HomeMy WebLinkAboutCouncil Information Memorandum 08-29-2008CITY OF PLYMOUTH
® COUNCIL INFO MEMO
August 29, 2008
UPCOMING MEETINGS AND EVENTS
Planning Commission Agenda, 09/03/08............................................................................................. Page 1
Human Rights Commission Agenda, 09/04/08.................................................................................... Page 2
I-94 West NW Suburban Chamber of Commerce Annual Dinner Meeting, 09/18/08 .........................Page 3
September, October, November 2008 Official City Meeting Calendars ............................................. Page 5
Tentative List of Agenda Items for Future City Council Meetings ..................................................... Page 8
INFORMATION
News Articles, Releases, Publications, Etc ...
Northwest Suburbs to Launch City Meeting Webcasting Services, News Release ............................. Page 9
Battle Builds Over Green in Plymouth, Article, Star & Trib.............................................................. Page 11
Register by Sept. 13 to Qualify for Early Registration Fee for the Plymouth Fire Department's
5KFun Run, News Release.........................................................................................................Page 13
Plymouth Discusses Changing Course on Dial -A -Ride, Article, Star & Trib.................................... Page 14
Exhibiting Tendencies (Public Art), Article, Star & Trib................................................................... Page 16
New Trail Bridge Over Hwy 169 Expected to Open This Fall, News Release ................................... Page 18
STAFF REPORTS
Engineering Dept. Active & Pending Public Improvement Projects 08/28/08 ................................. Page 19
Fire Dept. Six Month Report, January -June 2008.............................................................................. Page 25
Fire -Rescue Incident of Interest, 08/23/08 4940 Underwood Lane .................................................... Page 31
CORRESPONDENCE
Letter from 494 Commuter Services, RE: Participation in 2008 Commuter Challenge ................... Page 32
Thank You from Wynn Johnson & Elmhurst Gateway Subd............................................................. Page 33
Letter from Hopkins Public Schools, RE: Plymouth#1.....................................................................Page 35
Letter from MPCA, RE: Stormwater Pollution Prevention Program for Plymouth ...........................Page 36
PLANNING COMMISSION AGENDA
WEDNESDAY, SEPTEMBER 3, 2008
WHERE: CITY COUNCIL CHAMBERS
Plymouth City Hall
3400 Plymouth Boulevard
Plymouth, MN 55447
CONSENT AGENDA
All items listed on the consent agenda* are considered to be routine by the Planning
Commission and will be enacted by one motion. There will be no separate discussion of these
items unless a Commissioner, citizen or petitioner so requests, in which event the item will
be removed from the consent agenda and considered in normal sequence on the agenda.
1. CALL TO ORDER - 7:00 P.M.
2. PLEDGE OF ALLEGIANCE
3. PUBLIC FORUM
4. APPROVAL OF AGENDA
5. CONSENT AGENDA*
A. Approve the August 6, 2008 Planning Commission Meeting Minutes.
B. Kraus -Anderson Construction Company. Approve site plan amendment for a
21,000 square foot building addition and parking expansion for Zero -Max for
property located at 13200 6`h Avenue North. (2008061)
C. Brad Hotter. Approve variance to construct an 840 -square foot garage addition 10
feet from the side property line where 15 feet is required by ordinance for property
located at 14510 Gleason Lake Drive. (2008065)
D. Eugene Dobkin. Approve shoreland variance to allow two contiguous non-
conforming lots under the same ownership for property located at 2635 Nathan
Lane North. (2008067)
E. Eugene Dobkin. Approve shoreland variance to allow two contiguous non-
conforming lots under the same ownership for property located at 2645 Nathan
Lane North. (2008068)
6. PUBLIC HEARINGS
A. Sunrise Development, Inc. Site plan and conditional use permits for Sunrise
Assisted Living of Plymouth, an assisted living community that would contain 75
residential rooms in three one -level buildings for property located at 3855 County
Road 101 North. (2008037) (Continued from August 6, 2008.)
7. NEW BUSINESS
A. City of Plymouth. City Center Design Book.
8. ADJOURNMENT
Page 1
AGENDA
Plymouth Human Rights Commission
Thursday, September 4, 2008
Regular Meeting at 7:00 p.m.
City Hall
Fire Dept. Training Room
(Public Safety Entrance, 2nd Floor)
3400 Plymouth Boulevard
1. Call to Order
2. Approve Agenda
3. Approve Minutes
A. Minutes of May 1, 2008
4. New Business
A. 2009 Student Essay Contest
5. Reports of Commissioners
6. Police Report
A. Introduce New Police Liaison
B. Bias Crime Report(s) - None
7. Old Business
A. Discuss Bremer Foundation Grants
8. Announcements and Articles (for your information)
A. Annual LMHRC Conference Information
B. Official City Meetings Calendar
C. Plymouth Human Rights Commission Roster
9. Adjournment
Page 2
"orporale
21st Century Ban,
EMBARQ
First National
Financial Service.
Grand Casin
Mille Lacs i
Hinckley
J & B Group
North Memorial
Health Center
The Bank
of
Elk River
Wells Fargo
■
94 WESI
NORTHWEST SUBURBAN
jambe
mmer
Celebratiny 20 years!
.Annual Dinner .Reetiny
Silent .Aueti0n
Page 3
11011 aloe Cordialil� Ifirited
September 189 2008
5 pome to 9 pem.
Elle Grand Ball Room
-jyledina Golf and Country Club
400 Erergreen Road, Medina
Cost: S50/1fer person or 5750/table SpollSor
Be a Part of the Celebration!
RSUt' by September 10, 2008
5:00 P.M.
Social Hour
5:00 poll[.
Silent auction Opens
7:00 p.m.
Special Dinner Enhancements Raffle
jUbleside dinner prepared by your own personal rheil
7:00 P.M.
Dinner
7:30 P.M.
Silent auction Closes
8:.30 P.M.
Program
Wjip.m.
Silent auction Winners announced
Complimentary Valet Service will be provided by
Farmers State Bank of Hamel
table Sponsors
Decimet Sales Highland Bank
EORA M, Maintenance of Way
.Marksman .Metals Riverview Community Bank
Page 4
rp)
City of
Plymouth
Adding Quality to Life
September 2008
Modified on 08/29/08
CHANGES ARE NOTED IN RED
Page 5
1NEE
2
3
4
5
6
7:00 PM
7:00 PM
PLANNING
HUMAN RIGHTS
10:00 AM—
COMMISSION
COMMISSION
3:00 PM
LABOR DAY
MEETING
MEETING
Absentee Voting
Council Chambers
Parkers Lake
CITY OFFICES
Conference Room
CLOSED
7
8
9 8:00 M
10
11
12
13
700 PM
7:00 PM
8.00 AM_
STATE PRIMARY
ENVIRONMENTAL
PARK & REC ADVI-
5:00 PM
ELECTION
QUALITY
SORY COMMISSION
Absentee Voting
5:00 PM City Council
COMMITTEE
(PRAC) MEETING
Filings Close
(EQC) MEETING
Council Chambers
8:00 PM
5:00 PM
Medicine Lake Room
REGULAR COUNCIL
Deadline to
MEETING
Withdraw for
Council Chambers
Council Filings
14
15
16
17
18
19
20
6:00 PM
7:00 PM
Autumn
SPECIAL COUNCIL
PLANNING
Art Fair
MEETING
COMMISSION
Parkers Lake
Medicine Lake Room
MEETING
2009-2013 Capital
Council Chambers
Improvements
Program
8: Hilde Performance
Center
21
22
23
24
25
26
27
7:00 PM
7:00 PM
7:00 PM
REGULAR COUNCIL
PLYMOUTH
HRA MEETING
MEETING
ADVISORY
Medicine Lake Room
Council Chambers
COMMITTEE ON
TRANSIT (PACT)
MEETING
Medicine Lake
Room A
28
29
30
ROSH HASHANAH
Begins at Sunset
Modified on 08/29/08
CHANGES ARE NOTED IN RED
Page 5
rp)City of
Plymouth
Adding Quality to Life
October 2008
Modified on 08/29/08
Page 6
1 7:00 PM
2
3 �_ Absentee
4 1:00 PM
PLANNING
Voting
Plymouth
COMMISSION
Begins for
On Parade
MEETING
General Election
Celebration
Council Chambers
City Center Area
5
6
7
8
9
10
11
6:30-8:30 PM
7:00 PM
7:00 PM
Volunteer
ENVIRONMENTAL
PARK ft REC
12:00-4:00 PM
Recognition Event
QUALITY
ADVISORY COM-
Fire Dept.
