Loading...
HomeMy WebLinkAboutCity Council Packet 09-11-2012 SpecialCITY OF PLYMOUTH AGENDA SPECIAL COUNCIL MEETING SEPTEMBER 11, 2012) 5:30 p.m. MEDICINE LAKE CONFERENCE ROOM 1. CALL TO ORDER 2. TOPICS A. Major Street Funding Options B. NW Area Infrastructure Funding C. Set Future Study Sessions 3. ADJOURN Special Council Meeting 1 of 1 September 11, 2012 rp) City of Plymouth Adding Quality to Life SPECIAL COUNCIL MEETING September 11, 2012 1. OVERVIEW: Agenda 2ANumber: To: Laurie Ahrens, City Manager Prepared by: Dave Callister, Administrative Services Director Item: Major Street Funding Options In addition to the City's Street Reconstruction Program, there are two major street projects that have been identified in the City's Capital Improvement Program (CIP) to be undertaken in the next few years. The projects include: Peony Lane Project - estimated cost of $11.3 million Vicksburg Lane Project - estimated cost of $19.4 million In order to determine the financial feasibility of when the projects are undertaken, it is important to first review all potential sources of funding. 2. FINANCING OPTIONS: Potential financing sources include: Municipal State Aid (MSA) Current MSA rules allow MSA cities to request advancements of up to the lesser of $4 million dollars or five (5) times their annual allotment to fund construction of state aid roadways. The advancement would be repaid by the City's future allocation of state aid funds. The City's current rate of allocation is approximately $2 million annually. Federal Funding Special Assessments- the report assumes that a residential property would be assessed based on a 32 foot wide roadway. Bonds — issued for a 15 year term at 3% Area Charges (See below) Franchise Fees (See attachment) Utility Trunk Fund Page 1 3. PROJECTS: Peony Lane The funding for Peony Lane is currently not designated in the Capital Improvement Program. Although the exact funding source is unknown it will likely come from a variety of sources. A funding mix of special assessments and MSA funds is assumed to finance the street improvements. Area Charges Another option for funding a portion of the Peony Lane street improvements that the City Council may wish to consider is establishing, by ordinance, a development fee similar to Park Dedication that would be dedicated to fund Peony Lane. This fee would only apply to developing properties in the Northwest Area. Two methods were analyzed by city staff to determine the most appropriate means by which to establish the fee. The first method analyzed was determining the trips that are expected to be generated by the development of the property in the Northwest Area in the vicinity of Peony Lane using population and employment data from the City's Land Use Plan element of the 2030 Comprehensive Plan. The number of trips generated utilizing this method was 17,585 additional trips from 2005 data to projections in 2030. The second method analyzed was determining the trips expected to be distributed onto the roadway system by development of the property in the Northwest Area in the vicinity of Peony Lane using the City's Transportation Plan element of the 2030 Comprehensive Plan. The number of trips generated utilizing this method was 17,510 additional trips from 2005 data to projections in 2030. Since the two methods yielded very similar results in terms of expected traffic volumes generated by development of the Northwest Area, the Transportation Plan Element method was utilized to establish the percentage of trips on Peony Lane generated by development of the Northwest Area. This percentage was then used to calculate a fee based and equivalent percentage of the cost divided into the potential number of units to be developed, which was extracted from the net area of land in the Northwest Area of 1,104.09 net acres. The assessment per unit was calculated as follows: Total Construction Cost (less R/W) $8,991,400 Attributable to Development (49%) 4,405,786 Northwest Area Size (Net Acres) 1,104.09 Cost Per Acre $3,991 Assuming an average of four units per acre within the study area equates to a cost per unit of roughly $1,000 per unit. There is an expected increase in the number of households in the Northwest Area from 2005 to 2030 of 1,813 households. The total assessed would be 1,813,000 or a total of 20% of the construction cost. Vicksburg Lane Currently the CIP outlines funding sources for Vicksburg Lane as federal funding and MSA. Although not identified currently, special assessments may be considered for a portion of the funding needs but they may not significant. Page 2 4. IMPACT OF G.O. BONDS: Peony Lane Estimated Project Cost $11,300,000 Less MSA 825,000 Net local share $10,175,000 G.O. Bonds (15 years @ 3%) Annual Principal & Interest $ 852,325 Increase in city levy due to Peony Bonds = 2.9% Vicksburg Lane Since federal funding for Vicksburg Lane is far from certain we have not assumed that any will be available for this project. In addition, MSA funds may be available if not used for Peony Lane or other projects so we have not included MSA in the tax impacts. Estimated Project Cost $19,400,000 Less Other Revenue 0 Net local share $19,400,000 G.O. Bonds (15 years @ 3%) Annual Principal & Interest $ 1,706,325 Increase in city levy due to Vicksburg Bonds = 5.8% The MSA funding allocated to the Peony Lane project represents approximately three years of our total annual funding which means that there would be no MSA available for other projects during this time. It is likely that both bonds would not be issued at the same time. In addition, the City is anticipating the issuance of G.O. Open Space Bonds in 2013/2014 which will add annual debt payments of approximately $290,000, a .32% tax levy increase. The following is a summary of future tax impacts for bonded debt as outlined above. Levy increase is calculated from 2013 preliminary levy. Page 3 Annual Impact Total Annual Total Project 300,000 Home Debt Levy Levy Increase Peony 27.40 852,325 2.9% Vicksburg 54.85 1,706,325 5.8% Open Space 9.32 290,000 1.0% Total 92 2,848,650 9.7% Levy increase is calculated from 2013 preliminary levy. Page 3 Franchise Fees Minnesota law authorizes municipalities to impose franchise fees for utilities that use the public right-of-way or other public property. The fees may be collected to defray the costs to the city of the utility company's use of the right-of-way or may be used for general revenue purposes. Fees are then charged to all utility customers regardless of the type or use of property. Churches, schools and other tax exempt properties would pay franchise fees. The franchise fees are billed by the provider directly to the customer and itemized on their bill as a city fee. The utility then collects the fees and passes the revenue on to the city. For simplicity and funding stability, most cities have a flat fee per meter but others charge a fee based on a percentage of the total bill. Funds may be designated for a specific purpose or can be used as a general revenue. City of Minnetonka — In 2005, adopted electric franchise fee only. In 2007, fee was increased to $2.50 per month per residential connection. Annual revenue of $800,000 dedicated to burial of overhead utility lines and above ground decorative lighting. City of St. Louis Park — Currently has both electric and gas franchise fees and charges $2 each per month per residential connection. Annual revenue of $910,000 is dedicated to street rehabilitation (Pavement Management Fund). City of Eden Prairie — Adopted franchise fees for gas and electric in June of 2012 at $2.50 each per month per residential connection. Annual revenue of $2 million will be used for long term street maintenance. City of Edina — On August 6, 2012, the Council unanimously approved the first reading of the ordinance implementing gas and electric franchise fees at $1.45 each or a total of $2.90 per month per residential connection. If adopted, the