Loading...
HomeMy WebLinkAboutCity Council Resolution 2020-057 C ITY OF P LYMOUTH R ESOLUTION N O. 2020-057 R ESOLUTION R ECEIVING P RELIMINARY E NGINEERING R EPORT, O RDERING P REPARATION OF P LANS AND S PECIFICATIONS, AND C ALLING FOR A P UBLIC H EARING FOR THE 2020 S TREET R ECONSTRUCTION P ROJECT (ST209001) WHEREAS, pursuant to a resolution of the City Council adopted February 11, 2020, a report has been prepared with reference to the recommended project area including 15th Avenue from Rosewood Lane to the Highway 55 Frontage Road, Pineview Lane from a point 180 feet north of 13th Avenue to 15th Avenue, Oakview Lane from 15th Avenue to 11th Avenue, 12th Avenue from Oakview Lane to Kirkwood Lane, 11th Avenue from Pineview Lane to Magnolia Lane, Magnolia Lane from 11th Avenue to 12th Avenue, Kirkwood Lane from the Highway 55 Frontage Road to Magnolia Lane, Highway 55 Frontage Road from 15th Avenue to Cottonwood Lane, Ives Lane south of the Highway 55 Frontage Road, Forestview Lane south of the Highway 55 Frontage Road, Cottonwood Lane south of the Highway 55 Frontage Road, 32nd Avenue from East Medicine Lake Boulevard to a point 205 feet east of Saratoga Lane, Saratoga Lane from 32nd Avenue to a point 150 feet south, Union Terrace south of 32nd Avenue, East Medicine Lake Boulevard from the driveway entrance to 3110 East Medicine Lake Boulevard to Medicine Ridge Road, 30th Avenue east of East Medicine Lake Boulevard, 24th Avenue from Lancaster Lane to Kilmer Lane, 17th Avenue west of Kilmer Lane, and Nathan Lane south of 10th Avenue; and WHEREAS, the proposed improvement includes reconstruction of streets, installation of concrete curb and gutter, water main, and storm sewer, repairs to the sanitary sewer, and all necessary appurtenances; and WHEREAS, said report is being received by the Council on February 11, 2020; and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvements as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF PLYMOUTH, MINNESOTA: 1. The Council will consider the improvement of such streets in accordance with the report and the assessment of abutting and adjacent property within the designated 2020 Street Reconstruction Project, City Project No. ST209001, for all or a portion of the cost of the improvement pursuant to Minnesota Statutes 429.011 to 429.111 (Laws 1953, Chapter 398, as amended) at an estimated total cost of the improvement of $12,708,800. 2. A public hearing shall be held on such proposed improvement on the 14th day of April, 2020, in the Council Chambers of the Plymouth City Center at 3400 Plymouth Boulevard at 7:00 p.m., and the Clerk shall give mailed and published notice of such hearing and improvements as required by law. 3. WSB is designated as engineer for the improvement. They shall prepare plans and specifications for the making of such improvement. APPROVED by the City Council on this 11th day of February, 2020.