Plymouth Creek
COMMITTEE
MISSION (PRAC)
Open House
Center
(EQC) MEETING
MEETING
Fire Station III
Medicine Lake Room
Council Chambers
YOM KIPPUR
at Sunset
12
13
_.Begins
14
15
16
_
17
18
7:00 PM
7:00 PM
REGULAR COUNCIL
PLANNING
COLUMBUS DAY
MEETING
COMMISSION
Observed
Council Chambers
MEETING
Council Chambers
PLYMOUTH PUBLIC
WORKS DIVISION
CLOSED
19
20
21
22
23
24
25
7:00 PM
7:00 PM
PLYMOUTH
HRA MEETING
ADVISORY
Medicine Lake Roam
COMMITTEE ON
TRANSIT (PACT)
MEETING
Medicine Lake
Room A
26
27
28
29
30
31
Daylight
7:00 PM
5:30-8:30 PM
Savings
REGULAR COUNCIL
Halloween on
Ends
MEETING
the Creek
Set Clocks Back 1
Council Chambers
Plymouth Creek
Hour
Center
Modified on 08/29/08
Page 6
rp)
Plymouth
t
Adding Quality to Life
November 2008
Page 7
1�9:00AM-
- 3:00 PM
Absentee
Voting
2
3
4_
5
6
7 _
8 --
8:00 AM -
7:00 AM •
7:00 PM
7:00 PM
6:00 PM
8:00 PM
PLANNING
HUMAN RIGHTS
Absentee
General
COMMISSION
COMMISSION
Voting
Election
MEETING
MEETING
Council Chambers
Parkers Lake
Conference Room
9
10
11
12
13
14
15
7:00 PM
7:00 PM
7:00 PM
REGULAR COUNCIL
ENVIRONMENTAL
PARK & REC
MEETING
QUALITY
ADVISORY COM -
Council Chambers
VETERANS DAY
COMMITTEE
MISSION (PRAC)
Observed
(EQC) MEETING
MEETING
Medicine Lake Room
Council Chambers
CITY OFFICES
CLOSED
16
17
18
19
20
21
22
7:00 PM
7:00 PM
PLANNING
HRA MEETING
COMMISSION
Medicine Lake Room
MEETING
Council Chambers
24
25 7:OOPM
267:00PM
27 �
28
29
REGULAR COUNCIL
PLYMOUTH
MEETING
ADVISORY
Council Chambers
COMMITTEE ON
THANKSGIVING
THANKSGIVING
X30
TRANSIT (PACT)
HOLIDAY
HOLIDAY
MEETING
Medicine Lake
CITY OFFICES
CITY OFFICES
Room A
CLOSED
CLOSED
YM�IIaA�n /IY/t0/N
Page 7
Tentative Schedule for
City Council Agenda Items
September 9, Regular, 8:00 p.m., Council Chambers
• Adopt preliminary 2009 budget and tax levy
• Approve variance to construct an 840 -square foot garage addition 10 feet from the side
property line where 15 feet is required by ordinance for property located at 14510
Gleason Lake Drive. Brad Holter. (2008065)
• Approve site plan amendment for a 21,000 square foot building addition and parking
expansion for Zero -Max for property located at 13200 6s' Avenue North. Kraus -
Anderson Construction Company. (2008061)
• Recognize Peter Larson for KARE-I I's "Eleven Who Care"
• Consider Variance to allow construction of a 625 square foot detached garage in the front
yard for property located at 5755 Juneau Lane. James Claseman. (2008047) (Tabled
from August 26)
• Review Requests for Proposals for Recycling Contract and provide direction to staff
September 16, Special, 6:00 p.m., Council Chambers
• Review Capital Improvements Program 2009-2013
• Discuss plans for Hilde Performance Center
September 23, Regular, 7:00 p.m., Council Chambers
• Transmit Comprehensive Plan to Metropolitan Council. City of Plymouth. (2005050)
• Recognize Police Explorers on their National Explorer Competition
• Approve preliminary plat to allow "Gutlovics Addition" for three single family lots
located at the northwest corner of the intersection of 26s' Avenue and County Road 101
North. Gartner Engineering, LLC. (200704 1)
October 14, Regular, 7:00 p.m., Council Chambers
October 28, Regular, 7:00 p.m., Council Chambers
November 10, Regular, 7:00 p.m., Council Chambers
November 25, Regular, 7:00 p.m., Council Chambers
Note: Special Meeting topics have been set by Council; all other topics are tentative. page 8
Northwest .Suburbs
Cable Communications Commission
6900 Winnetka Avenue North,
Brooklyn Park, MN 55428
763-536-8355
www. nwsccc.org
For Immediate Release — August 27, 2008 — Brooklyn Park, MN
Contact: Tim Gaffron, Manager— Municipal Telecommunications Services
Northwest Community Television, 763-533-8196
Northwest suburbs to launch city meeting webcasting services
Area residents will soon be able to see many of their local city's meetings live on
the internet, and will be able to watch replays of all or part of those meetings at
their convenience through a link on their city's web site.
The Northwest Suburbs Cable Communications Commission (NWSCCC) has
funded and is coordinating this project for its nine member cities: Brooklyn
Center, Brooklyn Park, Crystal, Golden Valley, Maple Grove, New Hope, Osseo,
Plymouth and Robbinsdale. The NWSCCC negotiates, adopts and enforces
cable franchise agreements with cable television providers in the northwest
suburbs of Minneapolis, Minnesota. In addition, the NWSCCC provides and
funds Northwest Community Television and Channel 12.
The new on-line service is powered by San Francisco -based Granicus, Inc., the
premier provider of government webcasting and public meeting management
solutions to nearly 400 government agencies spanning 39 states across the
nation.
Deployment of the system will be in stages over the next several months, with
completion anticipated by the end of December, 2008. The first two cities to go
on-line with the service will be Brooklyn Center and Crystal scheduled for early
September. Residents should watch their city newsletters, websites and local
newspapers for more information on when their city's service will be activated
and how to access the on -demand video offerings.
NWSCCC's Granicus Solution includes streaming software to capture, manage,
store and distribute online video recordings. The video page includes an agenda
keyword search so users can simply search for an issue they are interested in
watching. The video player window will include the meeting agenda with links to
access specific agenda items within the archived meeting. Archived meetings will
Page 9
generally be available for viewing by the morning after the meeting takes place.
Meetings will be archived and available for viewing for one year.
Residents will be able to access the live and on -demand video offerings through
a link on their city's website. From there they will be redirected to the host site
provided by the Northwest Suburbs Cable Communications Commission at
www.nwscec.org.
City meetings that are currently cablecast on Channel 16 will still be seen live on
that channel and replayed at their regular times. The webcasting service will be
in addition to the cablecasting services that have been provided since 1982 by
the NWSCCC and Northwest Community Television.
0
About Granicus
Founded in 1999, San Francisco -based Granicus® helps government and
constituents communicate without barriers. Serving more than 400 governing
bodies in 39 states and reaching more than 25% of the American population,
Granicus solutions enable vital improvements to public access, civic
engagement, government accountability, and efficiency. We manage the world's
largest government webcasting network, supporting more than 85,000 public
meetings and other government content, securely and reliably bringing vital
government information closer to the people.
www.granicus.com
Contact: Lauren Alexander, Granicus, Inc., 415-357-3618
Page 10
Battle builds over green in Plymouth
http://www.startribune.com/templates/Print This Story9sid-27572179
StarTribune.com MINNEAPOLIS -ST. PAUL, MINNESOTA
Battle builds over green in Plymouth
By JENNA ROSS, Star Tribune
August 28, 2008
Plymouth had hoped to go greener with its recycling program. It hadn't counted on the
backlash from residents concerned about cost and changes to their recycling routine.
The battle began with a letter from Plymouth's current recycler to residents, escalated into
more than 1,100 calls and e-mails to city officials, and peaked at a packed four-hour
meeting Tuesday night.
In the end, the City Council backed away from a new recycling contract with St.
Paul -based Eureka Recycling. It will revisit all five proposals it had received from three
contractors, including Eureka, at a meeting in September.
"I heard you," Council Member Sandy Hewitt told residents Tuesday night. She had voted
last month to prepare the contract with Eureka, but on Tuesday she said she would not
approve it.
The contract would cost about $400,000 more over three years than a proposal from
Waste Management -- the city's currently recycler — but would allow more people to
recycle more things.
On one side, cost and convenience. On the other, the environment.
"In my view, in this case, the inconveniences are trumped by doing what's right and
responsible," said resident Ted Olson.
But at Tuesday's meeting, residents and officials debated whether Eureka's proposal
would actually benefit the environment more than Waste Management's — or benefit it
enough to justify the price.
"People need to understand that none of us who are against the contract are against
recycling," said resident Danna Smishek. "But ... I think we're all aware that we need to
save money, too."