annual revenue is estimated at $1.1 million will be used to fund new improvements such as sidewalks, trails and non -motorized transportation prof ects. City of Golden Valley — Implemented electric franchise fee at $2 per month per residential connection. Annual revenue of $600,000 dedicated for Douglas Drive improvements undergrounding). City of Hopkins — Electric and gas franchise fees at $1.70 per month each per residential connection. Annual revenue of $490,000 used to offset the loss in state aid programs. City of Plymouth — Currently no franchise fees. If monthly fees were adopted at $2 per utility per residential connection, it would generate an estimated $1.32 million annually. All of the cities included above have higher rates for commercial users based on the type of user such as: 1) small commercial with non -demand 2) small commercial/industrial with demand 3) large commercial/industrial user Page 4 City of Ptymouth Feasibility Report Northwest Area Trunk Study June 29, 2012 I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Rep,istration No. 41613 Lee W. Elfering QUE HOM Table of Contents 1. Introduction..........................................................................................................................1 II. Existing Conditions..............................................................................................................1 III. Proposed Improvements.......................................................................................................2 IV. Phasing.................................................................................................................................8 V. Estimated Costs..................................................................................................................10 VI. Financing............................................................................................................................13 VII. Summary............................................................................................................................17 APPENDIX A — Exhibits APPENDIX B — Plan and Profile Sheets APPENDIX C — Watermain Modeling Results APPENDIX D — Utility Construction Cost Estimates APPENDIX E — Transportation Development Fee (Peony Lane) Contributing Documentation Intrnrli irtinn The Northwest Area of the City remains the largest area of principally undeveloped residential guided land. The majority of the anticipated housing growth in the coming years will occur in this corner of Plymouth. This study was undertaken to determine what properties within the area currently have access to trunk sanitary sewer, watermain, and paved streets within an acceptable distance and what extensions are necessary to provide City infrastructure in an appropriately phased manner to the remainder of the area. The study area boundary is shown on the attached exhibits, but in general consists of the area west of Dunkirk Lane and north of the railroad tracks to the City boundary. The area is 1,390 acres in size. The study looks at the means to provide infrastructure in a staged and cost effective manner to this area that balances development with preserving natural features and open space. Service is deemed provided if it is located within '/a mile of a parcel. Existing Conditions Street Network The existing street network and the parcels currently served with a paved street are shown on Exhibit 1. The Northwest Area is currently served with a B -Minor Arterial (County Road 47) on the north side, an A -Minor Arterial (County Road 101) on the west border and an A -Minor Arterial (Peony Lane) in the south portion of the area. Local and private roads provide access to properties within the area. Dunkirk Lane is a gravel road with sections that are proposed to be paved with future development on the south and north ends of the roadway. The study area has significant topographic relief and numerous wetlands that require more analysis for street extensions than flat areas. There are also numerous City owned parcels within the study area that are part of the proposed Northwest Greenway. Trunk Sanitary Sewer The extension of the Elm Creek Interceptor by Metropolitan Council Environmental Services has provided sewer access to the Northwest Area in general. The location of the Elm Creek Interceptor is shown on Exhibit 2. The design of the interceptor provides for multiple points of 1 connection for the sub -districts within the area. Exhibit 2 shades properties that currently have access to sanitary sewer within 1/4 of a mile from their property border. A majority of access is achieved through proximity to the Elm Creek Interceptor. There is also lateral sanitary sewer that borders the study area on the southeast side that provides service. Wayzata High School is served by a sanitary sewer that runs parallel with Peony Lane. In addition, the properties on the south end of Dunkirk Lane are also shaded as having access on Exhibit 2 through a lateral sanitary sewer that was extended to the edge of the Timber Creek Crossing Addition. Trunk Watermain The location of existing watermain is isolated to the south and east portions of the study area. Service to properties shaded on Exhibit 3 is possible from watermain stubs from the Timber Creek Crossing Addition, Harvest Hills, and Steeple Hill plats. Wayzata High School is served by watermain that is stubbed on Peony Lane north of Schmidt Lake Road. Proposed Improvements Street Network In order to provide adequate paved street access to the properties within the study area the following street improvements and extensions were reviewed and are shaded on Exhibit 4: 1. Peony Lane/Lawndale Lane — From just south of 54th Avenue to Lawndale Lane in Maple Grove 2. 54th Avenue — From Peony Lane to County Road 101 3. Dunkirk Lane — The section outside of the proposed development as shaded 4. East/west Route — From Dunkirk Lane to Peony Lane. This route is labeled as 58th Avenue for discussion purposes within the remainder of the study. Peony Lane: The City has expended considerable effort on the proposed extension of Peony Lane/Lawndale Lane from south of 54th Avenue to Lawndale Lane at the border with Maple Grove. A public informational meeting was held in early May 2012. It is anticipated based on the response from that meeting and information prepared to date by city staff and their consultant that the preferred alignment as presented at the public information meeting is Alignment 3. The proposed 2 extension of Peony Lane as shown on Exhibit 4 of this report reflects the preferred Alignment 3. Preliminary cost estimates are based on a four -lane divided roadway. The extension of Peony Lane provides paved street access to the properties located within the center of the study area 54th Avenue: 54th Avenue is proposed to be extended from Peony Lane to County Road 101. The roadway would provide access for the future Speak the Word campus and the properties on the south end of Vagabond Lane. It would also provide access to the north side of the Elm Creek Golf Course. The roadway would be extended as a two-lane undivided roadway with 66 -feet of right-of-way. The roadway width will vary from 32 -feet to 44 -feet. The proposed layout for the future Speak the Word campus was utilized for the alignment of the roadway adjacent to their property. In addition, existing wetlands and topography within the proposed corridor have been taken into account in developing the remainder of the preliminary proposed alignment shown on Exhibit 4. Number of privately owned impacted parcels (right-of-way) 8 City -owned property impacted (acres) 0 Parcels with structures that require relocation 0 Wetland impact (acres) 0.35 Maximum slope of the proposed street 8% Crossing of Elm Creek No There are City owned parcels on the east end of the proposed 54th Avenue alignment that could be utilized if less acquisition of right-of-way is desired. However, this will impact additional wetlands. In addition, the proposed alignment takes into consideration the location of the Elm Creek Interceptor to include the manhole locations within the right-of-way where feasible. Shifting the roadway onto City property would move the roadway south of the Interceptor. Dunkirk Lane: Dunkirk Lane from County Road 47 to the south is also proposed as a two-lane undivided roadway with right-of-way generally 66 -feet in width and a 32 -foot wide roadway section. Proposed development layouts have been submitted to the City for the Scherber Partnership Properties adjacent to Dunkirk Lane just south of County Road 47 and the parcels just north of the Timber Creek Crossing Addition. Dunkirk Lane would be constructed by the developers 3 within these segments. The preliminary cost estimates are only for the highlighted section of Dunkirk Lane shown on Exhibit 4. The City did receive $133,000 from a developer towards the future upgrade of Dunkirk Lane. The roadway would generally be constructed in the location of the existing gravel road and therefore impacts to properties and wetlands are negligible. 