameter. o. Revise Utility note one on sheet C2 to reference utility work shall conform to City of Plymouth's Standard Specifications. p. Revise plans to indicate abandoned utility lines to be removed, or blown full of sand. Specify how each pipe run will be handled. q. Provide a storm sewer stricture table. Include stricture number, size, casting number (per Engineering Guidelines), invert and top elevation. r. Add the site address to the building on the Utility Plan. s. Indicate how parking will be addressed during constriction. t. Address the issue of the conflict with the existing 6 inch sanitary sewer service and the rain garden. Relocate the rain garden or the sanitary sewer service. u. Revise plans to show a concrete driveway apron per City detail STRT-14 as required for the easterly driveway. v. Provide a rain garden planting plan. Include the quantity and type of plugs to be planted, and the location. w. Show evidence that the rain garden will drain within 48 hours as required. x. Revise plans to show the overflow elevation for the rain gardens. A stabilized overflow is required. Indicate if this will be Granite riprap or a turf reinforcement mat. y. Revise plans to identify the silt fence locations and the rock constriction entrance on the grading plan. Include City detail ST -26. z. Revised plans to show the location of the concrete trick washing station. aa. Storm sewer inlet protection is required both on and off-site. Identify the locations where they will be placed. This shall be a requirement of phase one under the Sequence of Constriction (not under phase 2) identified on page C3. Also note that silt fence must be installed prior to any earth disturbing activity. bb. The responsible party for the storm water pollution prevention plan (SWPPP) must sign in the signature block on page C3. 6. Fire Conditions: a. Add a hydrant in an approved location on the east site entry drive. b. Fire lane signs are required at the Fire Department connection and at the east end of the parking lot. c. Cross easement agreements are required between the site property owner and the property owners directly north of the site for unobstructed fire access to the north and east sides of the building and unobstructed access to the existing hydrants from the adjacent north property. d. Identify the post indicator valve location for the south and west building additions. Resolution 2008-132 File No. 2008012 Page 4 e. The Fire Department connection locations for the building additions must be approved by the fire inspector. 7. Silt fence shall be installed prior to any constriction on the site. 8. All rooftop equipment shall be screened or painted to match the building. 9. The applicant shall comply with the noise requirements of Section 2025 of the City Code. 10. Standard Conditions: a. The applicant shall remove any diseased or hazardous trees. b. New signage shall receive sign permits when required and shall comply with the Section 21155 of the Zoning Ordinance. c. Any subsequent phases or expansions are subject to required reviews and approvals per Ordinance provisions. d. The permit is subject to all applicable codes, regulations and ordinances, and violation thereof shall be grounds for revocation. e. This approval shall expire one year after the date of approval, unless the property owner or applicant has substantially started constriction of the project, or unless the landowner or applicant has received prior approval from the City to extend the expiration date for up to one additional year, as regulated under Sections 21045.09 and 21030.06 of the Zoning Ordinance. ADOPTED by the City Council on April 22, 2008. STATE OF MINNESOTA) COUNTY OF HENNEPIN) SS. The undersigned, being the duly qualified and appointed City Clerk of the City of Plymouth, Minnesota, certifies that I compared the foregoing resolution adopted at a meeting of the Plymouth City Council on April 22, 2008 with the original thereof on file in my office, and the same is a correct transcription thereof. WITNESS my hand officially as such City Clerk and the Corporate seal of the City this day of City Clerk