Those who favored Eureka -- which serves several cities, including St. Paul, Roseville and
soon St. Louis Park-- pointed to the percentage of materials picked up that actually get
recycled. Waste Management has said that it ends up recycling all but 5 to 6 percent.
Eureka has said that it recycles all but 1 to 2 percent.
Eureka also recycles more things, including juice boxes, milk cartons, clothes and shoes.
But some residents said they don't use juice boxes and can give their clothes away.
And there was much discussion about when and how often Eureka's trucks, which run on
bio -diesel, would make pickups. Eureka would make five days a week, Waste
I of 8/28/20 Page 11
Battle builds over green in Plymouth
Management three days.
http://www.startribune.comhemplates/Print This_Story0sid=27572179
"I don't see this as this great, wonderful thing we're doing for the environment," said
Mayor Kelli Slavik, who voted against drawing up the contract with Eureka back in July.
Pros and cons
Both recycling providers say they'd get a greater number of people to recycle — Eureka
by doing education and outreach, Waste Management by not requiring residents to sort
materials into two categories.
Much of that argument mirrors one within the recycling community at large: To sort or not
to sort.
Although not truly a "single -stream" system, Waste Management combines all materials in
its truck, so about 50 percent of its Plymouth clients have done the same when depositing
their recyclables at the curbside, a Waste Management spokeswoman said.
If residents are allowed throw it all in one bin, the company argues, more choose to
recycle.
With Eureka, residents must sort their recyclables into two categories -- paper and
containers. The hauler collects them in separate compartments on trucks, and the
materials are processed separately.
That leads to better -quality materials which fetch higher prices, the company argues.
Under the proposed contract, Plymouth would receive 50 percent of those profits.
Letters fed opposition
Much of the backlash to the contract was fueled by two letters Waste Management sent
to residents. They warned that Eureka's proposal would require residents to sort their
recyclables and to put them out on a different day than their trash — all while costing more
money.
City staff have said the letters left out key information. At the meeting, Hewitt admonished
Waste Management for sending them, raising her voice and pounding her finger.
"If I ... ran government as a business, you'd be fired. On the spot," she said. "It was very
inappropriate what you did."
Eureka Co -president Tim Brownell, who in the past had chosen not to respond to Waste
Management's letters, also had tough words for his competitor on Wednesday:
"Over the last four weeks, Waste Management has sent out more information to
Plymouth residents that has concerned and confused them than they have in the last four
years encouraging them to recycle," he said. "Therein lies the difference."
Jenna Ross • 612-673-7168
2 of 3 8/28/20, Page 12
City of Plymouth
News Release
For Immediate Release
August 27, 2008
Contact:
Steve Marti, 763- 546-9220
Register by Sept. 13 to qualify for early registration fee
for the Plymouth Fire Department's 5K Fun Run
If you register soon, you can still qualify for the early registration fee for the Plymouth
Firefighters' 5K Run/Walk on Sat., Sept. 27. Registration fees for the annual event will increase after
Sept. 13.
Registration fees are $18 for registrations received by Sept. 13, and $23 for registrations
received Sept. 14 or later. Race day registration will be accepted from 7:30 to 8:45 a.m. Runners and
walkers in the 5K will receive a long-sleeved T-shirt.
The 5K run/walk will start at 9 a.m. at Plymouth Fire Station H, 12000 Old Rockford Rd. The
5K will be followed by a free kids fun run at 10 a.m. The 3.1 mile course is laid out south of the fire
station on neighborhood streets with gently rolling hills.
For more information and a registration form, call 763-546-9220 or visit the City of Plymouth
web site, www.ci.plymouth.mn.us. Click on the tab for "news/events." Registration forms are also
available at area running stores. You can register online at active.com or midwestevents.com.
Proceeds from the event will benefit the Plymouth Firefighters Relief Association. This event
is sponsored by the City of Plymouth, Plymouth Fire Department and the Medicine Lake Run Group.
Page 13
Plymouth discusses changing course on Dial -A -Ride
StarTribune.com MINNEAPOLIS -ST. PAUL, MINNESOTA
Plymouth discusses changing course on Dial -A -Ride
By JENNA ROSS, Star Tribune
August 24, 2008
Sure, Plymouth has good housing, nice people and plentiful parks, but Sam Jasmine moved there for the Dial -A -Ride.
"I had heard that it was, by far, above and beyond other communities;" she said.
Page I of 2
Jasmine is visually impaired and counts on the curb -to -curb bus service. But just months after moving in, she's concerned that
her reason for relocating could be slipping away.
Plymouth is considering cutting hours and upping fares for its heavily subsidized Dial -A -Ride, which is open to anyone but
generally used by the elderly, poor and disabled.
At recent City Council work session, some city officials advocated eliminating the program and diverting its funding to the city's
busy commuter buses. Getting rid of the service could save about $950,000 a year, according to a staff report.
The changes on the table now — including possibly canceling all Saturday rides and increasing fares by $1.50 a trip -- are "like
taking a spoonful of water out of the Pacific Ocean," said Council Member Tim Bildsoe.
"It doesn't really mean a lot to raise fares because at the end of the day, it's not an efficient service;" he said. "Eventually, I'd like
to see these monies allocated to something that's successful."
The current $2 fare made up only a small portion of the $17 average cost per ride during 2007, which is rising with higher fuel
costs. The remaining $15 came from Plymouth's share of the Motor Vehicle Excise Tax, which is lagging.
But transportation and elderly advocates warn that senior citizens and others rely upon the rides and that if Plymouth doesn't
provide the service, they won't be able to get to work, appointments or social outings.
And, the advocates say, only some of the people who use Dial -A -Ride have other transit options, and those services also are
raising fares. They include Metro Mobility, an area -wide transit service for people with disabilities and a certification from their
doctor.
"Most of these people, they're handicapped. Not to the extent that they'd take Metro Mobility, but to the extent that they can't
walk a couple blocks to the bus." said Patty Doter, a member of the Plymouth Advisory Committee on Transit, or PACT.
Alternative plans
PACT has recommended eliminating Saturday service, which would save about $42,500 a year, according to a staff report.
Increasing the fare from $2 to $3.50 would add $75,000 more in annual revenue.
Other transportation providers have considered similar steps. This month, the Metropolitan Council voted to raise fares for Metro
Mobility by 50 cents, to $4 during rush hour and $3 at off-peak times.
And Maple Grove — which, like Plymouth, runs its own transit service — is in the "very preliminary" stages of discussing whether
to raise its fare slightly, said City Administrator At Madsen. At $1.75 per trip, it could be the cheapest government -run program in
the metro area.
http://www.startribune.com/templates/Print_This_SiOry?sid=27315619 8/25/21 Page 14
Plymouth discusses changing course on Dial -A -Ride
Page 2 of 2
The Wayzata -based nonprofit Interfaith Outreach and Community Partners operates a volunteer driver program, offering rides for
free to those who need them.
In the past, shifts in Plymouth's Dial -A -Ride program have affected the nonprofit's program, said Susan Falterer, director of
volunteer services. When Plymouth's Dial -A -Ride program was recently strained and not everyone was able to get a nide, the
number of people who called the nonprofit to get to English and GED classes doubled, she said.
"Il has had a huge impact on our driver program —just a huge impact," Fetterer said.
Weighing the efficiency
Last year, Plymouth's Dial -A -Ride gave about 65,000 rides, which users schedule ahead of time. The service's mini -buses travel
to anywhere in Plymouth, as well as shopping and medical centers just outside the city, such as Ridgedale in Minnetonka.
According to a recent survey of 117 customers, 79 percent used Dial -A -Ride at least once a week, 62 percent to get to work.
While 72 to 85 percent of those surveyed got rides on weekdays, only 15 percent used the service on Saturdays.
The Metropolitan Council sets standards to evaluate such programs"'productivity and efficiency," and Plymouth's Dial -A -Ride
meets one of them.
In the first half of this year, it averaged 3.08 to 3.33 passengers per hour, more than the three -passengers -per -hour standard.
But its subsidy -per -passenger is high and climbing — in June, it was $16.87 per passenger — and the city hopes to lower it with
the fare increase.
Meanwhile, there's a "huge demand" for more Metrolink buses, which carry commuters to and from downtown Minneapolis
during rush hour, said Sarah Hellekson, the city's transit and solid waste manager. With more funding, that service could be
further expanded into the northwest area of the city.
Bildsoe said that adding to Metrolink would "get more bang for our tax money ... and maybe even serve more people in the city."
"It's not always about the money;" Hellekson responded. "It's also about providing a service.
After deciding on fares and service days in the coming months, the City Council likely will look at the general merits and
drawbacks of Dial -A -Ride in January.