58th Avenue: Due to minimal east/west routes between Dunkirk Lane N and the proposed extension of Peony Lane, the area was reviewed to determine if an additional east/west route would be feasible and cost effective. The highlighted route on Exhibit 4 was identified as the route with the least wetland impacts. The following is a summary of impacts with the proposed route: Number of privately owned impacted parcels (right-of-way) 3 City -owned property impacted (acres) 0.4 Parcels with structures that require relocation (garage) 1 Wetland impact (acres) 1.45 Maximum slope of the proposed street 8% Crossing of Elm Creek Yes Sanitary sewer is proposed to be extended from Peony Lane across the wetland in the vicinity of where the street is proposed. If the street is extended watermain should also be extended to provide for additional looping of the system. The street would allow for access to these utilities for future maintenance. There are City owned parcels on the east end of this roadway that could be utilized to minimize right-of-way acquisition. The roadway was moved to the south of the City owned parcels to avoid impacts to a house and keep the impacts limited to the garage. The roadway is not entirely necessary for the street network system due to the proximity to County Road 47, which is an east/west route approximately 1,350' to the north. However, if an additional east/west route is desired between County Road 47 and Schmidt Lake Road the identified location of 58th Avenue is the most logical due to the extent of existing wetlands in the remaining corridor. M Trunk Sanitary Sewer As noted above, the extension of the Elm Creek Interceptor provided access to sanitary sewer within 1/4 mile to a number of parcels within the study area. Four main trunk extensions are proposed to serve the remaining parcels within the area and are shown on Exhibit 5. Exhibits are also included that provide information on the existing topographic relief of each segment and the depth of sanitary sewer that would be necessary to service the area. A summary of the extensions follows: Segment 1: This segment will serve the parcels located in the northwest corner of the study area. 85% of the sanitary sewer depth is less than 30 -feet, however approximately 15% of the sewer is between 30 -feet and 40 -feet in depth. An optional alignment to serve the parcels north of County Road 47 was reviewed under Segment 0. Segment 0 would replace the need to construct Segment 1B and install a crossing under County Road 47; however the length of sanitary sewer to construct is longer for Segment 0. The sewer depth would all be less than 30 -feet. The phasing of development in the area may ultimately determine which alignment is constructed. Segment 2: This segment would serve the Elm Creek Golf Course. The extension shown on Exhibit 5 to serve the area north of T.H. 55 and west of Peony Lane in the south corner of the study area is from the Elm Creek Interceptor. There is existing sanitary sewer in the southwest corner of the study area near T.H. 55 that could be extended north to serve this area as well. The Elm Creek Interceptor and the existing sanitary sewer south of T.H. 55 both have adequate depth to service this area. Elm Creek cuts through the south portion of the golf course. Given the topographic relief of the property and the location of Elm Creek the sanitary sewer depth becomes excessive if an attempt is made to service the entire property from either the Elm Creek Interceptor or the T.H. 55 sanitary sewer alone. If depth is to be minimized an extension may be necessary from both directions that terminates on either side of Elm Creek. If Segment 2 is extended at a depth necessary to service this entire area the required depth would include approximately 615' of sewer that is 50 to 60 -feet deep. 5 Segment 3: This segment will serve the parcels located on the east side of the study area. The installation of Segment 3 will require crossing of a wetland and Elm Creek. An extension through a City owned parcel will provide service to the northeast corner of the study area. Approximately half of the length of sewer necessary to serve this area is under 20 -feet in depth and the other half is less than 30 -feet in depth. Segment 4: This segment is the extension of Segment 1 to serve the area within Phase 4. Depending on the final alignment of this sanitary sewer main and the timing of the installation it may be necessary to disturb the north portion of Troy Lane. No costs have been included for street impacts in the estimated cost section. A summary of the parcels served, number of developable lots, and length of sewer follows in the Appendix as Table 1. Trunk Watermain The length of watermain necessary to provide service to all parcels within 1/4 mile is greater than the length of sanitary sewer. The proposed watermain extensions are shown on Exhibit 6. In general, the mains shown are those necessary to provide service to the properties within the area. Water modeling was completed for various scenarios to compare potentially long dead-end segments with looped trunk watermain. Segment A6 and Segment E were added beyond that to simply serve the properties within the study area as a means to provide redundancy and increased fire flow. Water modeling results are shown in Appendix C. Each phase is discussed in greater detail below. Segment A: This segment will extend watermain along the proposed Peony Lane extension. This will provide the main trunk extension to the properties located in the northwest corner of the study area. An alternate alignment for a portion of the watermain along Peony Lane has been included. This alternate assumes that watermain would be extended utilizing a future development to the west of Peony Lane when possible. The purpose would be to reduce the cost to the City by paying for the upsizing of watermain installed within the development from lateral to trunk rather than incurring the cost of paying for the entire trunk main. Water modeling was completed to determine if a watermain loop was necessary along County Road 47 to loop the Peony Lane trunk main into the trunk main that currently 2 terminates at County Road 47. Available fire flow and peak hour pressure for the surrounding area was determined for a dead end main on Peony Lane and a looped system. For residential properties the required fire flow is 1,500 gallons per minute for two hours with a minimum residual pressure of 20 psi. Comparing the results of the two scenarios indicates that minimal variations will be observed in pressure. Variations under 10 psi will be negligible to most customers. In addition, the required fire flows are met in both cases. The trunk watermain Segment A6 is proposed to be constructed in the