Loading...
HomeMy WebLinkAboutCity Council Resolution 2021-039 C ITY OF P LYMOUTH R ESOLUTION N O. 2021-039 R ESOLUTION A PPROVING A SSIGNMENT OF C ONSTRUCTION C ONTRACTS TO RJM C ONSTRUCTION FOR THE F IRE S TATION 2 AND 3 C ONSTRUCTION AND R ENOVATION P ROJECT (FM210014.001 AND FM210014.002) WHEREAS, City and Contractor (RJM) have entered into that certain Standard Form of Agreement between Owner and Construction Manager dated the June 9, 2020 (“Contract”), whereby Contractor undertakes the construction management of project known as the Fire Station 2 and 3 Construction and Renovation Project (“Project”); and WHEREAS, at its December 8, 2020 meeting the City Council authorized advertisement of bids and quotes. The project was advertised from December 8, 2020 through January 14, 2021, and bids were publicly opened on January 14, 2021; and WHEREAS, the Project bid documents included the proposed contract for the Work (as defined in the Contract); and WHEREAS, the Contract requires that the City assign to RJM all of City’s rights in and to contracts for the construction of the Work (as defined in the Contract) which have been competitively bid and awarded by the City; and WHEREAS, in consideration of the mutual promise and agreements made in the Contract and other good and valuable consideration the receipt and sufficiency of which is acknowledged: 1. City hereby grants, transfers and assigns to RJM all of its right, title and interest in and to the contracts identified below as included in the bid documents. 2. The RJM hereby consents to and accepts this Assignment and agrees to perform all of its obligations under the Contract for the benefit of the City. RJM will enter into the contracts in the same form included in the bid Documents with the contractors awarded the bids, quotes and alternates by the City. 3. This Assignment shall be binding upon and inure to the benefit of the City and RJM and their respective heirs, successors and assigns, as the case may be. 4. This Assignment may be signed in more than one counterpart, together which shall constitute an original document. BIDS: Bid Category Company Amount 1A Structure Demolition Veit and Company, Inc. $70,230 1B Selective Demolition George F Cook Construction Company $149,500 2A Concrete & Masonry Systems Steenberg-Watrud Construction, LLC $2,902,126 3A Precast Molin Concrete Products $124,949 5A Structural Steel Materials Camelot Metals Combined Bid 5B Structural Steel Labor River City Erectors, Inc. Combined Bid 5C Metal Fabrications Camelot Metals $557,660 5D Metal Fabrications Labor River City Erectors, Inc. $329,500 6B Interior Arch. Woodwork & Finish Northern Woodwork, Inc. $290,275 Carp. 6C Interior Arch. Woodwork labor Kellington Construction, Inc. $111,120 7A Air & Vapor Barrier/ Insulation Greener World Solutions, LLC. $154,300 7B Metal Panels & Metal Roofing Specialty Systems, Inc. $478,700 7D Roofing Systems Lake Area Roofing and Construction, Inc. $624,783 8A Doors, Frames, Hardware Material Kendell Door and Hardware, Inc $266,313 8B Doors, Frames, Hardware Labor Kellington Construction, Inc. $91,740 8C Storefront & Glazing MT Contracting Inc. $352,444 8D Overhead Doors Yale Mechanical LLC $140,000 9A Drywall RTL Construction $624,330 9B Tile Acoustics Associates, Inc. $249,900 9C Acoustical Ceilings Kirk Acoustics, Inc. $99,200 9D Carpet Sonus Interiors, Inc. $144,900 9E Paint & Wallcovering Superior Painting and Decorating $187,400 14A Elevator Schumacher Elevator Company $208,454 21A Fire Protection Systems Lifesaver Fire Protection $148,300 22A Plumbing Systems Modern Piping, Inc. $3,310,000 23A HVAC Systems Modern Piping, Inc. Combined 25A Building Automation Egan Company $285,900 26A Electrical Systems Choice Electric, Inc. $1,815,000 31A Earthwork Park Construction Company $515,320 32A Asphalt Paving Northland Paving $231,500 32B Site Concrete Ultra Concrete $300,000 32C Landscape/Irrigation Precision Landscaping, Inc. $119,150 32D Retaining Walls Precision Hardscapes, Inc. $213,751 33A Utilities US Sitework, Inc. $279,790 Quote Category Company Amount 1C Surveying Sunde Land Surveying $38,020 1D Final Cleaning A Clean Look $30,242 1F Building Envelope Consultant-Review Only Morrison Hershfield $30,750 7C Waterproofing Allowance $78,175 7E Applied Fireproofing ANI-Midwest Fireproofing & $40,000 Insulation 7F Joint Sealants Right-Way Caulking, Inc. $19,100 9F Fluid Applied Flooring Concrete Specialties Midwest, Inc $64,801 10A Specialties, Toilet Partitions, Accessories Bartley Sales Company, Inc. $48,557 10B Fire Extinguisher and Cabinets Building Material Supply, Inc. $3,882 10C Lockers Building Material Supply, Inc. $24,075 10D Flagpoles Countryside Flagpole $11,096 10E Site and Building Signage Signart $69,579 11A Food Services Equipment Custom Stainless Steel, Inc. $34,817 12A Window Treatments American Drapery Systems, Inc. $31,720 28A Fire Alarm Siemens Industry, Inc. $48,343 28B Fiber Optic Utilities Castrejon Inc. $28,935 32E Fences and Gates Peterson Companies $44,470 WHEREAS, there were two alternates for the project as determined by the project team (CNH, RJM and staff). The project team DOES NOT recommend two alternates at a cost of $203,938:  Alternate No. 1 – Add to provide Four-Fold doors in lieu of base bid Sectional doors OH105D, OH105E, and OH105F in Fire Station #2. ($109,490 value)  Alternate No. 2 – Add to provide Calcium Silicate Masonry Units at all indicated field locations at Fire Station #2 and Fire Station #3 in lieu of base brick-02. Calcium Silicate banding is base bid for both stations, see Exterior Elevations. ($94,448 value) NOW, THEREFORE BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA, that the assignment of construction contracts for bids, quotes and zero alternates to RJM Construction for the Fire Station 2 and 3 Construction and Renovation Project in the amount of $19,218,492 is approved. APPROVED by the City Council on this 26th day of January, 2021.