Jenna Ross • 612-673-7168
® 2008 Star Tribune. All rights reserved.
http://www.startribune.com/templates/Print This_Story?sid=27315619 8/25/2( Page 15
REMEE7ONESSCHNFHUEP ren,-.r!anez(>z;ar.:iCu:?ecc
Amor+oRzosah,4, and his neighbor Ce-,- Fagen,i_, stopped to playon a bronze rabbitsculpture on Minnehaha Parkway inet�inneare-i5�nMondaymorn
-
in,,w�ilecutcnai alk re-.,_^i�--=pepuiaxamongmamicl:ildraninthe neighborhood �•holovetoclimband pi;y;,r:ii
r"'I'l F- l 4 p`3 v g 617
b
P 6 � r q E �n��Y31��gCVP ? 1 ! A H R
o Public art be ets more public aft. And more and more suburbs are eaaerto shoin t el
artist
��.iC na tui _. s.
Bp n4A't' jANE SXICI ANKA
Silk i:l!I,C�C:BR^iR10[t::T.
lure scene vJ11 be deeicated in Edina next mon' h. "'he
,stainless steel sculpture in Centennial bakes Park is int -in' :c: a
Funin, things happen When people are evposed to outd or metaphor for the continuum ofhfe. Bur It almost certBiri` %v:1 e :le
sculptures.
In Richfield, people put costumes on the life-size bronze of a
former mal -or. On t`inn^apolis' Minnehaha Park.vay, kids clam-
ber up a bi- bronze bunny. And before three giant bronze bulls ly-
ing p...cefully on the University of Minnesota's St. Paul campus
were anchored to the ground. nighttime pranksters flipped over
two o' the 1,400 -pound beasts.
Ili: newest addition to the Twin Cities' booming public scull -
known simple• as "the big pine con:: "
Sculptures are popping up alt c
Cities suburbs as well as 1h: c;' '
readyhavcflnemarecreatingpubl. i :oar,_ _; ��" :�.-
couragemerd of cities, savvy develo e
their proiects as a way m soften sor rx n:•:
nj pat'r:!n,_, lots.
public art mniii yes. I-. s "Ie5 P, -:till ,`" , . ...
Page 16
EXHIBITING TENDEN02 I
4 PUBLIC ART FROM Bi
Advocates for public art say
it creates a sense ofplace and is
just plain fun.
"Public art is much less pas-
sive than the kind of art you see
in a museum," said Jack Becker,
executive director of Forecast
Public Art in St Paul and a con-
sultant on public art projects in
the region.
"Sculpture ... is like theater,"
he said. "You move around it,
it changes in the light, you're
one-on-one with it and it
changes with you."
Spreading in Richfield
It also can be infectious. A
hotbed for public sculpture
is Richfield a community not
known for its wealth But will-
ing developers, an arts com-
mission, interested city offi-
cials and generous donors have
made sure sculpture abounds.
In one block of Lyndale Av-
enue, there's a sculpture that
moves in the wind, the bronze
of former Mayor Marty Kirsch
and a sculpture of Don Quix-
ote and Sancho Panza. Nes-
tled across the street behind
a parking ramp are a dozen
sculptures in Kirchbak Sculp-
ture Garden, which honors one
of the founders of the former
Richfield Bank and Trust.
"It just kind of got into their
blood [in Richfield];" Becker
said. "They realize that this is
part of the way suburbs develop
a unique identity for themselves
and make themselves distinct"
Wayzata set up a public art
committee last fall and is dis-
cussing projects for two rede-
velopment projects. "We think
it adds something special to
your downtown ... that special
oomph;' said city planner Bry-
an Gadow.
The fust project for Edi-
na's public art committee was
an art -glass window for the
City Hall that opened in 2004.
Sculptures also are displayed
in the city's Grandview Park,
and sculptures and other art
may be added to the Prome-
nade, which links Centennial
Lakes with the Galleria area.
Just south of the Promenade,
the pine cone will be dedicat-
ed on Sept. 13. It was paid for
by John and Jean Hedberg, who
owned the gravel business that
occupied the land where Cen-
tennial Ickes is located. The
sculptor is Marcia McEachron,
who has other works on dis-
play in the Twin Cities.
Public art is "the presence
of human imagination in pub-
lic places," McEachron said. "It
says,'We are here."'
Fueled by donors, developers
Like the pine cone, most of
the sculpture erected in pub-
lic places in suburbs is paid
for by donors or developers.
Jan Susee, a Richfield attorney
who is one of the city's biggest
public art advocates, said a lit-
tle bit of public money or a de-
cision to honor someone can
get fundraising rolling. That's
what happened with Kirchbak
Sculpture Garden, he said.
St. Louis Park asks develop-
ers to contribute to a fond to
pay for art at their site or for
arts projects elsewhere in the
city. Two sculptures will go up
near the redeveloped comer of
36th Street and Wooddale Av-
enue, said City Manager Tom
Harmening. In Edina, residents
can contribute to a public art
fund by adding a donation to
their quarterly utility bill. on-
ly about 100 families do so now,
said Linda Kieffer, chairwoman
of Edina's public art committee,
but she hopes more will,
"It's a painless way to raise
money, and the beauty is it's
voluntary," she said.
The risk to public sculp-
ture is that it can be loved too
much. The midnight flipping
of the U's giant bulls may have
been amusing, but "it's a night-
mare for the people who have
to care for them," Becker said.
Said Kieffer, `All you can do is
choose pieces that are durable
[and] can withstand the ele-
ments and rigorous cleaning,
should it need it"
R1CF,k?ZD S'cNNOTT • rsen ott@startribune.com
Artist Marcia McEachron gave a tour of the floor of Linders Special-
ties, where the latest in public art is being fabricated. As part of the
growing popularity of public art,the city of Edina is having a large
stainless steel pine tone installed in its Centennial Lakes Park
Richfield's newest sculpture
is awhimsicalbronze of a boy in
goggles and a cape balancing on
a paper airplane with arms out-
stretched. It's at a main entrance
to Cedar Point Commons, a re-
tail development at Hwy. 77
and 66th Street The developer,
Ryan Companies, bought the
sculpture and has paid for oth-
ers at developments in Apple
Valley and Maple Grove.
Richfield Council Member
Sue Sandahl thinks her city
may have enough sculptures
along the 66th Street corridor
i
for a"sculpture crawl." She has
encouraged a business own-
er on the street to think about
adding a sculpture on one cor-
ner. Later, she said, perhaps a
school art department would
be interested in doing a sculp-
ture. The tour would end with
the little-known Kirchbak
Sculpture Garden — "the best -
kept secret in Richfield," San-
dahl said.
"I can envision having this
all across the city," she said.
Mary Jane Smetanka • 612-673-7380
W
W
Re,
Th
FM ffoMc
Page 17
ThreeRivers
PARK DISTRICT
August 19, 2008
FOR IMMEDIATE RELEASE
Contact: Jason McGrew -King
Intergovernmental Media Relations Coordinator
763/559-6779
imcgrew-kinq@threeriversparkdistrict.org
Tom Knisely
Media Relations Specialist
763/694-7617
tkniselv(a)threeriversoarkdistrict.org
NEW TRAIL BRIDGE OVER HWY. 169 EXPECTED TO OPEN THIS FALL
Construction is taking place on a new bridge that will provide an easier and safer way for pedestrians
and bicyclists to cross over U.S. Highway 169 at 36th Avenue N. on the New Hope -Plymouth border.
The new bridge is being built slightly south of the 36th Avenue N. bridge that carries vehicular traffic
over 169. It will be an integral part of the Bassett Creek Regional Trail, which will run from French
Regional Park in Plymouth, through New Hope, Crystal and Golden Valley, and connect to Theodore
Wirth Park.
With Armstrong High School and Plymouth Middle School located west of Hwy. 169 on 36th Avenue N.,
the new span will make it easy for students to get to and from school. However, during construction
this fall, parents are reminded to make sure their children follow the posted detour to the north side of
36th Avenue N. as they cross over Hwy. 169. Contractors are making good progress on the new bridge,
and it is expected to be completed this November. For more information, call 763-559-9000 or visit
http://www.ThreeRiversParks.org.
About Three Rivers Park District
Three Rivers Park District is a natural resources -based park system that manages park reserves,
regional parks, regional trails and special -use facilities in the Twin Cities metropolitan area. The Park
District offers facilities for every season, including picnicking, swimming, creative play, boating, fishing,
downhill skiing, snowboarding, golf, camping and sledding; extensive trails for hiking, biking, in-line
skating, horseback riding, cross-country skiing and snowshoeing, as well as program sites for nature,
recreation, historic and farm education.