first phase to provide reductions in service disruptions and to provide a level of redundancy to the system in case of main breaks or other emergencies such as fire suppression operations. Segment B: This segment extends watermain from Peony Lane along the future 54th Avenue extension to serve the southwest portion of the study area. Depending on the timing of the construction of 54th Avenue it may be possible to install the watermain ahead of any street construction by utilizing the easement obtained for the Elm Creek Interceptor. Segment C: This segment extends watermain along Dunkirk Lane to serve the east portion of the study area. Watermain would be extended from the proposed developments adjacent to Dunkirk Lane. Segment D: This segment is the extension of Segment A to serve the very northwest corner. Installation of the watermain along Troy Lane could be accomplished with minimal street impacts with installation by directional bore. Segment E: This segment is to provide looped watermain from Segment B to Segment D. The 2030 Comprehensive Plan currently calls for Commercial, C, in the very northwest corner of the study area and Semi-Public/Institutional, P-1, along the west edge adjacent to County Road 101. For commercial, institutional, and industrial land uses the minimum fire flow is 3,500 gallons per minute. To achieve this required rate it will be necessary to loop the two segments along County Road 101. 7 If an east/west route from Dunkirk Lane to Peony Lane were constructed in the future then the City may want to consider the installation of watermain along the route for additional looping purposes. Phasing Phasing of the improvements is an important component of providing service to the Northwest Area. The goal of the phasing is to outline a logical, controlled development of the Northwest Area while ensuring an overabundance of lots is not created or that expenditures are not made before they are needed. The phasing plan that follows is based on the current rate that land is being consumed for residential development within the City. The City observed a recent rate of land consumed by development of 185 acres over two years. In addition to acres consumed a review of the building permits issued over the last three years was also reviewed. The number of residential permits issued per year is as follows: Year Number of Building Permits Issued 2009 75 2010 133 2011 288 Total: 496 It was determined that for this report an average consumption rate of 165 lots per year would be used. There are currently 910 potential residential lots with access to paved streets, sanitary sewer, and watermain that are located outside of the study area. Assuming a rate of consumption of 165 lots per year, the land would be consumed for development within 5 to 6 years. Four phases are proposed for the extension of streets, sanitary sewer, and watermain to service all of the properties within the service area. The phases could be further broken down if so desired. Phase 1: Peony Lane/Lawndale Lane is proposed for construction in the summer of 2014. The construction of this roadway and the associated watermain, which consists of the Segment A sections, is considered to be the first phase of developing the area within the Northwest Area. Phase 2: The extension of 54th Avenue and the watermain consisting of the Segment B sections is proposed for Phase 2. Sketch plans have been prepared for the Speak the Word campus and the Elm Creek Golf Course; however no final plans have been completed. Phase 3: The construction of the remaining portions of Dunkirk Lane N after the development of the north and south properties within the study area and the watermain segments consisting of Segment C sections are included in Phase 3. This phase does require the extension of the sanitary sewer Segment 3 sections. Construction of 58th Avenue or another east/west route as part of this phase is optional. Phase 4: Phase 4 consists of the construction of the Segment D and Segment E watermain sections and Segment 4 of the sanitary sewer sections. The number of residential lots created with each phase is outlined below: Phase Number of Lots Time of Build Out ears 1 917 5.5 2 637 3.9 3 319 1.9 4 458 2.8 Total Lots: 2,331 The number of lots created is based on the maximum allowed according to the 2030 Comprehensive Plan and the anticipated zoning for the area. The time to build out is based on the current consumption rate of an average amount of 165 lots per year. 0 Estimated Costs Preliminary construction costs have been calculated for the infrastructure necessary to service the properties within the Northwest Study Area. Street Improvements: Peony Lane /Lawndale Lane Right-of-way $ 2,000,000 Construction $ 9,000,000 Total $11,000,000 54th Avenue Right-of-way $ 525,000 Construction $ 2,775,000 Total $ 3,300,000 Dunkirk Lane Right-of-way $ - Construction $ 900,000 Total $ 900,000 58th Avenue Right-of-way $ 425,000 Construction $ 1,300,000 Total $ 1,725,000 Assumptions: 1. The estimated costs for Peony Lane/Lawndale Lawn are based on Alignment 3 and were prepared by WSB & Associates. 2. Right-of-way costs were based on a rate of $2.50 per square foot, which was used for all parcels. Actual costs will vary depending on the final alignment chosen and individual impacts to parcels. No costs were included for impacts to City owned properties. 3. The estimated costs for 54th Avenue are based on a 44 -foot wide roadway and include a trail or sidewalk. The right-of-way cost could be reduced in City owned property is utilized for a portion of the alignment. 4. It is assumed that no additional right-of-way will need to be obtained for Dunkirk Lane and that the improvements will occur within the existing right-of-way. The existing right-of-way width is a minimum of 66 -feet through the proposed improvement area. The estimated costs are based on a 32 -foot wide roadway. 10 Pae 12 5. The estimated costs for 58th Avenue are based on a 32 -foot wide roadway and include a trail or sidewalk. The right-of-way cost could be reduced in City owned property is utilized for a greater portion of the alignment. Trunk Sanitary Sewer The estimated costs are shown in Table 1 and are based on the sizing shown. Sanitary sewer costs do not include any cost for easement or right-of-way acquisition. The costs also do not include major street repairs. Trunk Watermain The estimated costs are shown in Table 2 and are based on the sizing shown. Watermain costs do not include any cost for easement or right-of-way acquisition. The costs also do not include major street repairs. Proposed Phase Costs The cost for each of the four phases is summarized below and includes the street, sanitary sewer, and/or watermain that would be necessary to provide access to all three components of infrastructure. Phase 1 Street $11,000,000 Sanitary Sewer $ 340,000 Watermain $ 1,400,000 Total $12,740,000 This is the cost to provide access to infrastructure within the Phase 1 area and build out of the Phase 1 area, which includes trunk extensions to serve future phases. As the area within Phase 1 develops the sanitary sewer Segments 1, IA, and 113 (or Optional 0) would be installed. The City could work with the developer to have the sanitary sewer installed at the size and depth necessary to serve the properties to the north and west. In addition to the sanitary sewer, trunk watermain Segments A4 and A5 would also be installed as the area develops. If the utilities are extended with development the cost would be reduced from that noted above. 11 Pae 13 Phase 2 Street $ 3,300,000 Sanitary Sewer $ 195,000 Watermain $ 405,000 Total $ 3,900,000 If the Elm Creek Golf Course develops as one large development, the sanitary sewer access would be from the Elm Creek Interceptor and the City would not need to incur the sanitary sewer cost associated with Segment 2. In addition, the watermain costs associated with Segment B 1 would not need to be incurred. Phase 3 Street $ 900,000 Sanitary Sewer $ 235,000 Watermain $ 340,000 Total $ 1,475,000 If an east/west roadway is desired between Dunkirk Lane and Peony Lane it could be constructed as part of this phase to further connect the properties within Phase 3 to the street network. The alignment of 58th Avenue that is shown on Exhibit 4 is the shortest route with the least wetland impacts. The cost could change significantly depending on the final route chosen, but is estimated at $425,000. This cost would be above and beyond what is shown above. The watermain costs may also be lower as it would be routed through any potential developments that occur prior to the construction. Phase 4 Street - Sanitary Sewer $ 120,000 Watermain $ 565,000 Total $ 685,000 No street improvements have been included as part of this phase. Depending on the alignment chosen for Segment 4A, impacts to Troy Lane as part of the extension may be incurred. 12 Pae 14 Financing Financing the proposed improvements is proposed to come from a variety of sources. Streets Current municipal state aid (MSA) rules allow MSA cities to request advancements of up to the lesser of $4 million dollars or five (5) times their annual allotment to fund construction of state aid roadways. The advancement would be repaid by the City's future allocation of state aid funds. The City's current rate of allocation is approximately $2 million annually. The other funding source available to the City is special assessments. The report assumes that a residential property would be assessed based on a 32 -foot wide roadway. Peony Lane: The funding for Peony Lane is currently designated as "Other" in the Capital Improvement Program. Although the exact funding source is unknown it will likely come from a variety of sources. A funding mix of special assessments and MSA funds is assumed to finance the roadway improvements. Another option for funding a portion of the Peony Lane street improvements that the City Council may wish to consider is establishing, by ordinance, a development fee similar to Park Dedication that would be dedicated to funding for Peony Lane. This fee would only be applicable to developing properties in the Northwest Area. Two methods were analyzed by city staff to determine the most appropriate means by which to establish the fee. The first method analyzed was determining the trips that are expected to be generated by the development of the property in the Northwest Area in the vicinity of Peony Lane using population and employment data from the City's Land Use Plan element of the 2030 Comprehensive Plan. The number of trips generated utilizing this method was 17,585 additional trips from 2005 data to projected 2030 data. The second method analyzed was determining the trips expected to be distributed onto the roadway system by development of the property in the Northwest Area in the vicinity of Peony Lane using the City's Transportation Plan element of the 2030 Comprehensive Plan. The number of trips generated utilizing this method was 17,510 additional trips from 2005 data to projected 2030 data. Since the two methods yielded very similar results in terms of expected traffic volumes generated by development of the Northwest Area, the Transportation Plan Element method was 13 utilized to establish the percentage of trips on Peony Lane generated by development of the Northwest Area. This percentage was then used to calculate a fee based and equivalent percentage of the cost divided into the potential number of units to be developed, which was extracted from the net area of land in the Northwest Area of 1,104.09 net acres. The assessment per unit was calculated as follows: Total Construction Cost (less R/W) $8,991,400 Attributable to Development (49%) 4,405,786 Northwest Area Size (Net Acres) 1,104.09 Cost Per Acre $3,991 Assuming an average of four units per acre within the study area equates to a cost per unit of roughly $1,000 per unit. There is an expected increase in the number of households in the Northwest Area from 2005 to 2030 of 1,813 households. The total assessed would be 1,813,000 or a total of 20% of the construction cost. Dunkirk Lane: Dunkirk Lane is proposed to be funded through special assessments to abutting properties. The roadway is proposed as a 32 -foot wide street and assessments would be based on this width. 54th Avenue: 54th Avenue is proposed to be funded through special assessments to abutting properties. The roadway is proposed as a 32 to 44 -foot wide street. A portion of the street abuts property that is not currently zoned as residential. Assessments to these properties would be based on the full street width while residential properties would be based on a 32 -foot width. 54th Avenue is also currently on the City's MSA system. This would allow the use of MSA funds for the construction of the roadway. 14 Existing ADT 2030 ADT Difference Peony 5,300 10,400 5,100 49.0% This percentage was then used to calculate a fee based and equivalent percentage of the cost divided into the potential number of units to be developed, which was extracted from the net area of land in the Northwest Area of 1,104.09 net acres. The assessment per unit was calculated as follows: Total Construction Cost (less R/W) $8,991,400 Attributable to Development (49%) 4,405,786 Northwest Area Size (Net Acres) 1,104.09 Cost Per Acre $3,991 Assuming an average of four units per acre within the study area equates to a cost per unit of roughly $1,000 per unit. There is an expected increase in the number of households in the Northwest Area from 2005 to 2030 of 1,813 households. The total assessed would be 1,813,000 or a total of 20% of the construction cost. Dunkirk Lane: Dunkirk Lane is proposed to be funded through special assessments to abutting properties. The roadway is proposed as a 32 -foot wide street and assessments would be based on this width. 54th Avenue: 54th Avenue is proposed to be funded through special assessments to abutting properties. The roadway is proposed as a 32 to 44 -foot wide street. A portion of the street abuts property that is not currently zoned as residential. Assessments to these properties would be based on the full street width while residential properties would be based on a 32 -foot width. 54th Avenue is also currently on the City's MSA system. This would allow the use of MSA funds for the construction of the roadway. 14 58th Avenue: 58th Avenue is proposed to be funded through special assessments to abutting properties. The roadway is proposed as a 32 -foot wide street and assessments would be based on this width. Sanitary Sewer and Watermain As identified in the 2030 Comprehensive Plan the City uses two main sources of funding to finance construction of trunk utilities. They are area charges and connection fees. In addition to these two sources the City could reduce expenditures or apply a lateral assessment to Developers or property owners for utility extensions through developments that could be utilized for individual lot service. The City could require the Developer to oversize and/or have increased bury depth on mains that could be utilized as both lateral and trunk mains. The City would have to fund only the additional costs above and beyond a typical 8 -inch main for both the sewer and watermain. Using all of these funding mechanisms results in excess funds being generated by the extension of the proposed segments; however these excess funds would be needed to provide for additional wastewater treatment capacity and water production, treatment, and storage. Summary of Financing The construction cost of each phase is compared to the funding mechanisms that have been identified for the corresponding improvements. 