Three Rivers Park District's mission is to promote environmental stewardship through recreation and
education in a natural resources -based park system. The Park District owns and operates over 27,000
acres and serves more than 5 million visitors a vear.
Revised: 8/28/08
City of Plymouth Engineering Department
Active and Pending Public Improvement Projects
Prot.
or
'CIL
Proj.
Estimated
No.
Type
Project Description
Manager
Consult
Total Cost
Current Notes
Active Public Improvement Projects
1013
S
Fernbrook Ln. - 27th to 34th - Design & ROW &
DC/BM
SRF
$5.741.000
Construction started on 7/16/07. Utilility
Construction
cordination for 2008 held on 3/4/08. Xcel Energy
has relocated the two power poles south of Hwy
55 as of April 1. Eureka Construction is
antcipating starting the remaining work beginning
the week of April 14. all work except for
restoration with seed sod and plantings south of
Hwy 55 to be complete on or before 6/27/08. All
underground work and retaining wall south of
hwy 55 completed as of 5/6/08. Sidewalk and trail
north of TH 55 completed on 5/23. Base paving
south of TH 55 completed on 5/23. All concrete
work expected to be completed by 6/18. Final
bituminous layer and pavement marking expected
to be completed by 6/27. Final paving and striping
completed 7/7/08. 8/26/08 Contractor
completing punch list items.
3105
WR
Plymouth Creek Pond
DA
Wenck
$900,000
Westwood has been hired to do the wetland
replacement plan, if necessary, as that was not a
-
part of Wenck's scope of work. The EAW has
been completed. The findings will be sent to
those that commented the week of April 21st.
The DNR will have wetland jurisdiction over
approx. 80% of the site, WCA for the rest. The
USACOE will also have wetland mitigation
requirements. Westwood is preparing the
wetland replacement plan application. There are
discussions with BARR Eng regarding a
feasability study for the Plymouth Creek stream
restoration project which may be able to be used
for part of the wetland replacement requirement.
Staff has a meeting with the Army Corps of
Engineers on July 29th to discuss wetland
mitigation. Staff will be meeting with
Westwood at the end of August or early
September to finalize the wetland replacement
plan application. Permit applications are
expected to be submitted to the Army Corps,
DNR, and Bassett Creek Watershed by the end
of September.
Page 1 C:\Documents and Settings\Ibaird\Local Settings\Temporary Internet Files\OLK18l Wclive_Pending_Proj_Rpt_082M Page 19
Revised: 8/28/08
City of Plymouth Engineering Department
Active and Pending Public Improvement Projects
Proj.
or CIP
Proj.
Proj.
Estimated
No.
Type
Project Description
Manager
Consult
Total Cost
Current Notes
4135
WR
CR 61/CR 9 Erosion Site
DC
BRA
$350,000
Options and estimated costs received 10/27/05.
Road 9. Meeting held 7/26/06 to discuss
downstream drainage issues with Three Rivers
Parks staff. Three Rivers prepared draft
agreement for review. The City has received
funding through BWSR. Agreement approved by
Council on 8/14/07. Final Plans & Specs
ordered. 1/1/08 wailing for plan review comments
from Three Rivers Park staff. Final plans
received by Council on March 25, 2008. Bid
opening held on April 29 at 10:00 am. Award bid
set for 5/13/08. Low bidder G.F. Jedlicki, Inc.
Preconstruction meeting set for 5/29- Contract
awarded to G.F.Jedlicki, Inc on 5/13.
Preconstruction meeting held on 5/29/08.
Clearing and grubbing of trees north of Co. Rd 9
along with installation of silt fence and orange
safety fencing. 95% of work including
restoration completed noth of Co. Rd 9 by
8/15/08.
4145
S
S. Shore Drive Bridge Replacement
JR
BRA
$350,000
Final plans have been approved by MnDOT.
Waiting to see when funding becomes available.
5102
S
CR 101, CR 6 to CR 24
DC/BM
Henn. Co.
$17,000,000
Preliminary layout of CR 101 approved by City
Council on 10/11/05. The plan is 30% complete.
Met with Hennepin County 4/4/06. City staff will
do engineering for watermain replacement. E4W
comments received and approved by County.
The plan is 90% complete. The County has sent
out property acquisition letter to affected property
owners. City working on watennain replacement
plan. Condemnation has been initiated by the
County. Current schedule anticipates receiving
Bids in May 2008 and starting construction in
August, 2008. City Council Orders Improvement
of Co. Road 101 on 2/26 and special
assessments become pending. County revises
schedule to a bid opening on 8/12/08 with
construction starting on 10/13/08. Xcel Energy
started relocating both its undergroung and
overhead lines the end of March. Some clearing
of trees was also necessary to facilitate thier
work. Environmental assessment public hearing
was held on 5/14/08 at Hennepin County Public
Works facility in Medina. County staff indicated
the project will be bid in December 2008 with
construction to begin April 2009.
Page 2 C:1Documents and Settings\lbaird\Local Settings\Temporary Internet Files\OLK181\Aclive_Pending_Proj_Rpt_082( Page 20
Revised: 8/28/08
City of Plymouth Engineering Department
Active and Pending Public Improvement Projects
Proj.
or CIP
Prot.
Prot.
Estimated
No.
Type
Project Description
Manager
Consult
Total Cost
Current Notes
5122
S
CR 24. Olive Ln. to 32nd Avenue
DC/BM
Henn. Co.
$2,500,000
Preliminary layout approved by City Council
6/14/05. Construction scheduled for 2008.
Design in progress. Received Draft Layout
2/21/06. Met with Hennepin County design staff
on 5/2/06. City staff will do design engineering
for watermain replacement. Met with utility
companies on 5/24/06. Received draft plan on
5/23/06. City watermain replacement plan
completed and submitted to the County. Project
has been put on indefinate hold by Hennepin
County.
6103
WR
Repair Erosion -Wood Crk.
DA/BM
Wenck
$425,000
Work began on February 6, 2008 and tree
clearing is completed. Creek reshaping began
during the first week of March. Erosion controls
have been placed across the creek, at the staging
area and entrance to lake. The project is
scheduled for full completion by June 15, 2008,
including late spring planting and restoration.
Rough grading and pipe work has begun in the
upper area, with the bulk of remaining grading
anticipated to start around April 21st, after the soil
dries out. Temporary erosion control has been
placed. The contractor has completed pipe work
and is working to complete the final grading at
which time restoration can begin. Final grading is
underway and restoration on the upper third is
completed. Grading, planting, and restoration is
completed. The contractor was sent a final punch
list last week. This project is substantially
complete. Survivability of plantings is largest
remaining issue.
6108
S
Intersection Imp. - CR 47 & CR 61
DC
$1.2 million
Curb and gutter is complete and base course
paving has been done. Intersection (including the
new turn lanes) is open for traffic for the winter.
Next spring the concrete islands will be installed,
the final lift paved and all restoration completed.
Median curbs are scheduled to be placed the
week of 5/26. All concrete work expected to be
completed by 6/20. Final paving and striping
completed 6/28/08.
6113
WR
Wickman Erosion Project
JR
$250,000
Contractor has performed all punchlist items.
7101
S
2007 Street Reconstruction Project - Hawthorne
I
JR
$3,620,000
Project is complete, with the exception of minor
Ponds Area.
punchlisl items.
7107
S
2007 Street Reconstruction Project - City View
JR
$4,245,000
Project is complete, with the exception of minor
Acres I
1
punchlist items.
Page 3 C:\Documents and Sehings\Ibaird\Local Settings\Temporary Internet Files\OLK181 Wdive_Pending_Proj_Rpt_08, Page 21
Revised: 8/28/08
City of Plymouth Engineering Department
Active and Pending Public Improvement Projects
Proj
or CIP
Proj.
Proj.
Estimated
No.
Type
Project Description
Manager
Consult
Total Cost
Current Notes
7111
WR
Mooney Lake Pump Project
DT/BM
Wenck
$250,000
Project was included in MCWD CIP for 2007_ A
cooperative agreement with MCWD has been
executed. Final park planting restoration work
was done and bike trail repair will be done by
Staff. Construction has been completed except
for some minor punchlist items by the contractor.
Rocks have been removed from Park grass.
Minor electrical corrections are required by
City Inspector.
7114
W
Well 16 and watermain
SN
BRA
$1,710,000
Wellhouse plans are going to Planning
Commission on 5!7/08. Watennain plans are 75%
done and in for comment. Wellhouse site plans to
be considered by City Council on 5/27. Well plans
are completed and construction bids will be
considered for approval by Council on 7/8/08.
7135
WR
Wild Wings Wetland Cleaning
DA
$175,000
Project proposes to excavate 2.88 acres of
channels to provide for water flow and flood
protection to area homes. Project is currently
being done in house. Have had several meetings
with DNR. EAW is expected to be published in
March. ECC reviewed the EAW on April 9th and
it is ready for publication. Public hearing on the
EAW will be held at the Planning Commission on
7/16/08. The public hearing on the EAW is
complete. Comments on the EAW were recieved
from the MN DNR, MPCA, and Metropolitan
Council. Several residents spoke in favor of the
project at the public hearing. Permit applications
are ready to be sent this week. Permit
applications have been submitted. Staff will
respond to comments in early September.
Staff anciticpates submitting a resolution
declaring no need for an EIS to the first
Council meeting in September.
7138
WR
TH 55 Culvert Replacement and Wetland
DA
S.E.H.
$485,000
Design is near completion and initial submittal to
Cleaning Proejct
MnDOT has been done. SEH will be reviewing
downstream effects of pipe size increase and
recommending channel cleaning parameters
downstream. Permits have been submitted to the
DNR and USACOE. A permit to the BCWMC is
required. 90% Plans have been submitted to
Mn/DOT for review. Rights of Entry have been
secured from the property owners on the north
side of TH 55. Cooperative agreement with
Mn/DOT to be considered by City Council on
5/27. Construction plans to be considered for
approval by City Council on 7/8/08.
Page 4 CiDocuments and Settings\Ibaird\Local Settings\Temporary Internet Files\OLK181V1ctive_Pending_Proj_Rpt_082f Page 22
Revised: 8/28/08
City of Plymouth Engineering Department
Active and Pending Public Improvement Projects
Pro]
or CIP
Proj.
Proj.
Estimated
No.
Type
Project Description
Manager
Consult
Total Cost
Current Notes. -
8101
S
2008 Street Reconstruction Project
JP
$8,100,000
All underground utility work on the project is
scheduled to be completed in the next two
weeks. Curb and pavement have been
installed on all streets west of Medicine Lake
Drive, with the exception of 26th Avenue. Sod
has been installed in phases 1 and 2 of the
project. The contractor is currently meeting
the proposed schedule submitted at the
beginning of the project.
8104
S
36th Avenue Street Reconstruction
JR
$550,000
Project delayed until 2009 due to Library and
rivate development construction.
8105
S
Hwy. 169 Frontage Road R/R Crossing
DC
$80,000
Council approves agreement with UP Rail on
Replacement
2/12/08. Construction expected to commence in
mid-September of 2008.
8106
S
2008 Temporary Overlay Project
JR
$370,000
Project has been completed by Northwest
Asphalt.
8107
WR
26th Avenue Bridge Replacement
JR
BRA
$250,000
Bridge Funds are not available this year. This
project will be delayed until next year, when
MnDOT funding is expected to be available.
8108
SS
28th Ave. Lift Station Upgrade
JR/SN
BRA
$600,000
Engineering Construction & Innovations, Inc. is
the low bidder. Forcemain installation has been
completed. Wet well construction to resume
on 8/27.
8109
S
Niagara Lane Mill & Overlay Project
DC
$600,000
Plans and specifications approved on 2/12/08.
Bid opening is March 20 at 10am. Lowest bidder
is ASTECH Corp. Contract awarded on 4/8/08.
Construction began 7/17/08. All concrete work
completed bv 8/22/08.
8110
S
Fire Station #1 Parking Lot Reconstruction
JR
$145,000
Council has approved plans and specs.
Project out to bid with a bid opening on
August 27.
8111
SS
2008 Sanitary Sewer Lining Project
JR
$373,000
Veit has completed the contruction and are
televising the lines.
8112
P
Old Rockford Road Trail
JR
$155,000
DMJ has completed the storm sewer, grading
and bituminous trail installation. Concrete
items and paving to completed during the
weeks f $125 and/2
8113
WR
2008 Minor Drainage Improvements
DT/DA
WSB
$200,000
These include 805 Ithaca, Cimarron Ponds,
Camelot Overlook, 305 Magnolia, 315 Alvarado,
12th/Harbor LN, 41st & Goldenrod and Chelsea
Woods. The 315 Alvarado site is ready to go and
the Camelot Overlook site has completed plans
andwatershed approval. Bids have been
received for the Zanzibar and Goldenrod
locations. A site meeting was held on August
14, 2008 with Chelsea Woods residents to
discuss design options. Council votes on
possible approval on August 26, 2008.
Page 5 C:\Documents and Settings\Ibaird\Local Settings\Temporary Internet Files\OLK181 Wctive_Pending_Proj_Rpt_08� Page 23
Revised: 8/28/08
City of Plymouth Engineering Department
Active and Pending Public Improvement Projects
Prot
or CIP
Pro.
Pro.
Estimated
No.
Type
Project Description
Manager
Consult
Total Cost
Current Notes
8115
WR
Timber Creek Improvements
JR/DA
$375,000
Proposals are currently under review by staff.
WSB has been selected as the design consultant.
A topographic survey of the area is underway. A
wetland delination will take place in early May. A
neighborhood meeing is anticipated in late May or
early June. Staff met with WSB regarding the
survey work. WSB suggested a meeting with
regulatory agencies prior to meeting with the
neighborhood to discuss any issues with different
project concepts. Wetland delineation is
complete. Staff met with WSB and Joe Yanta
from the USACOE. A neighborhood meeting is
scheduled for Monday June 16th at bpm in the
Council Chambers to hear neighborhood
concerns and review the wetland and survey
information. Staff had a second neighborhood
meeting on August 4th to review draft plans
with the residents. Staff will be on-site for the
3rd neighborhood meeting on August 27th to
discuss proposed tree removals with
residents. Permit applications have been
submitted to the Army Corps, MN DNR, and
Bassett Creek.
Pending PubllitUbtovement
Projects
W-2 W
Watermain - Vicksburg Ln. - CR 47 to Schmidt
$750,000
Dependent on development. A portion of the
Lake Road
water main is anticipated to be installed pending
approval of the Wood Crest development.
W-3 W
Watermain - Cheshire Ln. - Glacier Vista to CR
$370,000
Dependent on development. Construction is
47
anticipated be started in 2009.
BB
Bud Broekema
SS
Sanitary
BM
Bob Moberg
P
Parks
DC
Dan Campbell
W
Water
DT
Dave Taylor
WR
Water
JP
Joe Paumen
S
Street
JR
Jim Renneberg
SN
Scott Newberger
'
Unassigned
Page 6 C:\Documents and Settings\Ibaird\Local Settings\Temporary Internet Files\OLK181\Active_Pending_Proj_Rpl_OF Page 24
FIRE -RESCUE
SIX MONTH REPORT
JANUARY -JUNE 2008
During the first six months of 2008, the Department answered 647 calls for service (10.5% less calls than
the first six months of 2007 and 0.003% less calls than the same time period in 2006). During the first six
months of 2008, the highest call volume occurred between the hours of 3:00 p.m. and 6:00 p.m. The
busiest day of the week was Thursday. Sixty-three percent of calls for service were received between the
hours of 6:00 a.m. and 6:00 p.m. Seventy-five percent of all calls were "Duty Crew" calls.
Responses were divided between the fire stations as follows:
TOTAL CALLS
Generally, our call volume
gradually increases each year.
This chart shows this to be true
for the first six months of the
years as well. As the City
continues to develop, we can
expect a corresponding increase
in call volume.
300
250
200
150
100
50
0
1 2 3
STATION COMPARISON
■ Jan -June 2006
■ Jan -June 2007
O Jan -June 2006
This chart shows another look at
how the three stations compare in
numbers of calls. In the first six
months of 2008, 10.8% of these
calls were overlapping calls.
These calls are received prior to
clearing from one or more initial
calls.
Page 25
Jan -June 2006
Jan -June 2007
Jan -June 2008
Station I (13205 Co. Rd. 6)
225
224
211
Station 11 (12000 Old Rockford Rd.)
223
285
231
Station 111 (3300 Dunkirk Ln.)
201
214
205
649
723
647
TOTAL CALLS
Generally, our call volume
gradually increases each year.
This chart shows this to be true
for the first six months of the
years as well. As the City
continues to develop, we can
expect a corresponding increase
in call volume.
300
250
200
150
100
50
0
1 2 3
STATION COMPARISON
■ Jan -June 2006
■ Jan -June 2007
O Jan -June 2006
This chart shows another look at
how the three stations compare in
numbers of calls. In the first six
months of 2008, 10.8% of these
calls were overlapping calls.
These calls are received prior to
clearing from one or more initial
calls.