15 Phase 1 Overall Cost 12,740,000 REC Charges 1,610,000 Area Charges 1,300,000 Lateral by Developers 600,000 Development Fee (Peony) 1,813,000 Municipal State Aid 4,000,000 Street Assessments 3,382,750 Shortage/Excess 35,000 Shortage Phase 2 Overall Cost 3,900,000 REC Charges 940,000 Area Charges 915,000 Lateral by Developers 145,000 Municipal State Aid Street Assessments 2,204,000 Shortage/Excess 304,000 Excess Generated Phase 3 Overall Cost 1,475,000 REC Charges 225,000 Area Charges 455,000 Lateral by Developers 170,000 Street Assessments 1,796,200 Shortage/Excess 1,171,200 Excess Generated Phase 4 Overall Cost 685,000 REC Charges 615,000 Area Charges 295,000 Lateral by Developers 125,000 Shortage/Excess 350,000 Excess Generated The overall cost for Phase 3 assumes the construction of 58th Avenue. None of the construction costs provided above include engineering, administration, and legal expenses. The assessment numbers generated are based on construction cost and right-of-way. In addition, the street 16 assessment amounts are only dollar amounts received from property owners but are based on a front footage amount that accounts for the City parcels also being assessed. Summary The construction of Peony Lane/Lawndale Lane and the watermain segments contained with Phase 1 will open up the Northwest Area to the potential for five (5) additional years of residential development at the current consumption rate. The City could reduce the cost of extending utilities to areas outside of Phase 1 by requiring that the majority of the trunk utilities be installed as development occurs and thereby incurring only the oversizing costs. However, this would result in staged development and properties outside of the logical sequencing would have greater difficulty in developing outside of the time line driven by this sequencing. This would also require the City to work with developers to ensure that improvements can serve the upstream properties in an appropriate manner. Development pressure from individual properties will most likely drive the final phasing plan that occurs for the overall area; however the City can anticipate the need to construct 54th Avenue or upgrade Dunkirk Lane within 5 years of the completion of Peony Lane/Lawndale Lane. 17 Appendix A Exhibits Le end N Parcels Study Boundary Existing Paved Public Street Access Wetlands Proposed Development City Owned Parcels W IMAMhG EXHIBIT 1 EXISTING STREET NETWORK 0 E k NUMB 40. Pa f2t Le end Parcels Existing Sanitary Sewer Manhole Existing Sanitary Sewer Study Boundary Wetlands Proposed Development City Owned Parcels Existing Gravity System Access EXHIBIT 2 EXISTING SANITARY SEWER LIM N S E 9 NUMB 400. Padbt 21fl 3s Legend Parcels Existing Watermain Study Boundary Wetlands Proposed Development City Owned Parcels Ex. Water System Access EXHIBIT 3 EXISTING WATERMAIN 01 S E 11MI NG k NOWTIS TRUE HAM Le end Parcels Study Boundary Future Street Extensions Existing Paved Public Street Access Wetlands Proposed Development City Owned Parcels W N IMAMhG EXHIBIT 4 PROPOSED STREET EXTENSIONS 0 E k NUMB 40. Paf 2W Parcels Existing Sanitary Sewer Manhole Existing Sanitary Sewer Proposed Trunk Sanitary Sewer Route Study Boundary Future Street Extensions Wetlands Proposed Development City Owned Parcels Existing Gravity System Access Segment 1A Segment 1 B/Segment 0 Segment 2 Segment 3A Segment 3B W Segment 4A Segment 4B S 11 EXHIBIT 5 PROPOSED TRUNK SANITARY SEWER Padbtnfl 3s Parcels Existing Watermain Legend Proposed Trunk Watermain Route Study Boundary Future Street Extensions Wetlands Proposed Development City Owned Parcels Ex. Water System Access Segment Al Segment A2 Segment A3 Segment A4 Segment A5 Segment A6 Segment B Segment B1 Segment C Segment D1 M 00 S E IffaI NG k NOWTIS EXHIBIT 6 PROPOSED TRUNK WATERMAI N TPK HAM Le end Parcels I Phase 1 Study Boundary Phase 2 Future Street Extensions Phase 3 Wetlands Phase 4 Proposed Development City Owned Parcels EXHIBIT 7 ANTICIPATED PHASING W N 0 E 400 - Pao' 21fl Appendix B Plan and Profile 44 VERT. r 0 ,00 VERT. 10 SEGMENT 1S 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT NO. DATE BY REVISION DESCRIPTION10062FLANDERSCTNEDESIGNEDBY. KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. BLAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY rrII rr rrnn u// ! (( r( lK k NOUTU PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER 16000tE THE LAYS OF THE STATE OF MINNESOTA. I i FAX: (763) 780-0452 CAD DATE: MAY 2012 CITY OF PLYMOUTH, MN SEGMENT 1, SEGMENT 1A, AND SEGMENT IB CAD FILE: CAD\180001E\DWG\PLAN & PROFILE SIGNATURE DATE PLAN AND PROFILE Pd 2 P1 TRUE NDRAI PRINTED NAME LIC.NO. NORTH 00 0 VERT. 10 o ti i Ski+ 00 = t tt `p , 2+00 34 SEGMENT 2 lam 6+00' A0, 9+0o t f 1 t SEGMENT f r 0+6oiZ+oo_ a9/ r 910 I1 15+00 t4.+00 13+0 12+ lob ' i14b0- tOt00 9+QO '8+00 j 7+00 8too' 5+00: 4}00 ,3+Oo z+o ,-.i,+oo I. cc 1 > J I{ •J; 1/+sO t/+OO 16+50 16+UU 15+50 15+00 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+00 5+50 8+00 5+50 5+00 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. BLAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER 180001E THE LAWS OF THE STATE OF MINNESOTA. Rfa% k MONTE FAX: (763) 780-0452 CAD DATE: MAY 2012 CITY OF PLYMOUTH, MN SEGMENT 2 AND SEGMENT 0 A CAD FILE: CAD\ 18000 1 E\DWG\PLAN & PROFILE SIGNATURE DATE PLAN AND PROFILE Pa 31"P2 1AII NORRjII PRINTED NAME OC.NO. NORTH / 0100 0 VERT. 10 t 00 0 VERT. 10 SEGMENT 3 ls, 0 100 0 VERT. 10 SEGMENT 3A SEGMENT 3S 0000 I % , 20-F00- 21+d0fid 00 ?4. SEGMENT 3S 0000 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. BLAINE, MN 55449 THAT I AM A DULY UC SED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY rrrnNr n(r Trr PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER t60001E THE LAWS OF THE STATE OF MINNESOTA. SEGMENT 3, SEGMENT 3A, AND SEGMENT 3BL-1SIIIV tl ))0 I{) FAX: (763) 780-0452 CAD DATE: MAY 2012 CITY OF PLYMOUTH, MN Pa e r 3CADFILE: CAD\ 180001 E\DWG\ PLAN & PROFILE SIGNATURE DATE PLAN AND PROFILE iA0lNtlQAI PRINTED NAME LIC.NO.- _ : 00 ?4. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. BLAINE, MN 55449 THAT I AM A DULY UC SED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY rrrnNr n(r Trr PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER t60001E THE LAWS OF THE STATE OF MINNESOTA. SEGMENT 3, SEGMENT 3A, AND SEGMENT 3BL-1SIIIV tl ))0 I{) FAX: (763) 780-0452 CAD DATE: MAY 2012 CITY OF PLYMOUTH, MN Pa e r 3CADFILE: CAD\ 180001 E\DWG\ PLAN & PROFILE SIGNATURE DATE PLAN AND PROFILE iA0lNtlQAI PRINTED NAME LIC.NO.- _ : SEGMENT 4A I HEREBY CERTIFY THAT THIS PLAN, SPECIFlCAl10N, OR REPORT N0. DATE BY REVISION DESCRIPTION II I a E Y WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND j SHEET N0. ELAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER tt1 3i 7 33+00 -: ) 32±00 31+g0 1 I r I I .. ;-.`I• ::::.L - 'IAF SEGMENT 4A AND SEGMENT 4B FAX: (763) 780-0452 CAD DATE: MAY 2012 CAD FILE: CAD\180001E\DWG\PLAN & PROFILE SIGNATURE GATE Cm' OF PLYMOUTH, MN r< PLAN AND PROFILE Pa P4 jAO NORM PRINTED NAME LIC.NO. fes, r I HEREBY CERTIFY THAT THIS PLAN, SPECIFlCAl10N, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. ELAINE, MN 55449 fes, r I HEREBY CERTIFY THAT THIS PLAN, SPECIFlCAl10N, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. ELAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY 3i PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER 180001E THE LAWS OF THE STATE OF MINNESOTA. SEGMENT 4A AND SEGMENT 4B FAX: (763) 780-0452 CAD DATE: MAY 2012 CAD FILE: CAD\180001E\DWG\PLAN & PROFILE SIGNATURE GATE Cm' OF PLYMOUTH, MN PLAN AND PROFILE Pa P4 jAO NORM PRINTED NAME LIC.NO. I HEREBY CERTIFY THAT THIS PLAN, SPECIFlCAl10N, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. ELAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER 180001E THE LAWS OF THE STATE OF MINNESOTA. SEGMENT 4A AND SEGMENT 4B FAX: (763) 780-0452 CAD DATE: MAY 2012 CAD FILE: CAD\180001E\DWG\PLAN & PROFILE SIGNATURE GATE Cm' OF PLYMOUTH, MN PLAN AND PROFILE Pa P4 jAO NORM PRINTED NAME LIC.NO. NORTH 0100 0I VERT. 10 Io z3+oo zz+oo 21+00 .' zo+oo PROPOSED 54TH AVE. 18+00 ----.. 1i+00 1-6+00 15+00 - ou —uu L1+au L1+uu —ou zu+uu 1H+5u 1a+uu 10+5u 10+uu 1/+5u 1/+uu 1E+5u 1E+uu is+SD is+uu 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+DO 2+50 2+DO 1+50 1+00 0+50 0+00 1 — PROPOSED 54TH AVEe -s_ 24+00 25+00 22+00 I 1 gg 0 100 Oo 4 I VERT. 10 O x 38+00 " I I I } r i' '! _ 4 37.+-0 36+50 35+00 =34+ 00 33+0 35+00 31+00 30+00 Z9kp0 ' _ 1 1 --4-- w I M mm 1 1 1 r , i I I N0. DATE BY REVISION DESCRIPTION I WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND ou —uu L1+au L1+uu —ou zu+uu 1H+5u 1a+uu 10+5u 10+uu 1/+5u 1/+uu 1E+5u 1E+uu is+SD is+uu 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+DO 2+50 2+DO 1+50 1+00 0+50 0+00 1 — PROPOSED 54TH AVEe -s_ 24+00 25+00 22+00 I 1 gg 0 100 Oo 4 I VERT. 10 O x 38+00 " I I I } r i' '! _ 4 37.+-0 36+50 35+00 =34+ 00 33+0 35+00 31+00 30+00 Z9kp0 ' _ 1 1 --4-- w I M mm I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. BLAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER 180001E THE LAWS OF THE STATE OF MINNESOTA. PROPOSED 54TH AVE. FAX: (753) 780-0452 CAD DATE: MAY 2012 CAD FILE: CAD\780001E\DWG\PLAN & PROFILE SIGNATURE DATE CITY OF PLYMOUTH, MN PLAN AND PROFILE P TaIIL HUE] PRINTED NAME 1fr. .N0- WiilWiii`i_____—____8_______i'i___C.`[s>•I'.., ou —uu L1+au L1+uu —ou zu+uu 1H+5u 1a+uu 10+5u 10+uu 1/+5u 1/+uu 1E+5u 1E+uu is+SD is+uu 14+50 14+00 13+50 13+00 12+50 12+00 11+50 11+00 10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+DO 2+50 2+DO 1+50 1+00 0+50 0+00 1 — PROPOSED 54TH AVEe -s_ 24+00 25+00 22+00 I 1 gg 0 100 Oo 4 I VERT. 10 Ox 38+00 " I I I } r i' '! _ 4 37.+-0 36+50 35+00 =34+ 00 33+0 35+00 31+00 30+00 Z9kp0 ' _ 1 1 --4-- w I M mm I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. BLAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER 180001E THE LAWS OF THE STATE OF MINNESOTA. PROPOSED 54TH AVE. FAX: (753) 780-0452 CAD DATE: MAY 2012 CAD FILE: CAD\780001E\DWG\PLAN & PROFILE SIGNATURE DATE CITY OF PLYMOUTH, MN PLAN AND PROFILE P TaIIL HUE] PRINTED NAME 1fr. .N0- 39+50 39+00 38+50 38+00 37+50 37+00 36+50 36+00 35+50 35+00 34+50 34+00 33+50 33+OD 32+50 32+00 31+50 31+00 30+50 30+00 29+50 29+00 28+50 28+00 27+50 27+00 26+50 26+00 25+50 25+00 24+50 24+00 23+50 23+00 22+50 . I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT N0. DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY: SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND SHEET N0. BLAINE, MN 55449 THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY PH: (763) 780-0450 APPROVED BY: LWE JOB NUMBER 180001E THE LAWS OF THE STATE OF MINNESOTA. PROPOSED 54TH AVE. FAX: (753) 780-0452 CAD DATE: MAY 2012 CAD FILE: CAD\780001E\DWG\PLAN & PROFILE SIGNATURE DATE CITY OF PLYMOUTH, MN PLAN AND PROFILE P TaIIL HUE] PRINTED NAME 1fr. .N0- NORTN 0100 0I VERT. 10 NORTH 0 100 0 VERT. 10 PROPOSED 58TH AVE. WA 23+00 25+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 20+00 20+50 I HEREBY CERTIFY THAT THIS PLAN, SPEZICATION, OR REPORT N0DATE BY REVISION DESCRIPTION 10062 FLANDERS CT NE DESIGNED BY: KJE DRAWN BY. SMM WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND . SHEET NO. BLAINE, MN 55449APPROVED BK LWE ITHAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER NORTHWEST AREA STUDY PH: 763 780-0450 JOB NUMBER 180001E THE LAYS OF THE STATE OF MINNESOTA. RIN6 -OSSO(I T S FAX: (763) 78D-0452 CAD DATE: MAY 2012 CITY OF PLYMOUTH, MN PROPOSED 58TH AVE. CAD FILE: CAD\180001E\DWG\PLAN & PROFILE SIGNATURE DATE PLAN AND PROFILE Pa 30P6 Tnurunnm o.,FlFl I—u Appendix C Watermain Modeling City of Plymouth, Minnesota NW Water Main Phasing Scenario 1 - Maximum Day Available Fire Flow No Loop to Dunkirk Ln Initial Model Conditions: Maximum Day Demands All Wells Running Towers 10 feet Below Overflow Available Flow at 20 psi Residual 2790 g Legend Pipe Watermain Diameter Less than 12 Inch 12 Inch 16 Inch Greater than 16 Inch ANNO-1 4 51 gp g 475 g 402 101 El Ell M, 0* 7 06 774 i,5 gp [ E--7:9 1 5778 3869 gpri O Page 36 BM 8592 gprr s o, • s! I • • 1 8189 9Prr' 1 a • _ 1 : 1 1 • • A` • S.,r i_iq. ':•Lill. ff`i,,I n C F"I IIIIIM : 1 • - r,Y1 ..y 11111\,. t T _ L'177 7ii i1 I' •1 •• EHNE i• . 1 4• P 756 g 14 42 •• 11 •• aA• w 4• • •• ,. 3002 •• • • Page 36 City of Plymouth, Minnesota NW Water Main Phasing Legend Scenario1 - Peak Hour Pressure No Loop to Dunkirk Ln Pipe Watermain Diameter Initial Model Conditions: Less than 12 Inch Peak Hour Demands 12 Inch All Wells Running 16 Inch Towers 10 feet Below Overflow Greater than 16 Inch 73 s 4p 54 p I psi 65 p ps p 65 4 ps p 3 si 29 psi 7 1 47 ps,i 61 p 43 65 psi ps 3 36 p 47p 1 71 ps r4l 3 V 34 33 1 35 psi 31 i 1 0 39 psiOm q " s o PSI 0 3 p057p9psp3 46 ps 0 44 ps 44, pS1 ps 48 Ps O 31 440psi i 94 psi 35 p 44 s9 O 9 st p 42ops$ 36 ps0 44 ps 40 p 39a g 40 ps141 sps si O 48 psi p 0 55 psi 39P91 40 s ; 9$si 49 p s0 psi p Page 37 City of Plymouth, Minnesota NW Water Main Phasing Scenario 2 - Maximum Day Available Fire Flow Looped to Dunkirk Ln Initial Model Conditions: Maximum Day Demands All Wells Running Towers 10 feet Below Overflow Available Flow at 20 psi Residual 3081 g 9 38 3519 at 9 4824 11796 g 10856 c 9854 g 9734 g 911 9 3336 g pR? 6 gp 0 Legend Pipe Watermain Diameter Less than 12 Inch 12 Inch 16 Inch Greater than 16 Inch ANNO-1 4 - Va. as: Mw 0 2493 gpm 4615 gr 3000 gp m 9 rw 0 Page 38 City of Plymouth, Minnesota NW Water Main Phasing Legend Scenario 2 - Peak Hour Pressure Looped to Dunkirk Ln Pipe Watermain Diamter Initial Model Conditions: Less than 12 Inch Peak Hour Demands 12 Inch All Wells Running Towers 10 feet Below Overflow 16 Inch 42 72 63 psi 63 Greater than 16 Inch 91 Page 39 M City of Plymouth, Minnesota NW Water Main Phasing Scenario3 - Maximum Day Available Fire Flow No Loop to Dunkirk Ln, CR 101 Looped Initial Model Conditions: Maximum Day Demands All Wells Running Towers 10 feet Below Overflow Available Flow at 20 psi Residual 3452 aorN 3502 3379 g It gpi 4528 9 8592 g 8189 g 7604 g 7624 g 3500 gprn oo 3 39 i 142 gp, Legend Pipe RUN_DIAM Less than 12 Inch 12 Inch 16 Inch Greater than 16 Inch n IWAIIIVI' I' m ff, rOlin11 0 0 0 V - 2894pf-'P44 R-14- 9401 gA 0 2495 gpr 4616 3002 gp rem Page 40 City of Plymouth, Minnesota NW Water Main Phasing Legend Scenario4 - Maximum Day Available Fire Flow Looped to Dunkirk Ln, CR 101 Looped Pipe Watermain Diameter Initial Model Conditions: Less than 12 Inch 12 Inch Maximum Day Demands All Wells Running 16 Inch Towers 10 feet Below Overflow Available Flow at 20 psi Residual Greater than 16 Inch 4009 g 9 3989 4010 gprrl / .P 1 717 gpm 9Pm 1 1 11891 10930 g 9914 g 9789 4 7746 \ 8 01 gpr EA 2892 9430 ar Page 41 Appendix D Trunk Utility Construction Cost Estimates Table 1 Sanitary Sewer Trunk Extension Construction Cost Funding Sources Segment Length Number of Parcels Served Developable Acres Served Number of Residential Lots Size inches Total Estimated Segment Cost Sewer REC Charge Sewer Area Charge Lateral Construction Cost by Developer 1 1,492 12 138,710 59,680 1A 1 1,446 1 7 1 67.5 1 217 1 10 124,180 90,055 69,120 57,840 1B 421 9 66.9 401 8 76,015 166,415 68,506 16,840 Total Phase 1 338,905 256,470 137,626 134,360 2 1,491 5 95.1 570 10 194,845 236,550 97,382 59,640 Total Phase 2 194,845 236,550 97,382 59,640 3 832 8 57,900 3A 1,324 11 60.2 251 8 80,325 104,165 61,645 3B 1,685 10 68.8 68 8 92,725 28,220 70,451 67,400 Total Phase 3 230,950 132,385 132,096 67,400 4A 958 6 36 70 10 52,685 29,050 36,864 4B 1,335 7 35.3 - Residential 6.0 - Commercial 385 8 63,250 159,775 42,291 53,400 Total Phase 4 115,935 188,825 79,155 53,400 Optional 1,793 9 66.9 401 8 99,200 166,415 68,506 71,720 Notes 1. Number of developable lots is estimated based on maximum density allowed by zoning x developable acres. 