Page 25
CALLS BY TIME OF DAY
160 -- — --- ---- —
120 ----
■ Jan -June 2006
80 --- ❑ Jan -June 2007
i
40 ■ Jan -June 2008
I
0
0800- 0900- 400- 1500- 1800- 21D0- 0000- 0300-
0900 400 1500 1800 2D0 2400 0300 0600
Typically our calls follow a wave-like
pattern with calls increasing during the
day and then decreasing during the
evening and overnight hours. This
pattern has been consistent throughout
the years.
CALLS BY DAY OF WEEK
140
120
160 RIL
– Jan June 2006
40 – ❑ Jan. -June 2007
200 ® Jan -June 2008
ae6,81A 0 � aai 2A aaA as
y�o foo �JOe acme �r���
�e 5
This chart illustrates that call volumes are
generally consistent throughout the week,
but decrease slightly on the weekends.
2 Page 26
Incident Summary
The department responds to several different types of incidents throughout the year. The following
graphs provide further details on these incidents, and the amount of fire loss that occurs throughout the
first six months.
EVENTS BY CATEGORY
January - June 2008
Fres
False 13%
Alarms Relc EMs
35%10%Hazardous
Conditions
Good 11%
'O1 �15' Service
24% Calls
7%
This chart illustrates a breakdown of
call event types throughout the first six
months of the year. This is fairly
consistent from year to year. The
percentage of false alarms is relatively
steady throughout the years, despite the
growing number of alarm systems
installed in the City.
In -Service and Response Times
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
FIRE LOSS SUMMARY
Jan -June Jan -June Jan -June
2006 2007 2008
A positive correlation exists between
response time, staffing levels, and fire
loss. Fire growth research and
historical fire response statistics
indicate reduced property loss
associated with quicker response times
and adequate staffing levels. One or
two large loss fires can significantly
raise the property loss for the entire
year. hi the first half of 2008, there
were more structure fires reported with
less dollar loss than in the same time
period from 2007.
In-service and on -scene (total response) times for emergency events are as follows. Duty Crew and non -
Duty Crew times, as well as station responses, are noted.
In-service times reflect the time from dispatch to the time the first suppression apparatus goes into
service. Increased traffic congestion, additional traffic control devices and an increased emphasis upon
firefighter safety contribute to longer in-service times. In-service times are one component when
measuring the total response time to an event.
M
Page 27
Jan -June 2006
Jan -June 2007
Jan -June 2008
DC
In -Svc
Onscene
In -Svc
Onscene
In -Svc
Onscene
1:22
6:50
1:12
6:42
1:16
6:54
Non -DC
6:40
10:44
5:51
10:00
7:16
11:28
Sta.1
7:25
10:48
6:28
9:27
7:41
11:42
Sta.II
6:15
10:55
6:04
10:34
6:45
10:45
Sta.111
6:00
10:07
3:54
8:35
7:41
12:46
In-service times reflect the time from dispatch to the time the first suppression apparatus goes into
service. Increased traffic congestion, additional traffic control devices and an increased emphasis upon
firefighter safety contribute to longer in-service times. In-service times are one component when
measuring the total response time to an event.
M
Page 27
The times in the previous table measure how the City is protected during the Duty Crew hours of
operation versus non -Duty Crew hours of operation. During the Duty Crew hours of operation, both in-
service and total response times tend to be increasing. This is due to concurrent calls requiring call-backs
when other firefighters from our department or mutual aid companies assist the Duty Crew, traffic
congestion, and staffing only one fire station.
RESPONSE TIME FOR EMERGENCY
CALLS
14:24 — -
10:44 10:0 11:28
9:36 6:5o ■ Jan -June 2006
s:az s:sa
� Jan -June 2007
4:48 A I ®Jan -June 2008
0:00
DC Non -DC
Response times for emergency calls
during both Duty Crew and non -Duty
Crew times have increased. This can
be attributed to longer in-service times,
and may be due, in part, to traffic
congestion and additional traffic
control devices slowing firefighter
response to the stations. Response
times may be lowered by staffing more
than one station.
76 -- — -
74
72 ' ■ # of Firefighters
70 Left the Dept.
68 1 ■ Firefighter Staffing
66 Lelels
64 l
Jan. - Jan. - Jan. -
June 2006 June 2007 June 2008
At the end of the reporting period, the
total staffing level for paid -on call
firefighters are indicated in the blue
section of the chart above with the
maroon section reflecting how many
POC firefighters left the department
during the first six months of each year.
In 2008, the Department initiated
several new marketing strategies
focusing upon the recruitment and
retention of paid -on-call firefighters.
4
Page 28
Firefighter Time Commitment
Paid -on-call firefighters worked a total of over 16,542 hours in the first six months of 2008, which is a
0.9% increase from the same time period in 2007.
During the fust six months of 2008, forty-two regularly scheduled in-house training sessions were
offered. Additional training opportunities were offered during Rookie Training and Duty Crew. The total
number of hours spent on in-house and outside training activities was 4293.5, which is a 5.9% increase
from 2007.
Duty Crew Proms
The Duty Crew Program was in operation Monday thru Saturday during the first six months of 2008.
Fifty-four members participated in the program. The program continues to be popular among the paid -
on -call firefighters. Over the last six months, more than 77% of department members have chosen to
participate in the program. During the first six months of the year, 98% of all shifts were fully staffed
with 4 or more firefighters. During our busiest time period (3:00 p.m. to 6:00 p.m.), 98% of the shifts
were fully staffed.
CALLS FOR SERVICE
January -June 2008
Non -Duty
Grew •••
25% ♦iiii�
i
%' Dub
Clew
75%
This chart shows that we consistently
receive most calls for service during
Duty Crew times. This has historically
held true for the past nine years. The
Duty Crew program was in operation
six days a week (Monday thru
Saturday) from 6:00 a.m. to 9:00 p.m.
during the first six months of 2008.
DUTY CREW STAFFING
January - June 2008
3
Firerighters 5
0 1.5% Firefghtem
FirerWers 20%
0.5%
4
Firefl*ers
98%
The Fire Department considers a fully
staffed truck to be at least four
firefighters. Fourteen shifts for the first
six months were understaffed, with
eight shifts cancelled due to inadequate
staffing. Under -staffed shifts result in
reduced crew integrity and efficiency.
Crews also operate at a greater risk of
injury when under -staffed.
Page 29
Yy�YMOUTB
FIRE-RESCIIE
Plymouth Fire Department
Prevention and Life Safety Education Report
January — June 2008
• 158 Car Seat Checks Provided
• 127 Car Seats Sold
• 404 Bike Helmets Sold
Tvpe of Program
Number of Proarams
Proeram Hours
Station Tours
13
13
Bookmobile(Literac
Pre-school Visits
17
17
K-6 Education Events
7
7
Career Talks
Bike Helmet Sales
11
41
Car Seat Check-ups
158
158
Assist North Memorial
Smokebusters,
Seniors and families
30
31
Adopt A Hydrant Program Visits
16
21
Block Parties
1
1
Parades
National Night Out Programs
2
5
Fire Department Open Houses
Fire Extinguisher Training Sessions
3
3
Business Safety Fairs
2
6
Business Fire Drills
3
3
Public Education Training Sessions
2
4.5
Public Education Meetings
11
17
Literature Drops
1
3
Diversity Outreach Programs
2
4
Misc. Programming
5
10
Special Projects
7
14
Jan. -June 2008 Totals
291
358.5
Average 1.2 Hour
Per Program
Page 30
FIRE -RESCUE
PLYMOUTH FIRE
DEPARTMENT
3400 Plymouth Boulevard
Plymouth, Minnesota 55447
763-509-5120
FIRE -RESCUE INCIDENT OF INTEREST
DATE: 08/23/2008 TIME: 3:16 p.m. ADDRESS: 4940 Underwood La.
DETAILS: Duty Crew Engine 21 (Luth, Blake, Couser, Duncan) were dispatched to a water flow
alarm. Upon arrival, the assignment was upgraded to a General Alarm when the crew discovered
a kitchen fire.
The fire in the kitchen was contained to the stove and cabinets by the discharge of one (1) fire
sprinkler. Without the fire sprinkler system, this fire would have extended into the living areas of
the unit.
Fire department personnel provided overhaul and salvage for the affected unit.
The fire was placed under control eight (8) minutes following fire department arrival. There were
no civilian or firefighter injuries.
RESPONSE TIME: Five (5) minutes. This call occurred during the staffed station (Duty
Crew) program hours of operation.
FIRE ORIGIN/CAUSE: Under Investigation.
ESTIMATED FIRE LOSS: $20,000.
P.F.D. RESPONDING UNITS:
Engine Companies: E-21
Ladder Companies: TW -11,A-21
Support Units:
Rescue Companies:
Chief Officers: C-31, C-21
Mutual Aid:
ASSISTING AGENCIES:
EMS: Yes
Red Cross: No
Salvation Army: No
Public Works: No
State FM: No
Henn. Fire Invest. Team: No
SECTOR OFFICERS: Command (District Chief Blake), Interior Division (District
Chief Luth).