2. City Sewer Connection Charge (REC) is based on current rate of $415 per unit. 3. City Sewer Area Charge is based on current rate of $1,024 per developable acre. 4. Lateral construction cost is the cost to install an 8 -inch main through the property for lateral service. The developer would be responsible for this cost. 5. If the developer installs the utility the City would be responsible for the oversizing cost, which is the total segment cost minus the lateral cost. Page 43 Table 2 Watermain Trunk Extension Construction Cost Funding Sources Segment Length feet Number of Parcels Served Developable Acres Served Number of Residential Lots Size inches Total Estimated Segment Cost Water REC Charge Water Area Charge Lateral Construction Cost by Developer A 2,086 16 198,170 Al 1,534 1 13.7 27 16 145,730 29,808 52,033 A2 - Alt 1 2,524 9 61.1 174 16 239,780 192,096 232,058 A3 1,958 14 68.3 384 16 186,010 423,936 259,403 A4 1,957 7 69.1 332 12 146,775 366,528 262,442 110,081 A5 1 1,471 1 10 49.7 1 73 112 110,325 80,592 188,761 82,744 A6 3,830 8 44.1 235 16 363,850 259,440 1 $167,492 272,888 Total Phase 1 1,390,640 1,352,400 1,162,188 465,713 B 3,842 13 58.1 - Residential 62.8 - Church 67 12 288,150 73,968 459,178 B1 1,558 5 95.1 570 12 116,850 629,280 361,190 87,638 Total Phase 2 405,000 703,248 820,368 87,638 C 3,970 13 84.9 84 12 297,750 92,736 322,450 73,969 C1 542 12 40,650 30,488 Total Phase 3 338,400 92,736 322,450 104,456 D 962 12 72,150 D1 1,315 9 37.9 - Residential 13.0 - Church 6.0- Commercial 385 12 98,625 425,040 216,106 73,969 E 5,211 12 390,825 Total Phase 4 561,600 425,040 216,106 73,969 A2- Alternate 2 3,098 1 9 1 61.1 1 174 1 16 1 $294,310 1 $192,096 1 $232,058 1 $220.733 Notes 1. Number of developable lots is estimated based on maximum density allowed by zoning x developable acres. 2. City Water Connection Charge (REC) is based on current rate of $1,104 per unit. 3. City Water Area Charge is based on current rate of $3,798 per developable acre. 4. Lateral construction cost is the cost to install an 8 -inch main through the property for lateral service. The developer would be responsible for this cost. 5. If the developer installs the utility the City would be responsible for the oversizing cost, which is the total segment cost minus the lateral cost. Page 44 Appendix E Transportation Development Fee TRIPS GENERATED - 2030 LAND USE PLAN ELEMENT 2030 Comprehensive Plan Transportation Plan Traffic Analysis Zones Total 1,813 17,585 Page 46 2005 Data 2030 Data 2005-2030 Comparison Plymouth TAZ Met Council TAZ TAZ Population Households Employment Retail Non -Retail Total Employment Employment Population Households Retail Employment Non -Retail Employment Total Employment Difference in HH Trips (9.7/du) 8 674 8 20 8 0 0 0 406 174 0 0 0 166 1,612 9 674 9 13 5 0 0 0 476 205 0 0 0 200 1,941 10 674 10 98 38 0 253 253 1,594 685 0 226 226 647 6,274 14 674 14 948 368 0 0 0 2,717 1,168 0 0 0 800 7,757 2030 Comprehensive Plan Transportation Plan Traffic Analysis Zones Total 1,813 17,585 Page 46 TRIPS GENERATED - 2030 TRANSPORTATION PLAN ELEMENT Existing ADT 2030 ADT W3.1756,OG0 - bpp X9,200 010,400 I i 05 -MOIL 34iY I 1= , s wh I I= 2030 Comprehensive Plan Transportation Plan Existing and Future Average Daily Traffic Page 47 Existing ADT 2030 ADT Difference Peony 5,300 10,400 5,100 49.0% CR 47W 3,175 6,000 2,825 47.1% CR 47E 3,715 8,300 4,585 55.2% 54th 0 5,000 5,000 100.0% Total 12,190 29,700 17,510 59.0% Existing ADT 2030 ADT W3.1756,OG0 - bpp X9,200 010,400 I i 05 -MOIL 34iY I 1= , s wh I I= 2030 Comprehensive Plan Transportation Plan Existing and Future Average Daily Traffic Page 47 City of Plymouth Iridin, Qphty da Life REGULAR COUNCIL MEETING September 11, 2012 Agenda 2CNumber: v To: Mayor and City Council Prepared by: Laurie Ahrens, City Manager Item: Set Future Study Sessions ACTION REQUESTED: Establish future study sessions as desired for the topics listed below. Calendars are attached to assist in scheduling. Pending Study Session Topics at least 3 Council members have approved the following study items on the list) Discuss trails (fall 2012) Invite county commissioner to discuss County Road 47 Review Trail Gap Study Discuss Park Replacement Plan Other requests for study session topics: Update with City Manager Update on Northwest Greenway acquisition Review Boulevard Tree Policy Request of Fire Relief Association for pension increase Request from resident to consider ordinance requiring permit for stormwater pond aeration (GB) Domestic Partnership Registration Page 1 r Plymouth Adding Quality to Life September 2012 Modified on 08/29/12 Yard waste Site & Policy for tmergency Utility Kepairs CHANGES ARE MADE IN RED Page 2 1 2 3 4 5 6 7 87:00 PM PLANNING COMMISSION LLABOR DAY MEETING Council Chambers CITY OFFICES CLOSED 9 10 11 12 13 14 155:30 PM 7:00 PM 7:00 PM SPECIAL COUNCIL ENVIRONMENTAL PARK Ii REC MEETING* QUALITY ADVISORY Medicine Lake Room COMMITTEE COMMISSION EQC) MEETING PRAC) MEETING 7:00 PM Council Chambers Plymouth REGULAR COUNCIL Maintenance MEETING Facility Council Chambers 16 17 18 5:30 PM 19 7:00 PM 20 21 22 SPECIAL COUNCIL PLANNING MEETING** COMMISSION Medicine Lake Room MEETING Council Chambers 7:00 PM REGULAR COUNCIL Rosh HoShanah MEETING Begins at Sunset Council Chambers 23 24 25 26 CANCELLED 27 7:00 PM 28 29 PLYMOUTH PLYMOUTH HRA MEETING FIREFIGHTERS 5K ADVISORY Medicine Lake Room Fire Station #2 COMMITTEE ON 11:30 AM TRANSIT (PACT) PLYMOUTH ON STUDY SESSION PARADE Yom Kippur Medicine Lake Room CELEBRATION Begins at Sunset City Center Area Z o NW Area Infa tructure Funding & Major itreet Funding Options Modified on 08/29/12 Yard waste Site & Policy for tmergency Utility Kepairs CHANGES ARE MADE IN RED Page 2 City of Plymouth Adding Quality to Life October 2012 Modified on 08/29/12 Page 3 1 2 3 4 5 6 6:30 PM 7:00 PM VOLUNTEER PLANNING RECOGNITION COMMISSION EVENT MEETING Plymouth Creek Council Chambers Center 7 8jjj 9 7:00 PM 10 7:00 PM 11 7:00 PM 12 13 REGULAR COUNCIL ENVIRONMENTAL PARK It REC 12:00-3:00 PM MEETING QUALITY ADVISORY FIRE DEPT. COLUMBUS DAY Council Chambers COMMITTEE COMMISSION OPEN HOUSE Observed EQC) MEETING PRAC) MEETING Fire Station III Council Chambers Plymouth PLYMOUTH PUBLIC Ice Center WORKS DIVISION CLOSED 14 15 16 17 7:00 PM 18 19 20 PLANNING COMMISSION MEETING Council Chambers 21 22 23 24 25 26 277:00 PM 7:00 PM REGULAR COUNCIL HRA MEETING MEETING Medicine Lake Room Council Chambers 28 29 30 31 6:00-8:00 PM Halloween on the Creek Plymouth Creek Center Modified on 08/29/12 Page 3 City of Plymouth Adding Quality to Life November 2012 Modified on 08/29/12 Page 4 1 2 37:00 PM HUMAN RIGHTS COMMITTEE MEETING Lunch Room 4 5 6 MEE 7 8 9 10 7:00 PM GENERAL PLANNING ELECTION DAY COMMISSION MEETING Council Chambers Daylight Savings Time Ends 11 12 13 7:00 PM 14 7:00 PM 15 7:00 PM 16 17 VETERANS DAY REGULAR COUNCIL. ENVIRONMENTAL HRA MEETING 10:00 AM -5 PM VETERANS DAY Observed MEETING QUALITY Medicine Lake Room PLYMOUTH ARTS CITY OFFICES Council Chambers COMMITTEE FAIR CLOSED EQC) MEETING Plymouth Creek Council Chambers Center 18 19 20 21 22 23 24 CANCELLED 12:00-5 PM PLANNINGPLYMOUTHARTS COMMISSION THANKSGIVING THANKSGIVING FAIR MEETING HOLIDAY HOLIDAY Plymouth Creek Center Council Chambers CITY OFFICES CITY OFFICES CLOSED CLOSED 25 26 27 28 29 30 7:00 PM 7:00 PM REGULAR COUNCIL PLYMOUTH MEETING ADVISORY Council Chambers COMMITTEE ON TRANSIT (PACT) MEETING Medicine Lake Room Modified on 08/29/12 Page 4 City of Plymouth Adding Quality to Life December 2012 Modified on 08/29/12 Page 5 1 2 3 4 5 7:00 PM 6 7 8 PLANNING 2:00-5:00 PM COMMISSION OLD FASHIONED MEETING CHRISTMAS Council Chambers Plymouth Historical Society Building Chanukah Begins at Sunset 9 10 11 12 7:00 PM 13 14 15 7:00 PM ENVIRONMENTAL 7:00 PM REGULAR COUNCIL QUALITY PARK tt REC MEETING COMMITTEE (EQC) ADVISORY Council Chambers MEETING COMMISSION Council Chambers PRAC) MEETING 7:00 PM Council Chambers CHARTER COMMISSION ANNUAL MEETING Medicine Lake Room 16 17 18 19 20 21 22 7:00 PM PLANNING COMMISSION MEETING Council Chambers 23 24 CHRISTEVE AS 25 26 27 7:00 PM 28 29 HRA MEETING CITY Medicine Lake Room OFFICES CHRISTMAS DAY LOSE AT 12:00 P CITY OFFICES CLOSED NEW YEAR'S EVE Modified on 08/29/12 Page 5