Page 31
August 19, 2008
Dear Employer:
Thank you for participating in the 2008 Commuter Challenge! You join over 300 Twin
City employers who encouraged their workforce to try an alternative to driving alone.
This year's campaign was the most successful yet with nearly 15,000 people pledging to
carpool, take transit, telework, vanpool, ride their bike, or walk to work.
With the high price of gasoline many commuters are indicating they are struggling to
afford their commute. We applaud you for assisting your employees by connecting them
to our resources. By helping your employees understand their commute options you are
providing a valuable benefit. We hear from commuters on a regular basis how much they
appreciate when their employer provides resources and incentives for their commute to
work.
From a follow up survey conducted after the Commuter Challenge, 45% of people who
drive alone to work who tried an alternative during the Commuter Challenge now use
their alternative 1-2 days per week 38% of people who drive alone to work who tried an
alternative during the Commuter Challenge now use their alternative 3 or more days per
week.
We also want to let you know about an upcoming campaign this fall: Rideshare to Work
Week happening October 6-10. Similar to the Commuter Challenge, your employees can
win cool prizes including an iPhone for carpooling or vanpooling to work.
We will be scheduling on-site Commuter Fairs for late August and September so please
let us know if you would like a commuter fair, or if you would like posters or an
electronic flier to promote Rideshare to Work Week.
Again, thank you for contributing to the great success of this year's Commuter
Challenge. Your efforts have a positive impact on your workforce and our shared
communities.
Sincerely,
494 Commuter Services
Melissa Madison
kAktW4,141`0,
Kate Meredith
5701 Normandale Road, Suite 322, Edina, MN 55424 • 952-848-4947 0 Fax: 952-848-4904 0 www.494c Page 32
Laurie Ahrens
From: johnsoncabling@frontiernet.net
Sent: Friday, August 22, 2008 12:10 PM
To: Laurie Ahrens
Subject: Russ Hinze 1545 Evergreen Lane
From: Wynn Johnson
To: Laurie Ahrens
City Manager of Plymouth
A heartfelt thanks from the citizens of the Elmhurst Gateway Subdivision for
your attention to the matter of Russ Hinze 1545 Evergreen Lane. I
would like to share with you that on August 15th just two weeks ago,
one of our neighbors passed away. The Plymouth police were at the home
to give support, advice, and understanding.
Afterwards one of the officers spoke with us in the course of
conversation someone mentioned that Plymouth was the #1 city to live
in the country. To which the officer replied that's what makes a good
community is it's citizens. She was right, however, there are lots of
other amenities that we enjoy in Plymouth; utilities such as good
schools, parks, police and fire, and last but certainly not least,
good city government. Please feel free to contact me if ever the city
needs help with a project.
1
Page 33
Page 1 of 1
Laurie Ahrens
From:
Laurie Ahrens
Sent:
Thursday, July 31, 2008 5:26 PM
To:
'wynn1535@gmail.com'
Cc:
Kelli Slavik
Subject: 1545 Evergreen Lane
Dear Mr. Johnson and Elmhurst Gateway Subdivision Residents,
Mayor Slavik forwarded your memo and petition to me for response. Thank you for providing the related
documents. There is no current enforcement action relating to 1545 Evergreen Lane. It is true that Mr. Hinze was
asked to remove the aggregate driveway which was located on public park property on July 11. He did so, and
that closed the issue. The Park Department has not objected to Mr. Hinze using this segment of trail for limited
access to his property in the past, similar to many other locations in the community, as long as the privilege is not
abused (damaging the trail, creating a dangerous situation, or changing the nature of the park or trail, etc.) Once
the aggregate drive was removed and the grade restored, the issue was resolved. If you have any additional
questions, please let me know. Thanks again for writing. Laurie Ahrens, Plymouth City Manager
8/22/2008 Page 34
Education Services Center John W. Schultz, Ph.D.
1001 Highway 7 Superintendent
9Hopkins, MN
52.988. 000 55305-4723 H O P K I N S 952.988.4021
fax: 952.986.4092
hopkinsA 12.mn.us PUBLIC SCFi00L5 john_Schula@hopkins.k 12.mn.us
Committed to Equity & Excellence
August 27, 2008
The Honorable Kelli Slavik
City of Plymouth
3400 Plymouth Boulevard
Plymouth, Minnesota 55447
Dear Mayor Slavik,
Congratulations on earning the prestigious honor of being named Motley Magazine's "Best
Place to Live." This honor is a credit to the City of Plymouth's leadership and its commitment
to ensuring that all residents enjoy a high quality of life.
The Hopkins School District has always been proud of the richness of the communities that it
serves, including the City of Plymouth. We routinely state that our District serves all or parts
of seven different communities, and enjoy the diversity that brings. The Hopkins School
District is committed to excellence, at every school, for every student, every day. The
foundation for our excellence is laid by our staff, students, their families, and our
communities.
Our Plymouth residents support the Hopkins Public Schools in many different Hays — being
strong advocates for the education of their children, working with us to ensure that their
students receive the best education possible, and being active volunteers in our schools.
The City of Plymouth is an important part of our District. Your being recognized in this
capacity makes us proud of all that Plymouth offers its residents, including the families whose
children attend Hopkins' schools. It is our privilege to be one of the school districts that
serves Plymouth.
Again, congratulations!
Sincerely,
John W. Schultz, Ph.D.
Superintendent
Serving the communities of: Eden Prairie - Edina Golden Valley Hopkins - Minnetonka - Plymouth St. Louis Party Page 35
An eaual obbortunitv/affirmative action educator and emblover.
Minnesota Pollution Control Agency
520 Lafayette Road North I St. Paul, MN 55155-4194 1 651-296-6300 1 1-800-657-3864 1 651-282-5332 TTY I www.pca.state.mn.us
August 1, 2008
Mr. Ted Hoshal
236 Peninsula Road
Medicine Lake, MN 55441
RE: The City of Plymouth's Response to Ted Hoshal's Comment Letter Regarding the
Stormwater Pollution Prevention Program for the City of Plymouth
Dear Mr. Hoshal:
The Minnesota Pollution Control Agency (MPCA) has received a response from the city of
Plymouth (City) dated July 27, 2008, that addresses your concerns, with their Stormwater
Pollution Prevention Program (S WPPP), which were sent to them in your comment letter dated
July 3, 2008.
The city of Plymouth, in the second paragraph of their letter, points out that "The SWPPP (or
Permit) in general does not specifically address a requirement of cities to evaluate groundwater
contamination risk from non -point source mitigation structures like stormwater detention and
retention ponds". The City is correct on this point in question; the MS4 Phase II Municipal
Stormwater Permit does not address groundwater contamination.
The three (3) -celled wet detention pond being constructed in wetlands along the shoreline of
Medicine Lake has a separation of 0-3 feet from the pond's surface to the groundwater table. It
appears these wetlands have been there for a period of time and they are growing out of fill
material brought in to fill depressions. Most likely this fill was some type of clay that is very
tight and not many pollutants will be able to migrate down through them.
There have been only a handful of cases where wet detention ponds were discovered as the
source of groundwater contamination and all of these drain areas we refer to as "hotspots" such
as gas stations and other areas where chemicals are being used that might spill and stormwater
could carry the chemicals to wet detention ponds.
The positive side of this project is that it will keep approximately 350 pounds of total phosphorus
out of Medicine Lake annually. Medicine Lake is currently is listed as impaired for nutrients.
To help address your concerns about the private drinking water wells in Medicine Lake I would
suggest that you contact the Well Management Section of the Minnesota Department of Health
in St. Paul. They can be reached at wells@health.state.mn.us or at 651-201-4600.
I realize this letter does not satisfy your concerns, but the city of Plymouth has done all they are
bound by statute, rule and permit requirements to do. As an environmental Agency the MPCA
St. Paul I Brainerd I Detroit Lakes I Duluth I Mankato I Marshall I Rochester I Willmar I Printed on 100% post -consumer recycled paper
Page 36
Mr. Ted Hoshal
Page 2
August 1, 2008
does not have the jurisdiction to impose hydrological studies in a case such as the West Medicine
Lake Park, Stormwater Retention/Water Quality Improvement Ponds.
If I can be of further assistance please free to contact me at 651-296-6945.
Sincerely,
Keith L. Cherryholmes, PhD
Senior Engineering Specialist
Stormwater Management Unit
Municipal Division
cc: Derek Asche, Water Resource Manager
Doran Cote, Director of Public Works
Robert Moberg, City Engineer
Dale Thompson, Supervisor, Stormwater Management Unit, MPCA
Page 37